@@ -20,24 +20,27 @@ up: "[[conest-projects]]"
|
||||
* [x] [[switchgear-takeoff]]
|
||||
* [x] Lighting Inverters
|
||||
* [x] [[units-takeoff]]
|
||||
* [/] [[fixtures-takeoff]]
|
||||
* [/] Site Lighting
|
||||
* [/] [[lighting-controls-takeoff]]
|
||||
* [/] [[electrical-takeoff]]
|
||||
* [x] [[fixtures-takeoff]]
|
||||
* [x] Site Lighting
|
||||
* [x] [[lighting-controls-takeoff]]
|
||||
* [x] [[electrical-takeoff]]
|
||||
* [x] Residential level 04 lighting inverter(s?) power
|
||||
* [x] [[electrical-takeoff#Trash Chute]]
|
||||
* [ ] [[electrical-takeoff#Unit Condensing Units]]
|
||||
* [x] [[electrical-takeoff#Unit Condensing Units]]
|
||||
* [-] Unit CU control wiring, conduit
|
||||
* [/] EV Chargers
|
||||
* [x] EV Chargers
|
||||
* [x] Pool bonding
|
||||
* [x] [[lighting-controls-takeoff]]
|
||||
* [x] Lighting controls in corridors
|
||||
* [ ] [[telecom-takeoff]]
|
||||
* [ ] Homeruns
|
||||
* [ ] [[low-voltage-takeoff]]
|
||||
* [x] [[telecom-takeoff]]
|
||||
* [x] SLVDB
|
||||
* [x] Backbone
|
||||
* [x] Homeruns
|
||||
* [-] [[low-voltage-takeoff]]
|
||||
* [ ] [[fire-alarm-takeoff]]
|
||||
* [ ] [[two-way-takeoff]]
|
||||
* [ ] [[distributed-antenna-systems-takeoff]]
|
||||
* [ ] [[lightning-protection-takeoff]]
|
||||
* [?] [[lightning-protection-takeoff]]
|
||||
* [ ] [[misc-budgets-takeoff]]
|
||||
* [ ] [[temp-power-takeoff]]
|
||||
|
||||
@@ -123,15 +126,16 @@ DAS Conduit in separate bid item
|
||||
|
||||
#### Awarded to Hedrick Brothers?
|
||||
|
||||
BPM
|
||||
2026-03-23 Nicole Bisbee:
|
||||
Per correspondence from KAST
|
||||
"Please note that KAST has **not** been awarded this project.
|
||||
It appears the project will be undertaken by Hedrick Brothers."
|
||||
> [!quote] Nicole Bisbee 2026-03-23, BPM
|
||||
> Per correspondence from KAST
|
||||
> "Please note that KAST has **not** been awarded this project.
|
||||
> It appears the project will be undertaken by Hedrick Brothers."
|
||||
|
||||
Most recent proposal to KAST is 2026-02-26.
|
||||
Assuming this one can be ignored.
|
||||
|
||||
Confirmed by Joshua Komis 2026-04-20 via Microsoft Teams.
|
||||
|
||||
### AIC Ratings
|
||||
|
||||
> [!quote] E.4.X.1 "RISER NOTES" (B)
|
||||
@@ -142,7 +146,7 @@ Assuming this one can be ignored.
|
||||
|
||||
### Lighting Inverters
|
||||
|
||||
> E.2.1.1 "KEY NOTES" 2
|
||||
> [!quote] E.2.1.1 "KEY NOTES" 2
|
||||
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
||||
|
||||
## Problems to Solve
|
||||
|
||||