vault backup: 2026-05-04 17:15:02
This commit is contained in:
Vendored
+4
-3
@@ -6,9 +6,10 @@
|
|||||||
"theme": "moonstone",
|
"theme": "moonstone",
|
||||||
"baseFontSize": 15,
|
"baseFontSize": 15,
|
||||||
"enabledCssSnippets": [
|
"enabledCssSnippets": [
|
||||||
"tables",
|
|
||||||
"checkboxes",
|
"checkboxes",
|
||||||
"S - Checkboxes",
|
"fix-bold",
|
||||||
"headings"
|
"headings",
|
||||||
|
"tables",
|
||||||
|
"S - Checkboxes"
|
||||||
]
|
]
|
||||||
}
|
}
|
||||||
+28
-20
File diff suppressed because one or more lines are too long
+1
-1
@@ -1,7 +1,7 @@
|
|||||||
{
|
{
|
||||||
"id": "templater-obsidian",
|
"id": "templater-obsidian",
|
||||||
"name": "Templater",
|
"name": "Templater",
|
||||||
"version": "2.19.0",
|
"version": "2.20.0",
|
||||||
"description": "Create and use templates",
|
"description": "Create and use templates",
|
||||||
"minAppVersion": "1.12.2",
|
"minAppVersion": "1.12.2",
|
||||||
"author": "SilentVoid",
|
"author": "SilentVoid",
|
||||||
|
|||||||
+20
-20
@@ -45,20 +45,6 @@ add `ITEM DATABASE`/`WIRING & SYSTEM DEVICES`/`FLOOR BOXES & FITTTINGS`/`GENERIC
|
|||||||
Takeoff homeruns in Building breakdowns,
|
Takeoff homeruns in Building breakdowns,
|
||||||
even where serving Amenity spaces.
|
even where serving Amenity spaces.
|
||||||
|
|
||||||
## Clubline Raceway
|
|
||||||
|
|
||||||
[Raceway Systems - CRG](https://crg.us.com/products/raceway-systems/)
|
|
||||||
|
|
||||||
Clubline Raceway, also called CRG Raceway,
|
|
||||||
is a glorified cable management trough.
|
|
||||||
It is not a [[nfpa-70_376|wireway]],
|
|
||||||
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
|
|
||||||
|
|
||||||
Count receptacles normally,
|
|
||||||
using ==surface-mount EMT assemblies==.
|
|
||||||
|
|
||||||
Create a temporary item for the raceway itself.
|
|
||||||
|
|
||||||
## Mechanical Connections
|
## Mechanical Connections
|
||||||
|
|
||||||
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS ...`/...
|
`COMMON ASSEMBLIES`/`MECHANICAL CONNECTIONS ...`/...
|
||||||
@@ -74,12 +60,12 @@ per [[fire-resistive-wiring-methods-takeoff]].
|
|||||||
|
|
||||||
#### Unit Condensing Units
|
#### Unit Condensing Units
|
||||||
|
|
||||||
| Level | Horizontal | Vertical | Length | Count |
|
| Level | Horizontal | Vertical | Length |
|
||||||
|:-------- | ----------:| --------:| ------:| -----:|
|
|:-------- | ----------:| --------:| ------:|
|
||||||
| Level 01 | 150 | 40 | 190 | |
|
| Level 01 | 150 | 40 | 190 |
|
||||||
| Level 02 | 150 | 30 | 180 | |
|
| Level 02 | 150 | 30 | 180 |
|
||||||
| Level 03 | 150 | 20 | 170 | |
|
| Level 03 | 150 | 20 | 170 |
|
||||||
| Level 04 | 150 | 10 | 160 | |
|
| Level 04 | 150 | 10 | 160 |
|
||||||
|
|
||||||
Put homeruns on the `Area` of the dwelling unit.
|
Put homeruns on the `Area` of the dwelling unit.
|
||||||
Put connections on the `Area` of the CU.
|
Put connections on the `Area` of the CU.
|
||||||
@@ -123,3 +109,17 @@ Max 20 disconnects per rack
|
|||||||
### Fire/Smoke Dampers
|
### Fire/Smoke Dampers
|
||||||
|
|
||||||
[[fire-alarm-takeoff#Fire/Smoke Dampers (FSD's)]]
|
[[fire-alarm-takeoff#Fire/Smoke Dampers (FSD's)]]
|
||||||
|
|
||||||
|
## Clubline Raceway
|
||||||
|
|
||||||
|
[Raceway Systems - CRG](https://crg.us.com/products/raceway-systems/)
|
||||||
|
|
||||||
|
Clubline Raceway, also called CRG Raceway,
|
||||||
|
is a glorified cable management trough.
|
||||||
|
It is not a [[nfpa-70_376|wireway]],
|
||||||
|
so conductors must be run in a [[nfpa-70_national-electric-code#Chapter 3 Wiring Methods and Materials|Chapter 3]] wiring method.
|
||||||
|
|
||||||
|
Count receptacles normally,
|
||||||
|
using ==surface-mount EMT assemblies==.
|
||||||
|
|
||||||
|
Create a temporary item for the raceway itself.
|
||||||
+5
-4
@@ -25,10 +25,11 @@ up: "[[takeoff-scripts]]"
|
|||||||
|
|
||||||
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
All feeder takeoff descriptions should be prefixed with `<parent> TO <child>`
|
||||||
|
|
||||||
> [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)
|
It is acceptable to use typicals for identical feeders
|
||||||
> It is acceptable to use typicals for identical feeders
|
(i.e. meter centers fed from bus plugs)
|
||||||
> (i.e. meter centers fed from bus plugs)
|
so long as the typical is in `Area` = "01 - Feeders/Risers ...".[^1]
|
||||||
> so long as the typical is in `Area` = "01 - Feeders/Risers ...".
|
|
||||||
|
[^1]: [[2025-08-15_14-15-41]]
|
||||||
|
|
||||||
### Routing
|
### Routing
|
||||||
|
|
||||||
|
|||||||
@@ -21,8 +21,8 @@ up: "[[takeoff-scripts]]"
|
|||||||
|
|
||||||
Free Air < PVC in Slab < EMT
|
Free Air < PVC in Slab < EMT
|
||||||
|
|
||||||
_High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.[^1]
|
* _High Rise (Steel & slab):_ Free air in Units, use conduit elsewhere.[^1]
|
||||||
_Mid Rise, High Density (Wood frame):_ Free air, conduit only where required.
|
* _Mid Rise, High Density (Wood frame):_ Free air, conduit only where required.
|
||||||
|
|
||||||
[^1]: [[2026-02-26_10-06-19]]
|
[^1]: [[2026-02-26_10-06-19]]
|
||||||
|
|
||||||
|
|||||||
@@ -18,3 +18,8 @@ or concrete-encasement can fulfill this requirement.
|
|||||||
If "Lifeline" (cable-in-conduit) cable is used,
|
If "Lifeline" (cable-in-conduit) cable is used,
|
||||||
utilize EMT-Comp assemblies.
|
utilize EMT-Comp assemblies.
|
||||||
|
|
||||||
|
> [!info] "Vitalink" vs "Lifeline" cable
|
||||||
|
> VITALink® and Lifeline® are brand names
|
||||||
|
> (of Omni Cable and Prysmian Group respectively),
|
||||||
|
> not cable types.
|
||||||
|
> _Both_ brands include MC _and_ CIC cables.
|
||||||
|
|||||||
@@ -51,14 +51,6 @@ and power brought to the enclosure through a conventional raceway.
|
|||||||
|
|
||||||
### Fire Resistive Cable-in-Conduit (CIC)
|
### Fire Resistive Cable-in-Conduit (CIC)
|
||||||
|
|
||||||
### Notes
|
|
||||||
|
|
||||||
> [!info] "Vitalink" vs "Lifeline" cable ^vitalink-vs-lifeline
|
|
||||||
> VITALink® and Lifeline® are brand names
|
|
||||||
> (of Omni Cable and Prysmian Group respectively),
|
|
||||||
> not cable types.
|
|
||||||
> _Both_ brands include MC _and_ CIC cables.
|
|
||||||
|
|
||||||
## Resources
|
## Resources
|
||||||
|
|
||||||
[VITALink Fire-Rated Cables | OmniCable](https://www.omnicable.com/vitalink/)
|
[VITALink Fire-Rated Cables | OmniCable](https://www.omnicable.com/vitalink/)
|
||||||
|
|||||||
@@ -5,6 +5,7 @@ tags:
|
|||||||
- occupational/takeoff
|
- occupational/takeoff
|
||||||
- status/draft
|
- status/draft
|
||||||
- type/guide
|
- type/guide
|
||||||
|
up: "[[feeders-takeoff]]"
|
||||||
---
|
---
|
||||||
# Grounding Takeoff
|
# Grounding Takeoff
|
||||||
|
|
||||||
@@ -44,11 +45,9 @@ not especially consistent with the actual install.
|
|||||||
|
|
||||||
> [!important]
|
> [!important]
|
||||||
> This scope is included here for its similarity in content.
|
> This scope is included here for its similarity in content.
|
||||||
> It may be more appropriate in [[electrical-takeoff]]
|
> It may be more appropriate in [[electrical-takeoff]].[^1]
|
||||||
|
|
||||||
> [!quote] [[joel-jansen]] 2026-01-20T16:30 (pp.)
|
[^1]: [[2026-01-20_16-30-00]]
|
||||||
> [[josh-ford]] prefers it in electrical, but I'm not concerned.
|
|
||||||
> So long as it's named "Pool Bonding" it's fine.
|
|
||||||
|
|
||||||
1. * `Area` = _Contentious_
|
1. * `Area` = _Contentious_
|
||||||
|
|
||||||
|
|||||||
@@ -6,6 +6,12 @@ title: Heating Designations
|
|||||||
---
|
---
|
||||||
# Heating Designations
|
# Heating Designations
|
||||||
|
|
||||||
|
All designation types
|
||||||
|
("FIXTURES", "SWITCHGEAR", and "HEATING")
|
||||||
|
behave identically,
|
||||||
|
but are used for different purposes.
|
||||||
|
"HEATING" is used for _uncertain scope_.
|
||||||
|
|
||||||
> [!tip]
|
> [!tip]
|
||||||
> It is sometimes easier to rebuild a designation than to modify it.
|
> It is sometimes easier to rebuild a designation than to modify it.
|
||||||
> For designations with existing takeoffs, Right-Click > `Empty Designation`.
|
> For designations with existing takeoffs, Right-Click > `Empty Designation`.
|
||||||
|
|||||||
+20
-16
@@ -20,24 +20,27 @@ up: "[[conest-projects]]"
|
|||||||
* [x] [[switchgear-takeoff]]
|
* [x] [[switchgear-takeoff]]
|
||||||
* [x] Lighting Inverters
|
* [x] Lighting Inverters
|
||||||
* [x] [[units-takeoff]]
|
* [x] [[units-takeoff]]
|
||||||
* [/] [[fixtures-takeoff]]
|
* [x] [[fixtures-takeoff]]
|
||||||
* [/] Site Lighting
|
* [x] Site Lighting
|
||||||
* [/] [[lighting-controls-takeoff]]
|
* [x] [[lighting-controls-takeoff]]
|
||||||
* [/] [[electrical-takeoff]]
|
* [x] [[electrical-takeoff]]
|
||||||
* [x] Residential level 04 lighting inverter(s?) power
|
* [x] Residential level 04 lighting inverter(s?) power
|
||||||
* [x] [[electrical-takeoff#Trash Chute]]
|
* [x] [[electrical-takeoff#Trash Chute]]
|
||||||
* [ ] [[electrical-takeoff#Unit Condensing Units]]
|
* [x] [[electrical-takeoff#Unit Condensing Units]]
|
||||||
* [-] Unit CU control wiring, conduit
|
* [-] Unit CU control wiring, conduit
|
||||||
* [/] EV Chargers
|
* [x] EV Chargers
|
||||||
|
* [x] Pool bonding
|
||||||
* [x] [[lighting-controls-takeoff]]
|
* [x] [[lighting-controls-takeoff]]
|
||||||
* [x] Lighting controls in corridors
|
* [x] Lighting controls in corridors
|
||||||
* [ ] [[telecom-takeoff]]
|
* [x] [[telecom-takeoff]]
|
||||||
* [ ] Homeruns
|
* [x] SLVDB
|
||||||
* [ ] [[low-voltage-takeoff]]
|
* [x] Backbone
|
||||||
|
* [x] Homeruns
|
||||||
|
* [-] [[low-voltage-takeoff]]
|
||||||
* [ ] [[fire-alarm-takeoff]]
|
* [ ] [[fire-alarm-takeoff]]
|
||||||
* [ ] [[two-way-takeoff]]
|
* [ ] [[two-way-takeoff]]
|
||||||
* [ ] [[distributed-antenna-systems-takeoff]]
|
* [ ] [[distributed-antenna-systems-takeoff]]
|
||||||
* [ ] [[lightning-protection-takeoff]]
|
* [?] [[lightning-protection-takeoff]]
|
||||||
* [ ] [[misc-budgets-takeoff]]
|
* [ ] [[misc-budgets-takeoff]]
|
||||||
* [ ] [[temp-power-takeoff]]
|
* [ ] [[temp-power-takeoff]]
|
||||||
|
|
||||||
@@ -123,15 +126,16 @@ DAS Conduit in separate bid item
|
|||||||
|
|
||||||
#### Awarded to Hedrick Brothers?
|
#### Awarded to Hedrick Brothers?
|
||||||
|
|
||||||
BPM
|
> [!quote] Nicole Bisbee 2026-03-23, BPM
|
||||||
2026-03-23 Nicole Bisbee:
|
> Per correspondence from KAST
|
||||||
Per correspondence from KAST
|
> "Please note that KAST has **not** been awarded this project.
|
||||||
"Please note that KAST has **not** been awarded this project.
|
> It appears the project will be undertaken by Hedrick Brothers."
|
||||||
It appears the project will be undertaken by Hedrick Brothers."
|
|
||||||
|
|
||||||
Most recent proposal to KAST is 2026-02-26.
|
Most recent proposal to KAST is 2026-02-26.
|
||||||
Assuming this one can be ignored.
|
Assuming this one can be ignored.
|
||||||
|
|
||||||
|
Confirmed by Joshua Komis 2026-04-20 via Microsoft Teams.
|
||||||
|
|
||||||
### AIC Ratings
|
### AIC Ratings
|
||||||
|
|
||||||
> [!quote] E.4.X.1 "RISER NOTES" (B)
|
> [!quote] E.4.X.1 "RISER NOTES" (B)
|
||||||
@@ -142,7 +146,7 @@ Assuming this one can be ignored.
|
|||||||
|
|
||||||
### Lighting Inverters
|
### Lighting Inverters
|
||||||
|
|
||||||
> E.2.1.1 "KEY NOTES" 2
|
> [!quote] E.2.1.1 "KEY NOTES" 2
|
||||||
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
||||||
|
|
||||||
## Problems to Solve
|
## Problems to Solve
|
||||||
|
|||||||
@@ -6,6 +6,14 @@ up: "[[electrical-construction]]"
|
|||||||
---
|
---
|
||||||
# Lighting Controls
|
# Lighting Controls
|
||||||
|
|
||||||
|
## Requirements
|
||||||
|
|
||||||
|
[[iecc_c405]]
|
||||||
|
|
||||||
|
### Electrical Rooms
|
||||||
|
|
||||||
|
[[nfpa-70_110_requirements#110.26(D) Illumination.|NEC 110.26(D)]]
|
||||||
|
|
||||||
## Sensor Types
|
## Sensor Types
|
||||||
|
|
||||||
* Occupancy
|
* Occupancy
|
||||||
|
|||||||
@@ -712,7 +712,7 @@ Intermediate supports shall be provided
|
|||||||
as necessary to limit supported conductor lengths
|
as necessary to limit supported conductor lengths
|
||||||
to not greater than those values specified in Table 300.19(A).
|
to not greater than those values specified in Table 300.19(A).
|
||||||
|
|
||||||
#### Table 300.19(A) Spacings for Conductor Supports
|
##### Table 300.19(A) Spacings for Conductor Supports
|
||||||
|
|
||||||
| Conductor Size | Aluminum or Copper-Clad Aluminum | Copper |
|
| Conductor Size | Aluminum or Copper-Clad Aluminum | Copper |
|
||||||
| -------------------------------- | --------------------------------:| ------:|
|
| -------------------------------- | --------------------------------:| ------:|
|
||||||
|
|||||||
@@ -0,0 +1,10 @@
|
|||||||
|
---
|
||||||
|
id: 2026-05-03
|
||||||
|
title: 2026-05-03
|
||||||
|
tags: []
|
||||||
|
weekly: "[[2026w19]]"
|
||||||
|
monthly: "[[2026-05]]"
|
||||||
|
quarterly: "[[2026q2]]"
|
||||||
|
previous: "[[2026-05-02]]"
|
||||||
|
---
|
||||||
|
# 2026-05-03
|
||||||
@@ -0,0 +1,22 @@
|
|||||||
|
---
|
||||||
|
id: 2026-05-04
|
||||||
|
title: 2026-05-04
|
||||||
|
tags: []
|
||||||
|
weekly: "[[2026w19]]"
|
||||||
|
monthly: "[[2026-05]]"
|
||||||
|
quarterly: "[[2026q2]]"
|
||||||
|
previous: "[[2026-05-03]]"
|
||||||
|
---
|
||||||
|
# 2026-05-04
|
||||||
|
|
||||||
|
This morning I woke up to my alarm at 05:10
|
||||||
|
not especially groggy and feeling like I could start my routine.
|
||||||
|
Because I didn't have anything planned
|
||||||
|
and I didn't get to sleep until almost midnight
|
||||||
|
I went back to sleep anyway.
|
||||||
|
I woke up to my second alarm at 06:00
|
||||||
|
feeling like I'd been hit by a train.
|
||||||
|
I didn't get out of bed until after 06:10.
|
||||||
|
|
||||||
|
Today progress on [[hilltop-gardens]]
|
||||||
|
has been delayed due to an issue with our cloud storage provider.
|
||||||
+18
-33
@@ -14,46 +14,31 @@ up: "[[general-takeoff]]"
|
|||||||
Provide sleeves for all conduits passing through floors,
|
Provide sleeves for all conduits passing through floors,
|
||||||
as well as any additional sleeves shown on the drawings.
|
as well as any additional sleeves shown on the drawings.
|
||||||
|
|
||||||
## Note: Application
|
> [!important]
|
||||||
|
> The term "sleeve" may refer to
|
||||||
The term "sleeve" may refer to
|
>
|
||||||
|
> * a short length of conduit
|
||||||
* a short length of conduit
|
>
|
||||||
|
> * a Hilti-type firestop sleeve assembly
|
||||||
* a Hilti-type firestop sleeve assembly
|
>
|
||||||
|
> * a short length of conduit
|
||||||
* a short length of conduit
|
> _in_ a Hilti-type firestop sleeve assembly
|
||||||
_in_ a Hilti-type firestop sleeve assembly
|
>
|
||||||
|
> Seek additional clarification.
|
||||||
Seek additional clarification.
|
|
||||||
|
|
||||||
## Breakdowns
|
## Breakdowns
|
||||||
|
|
||||||
> [!quote] [[joel-jansen]] 2026-02-02 12:10, while reviewing Howard University East Towers (pp.)
|
Match breakdowns of the relevant system,
|
||||||
> Match breakdowns of the relevant system,
|
i.e. don't change breakdowns after taking off
|
||||||
> i.e. don't change breakdowns after taking off
|
the assembly to be sleeved.[^1]
|
||||||
> the assembly to be sleeved.
|
|
||||||
|
[^1]: [[2026-02-02_12-18-00]]
|
||||||
|
|
||||||
## Item Selection
|
## Item Selection
|
||||||
|
|
||||||
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
`ITEM DATABASE`/`HILTI`/`CAST-IN DEVICE CP 680-...`
|
||||||
|
|
||||||
* **CP 680-P** --- For plastic conduit
|
* **CP 680-P** --- For plastic conduit
|
||||||
* **CP 680-M** --- For metal conduit
|
* **CP 680-M** --- For metal conduit[^2]
|
||||||
|
|
||||||
> [!quote] [CP 680-M | Hilti.com](https://www.hilti.com/c/CLS_FIRESTOP_PROTECTION_7131/CLS_FIRESTOP_DEVICES_SLEEVES_7131/r3622)
|
[^2]: [CP 680-M | Hilti.com](https://www.hilti.com/c/CLS_FIRESTOP_PROTECTION_7131/CLS_FIRESTOP_DEVICES_SLEEVES_7131/r3622)
|
||||||
> ### Installation and applications
|
|
||||||
>
|
|
||||||
> * Concrete floors from 2.5" (63 mm) thickness for either flat concrete or concrete over metal deck
|
|
||||||
>
|
|
||||||
> **CP 680-M:**
|
|
||||||
> * Insulated and non-insulated metal pipes
|
|
||||||
> * EMT and electrical conduits
|
|
||||||
> * Cable bundles
|
|
||||||
> * Multiple pipes
|
|
||||||
>
|
|
||||||
> **CP 680-P:**
|
|
||||||
> Addresses all applications for CP 680-M as well as the
|
|
||||||
> following:
|
|
||||||
> * Plastic pipes such as PVC, CPVC, ABS, ENT and FRPP
|
|
||||||
> * Fresh and waste water pipes
|
|
||||||
|
|||||||
@@ -4,3 +4,29 @@ tags: []
|
|||||||
up: "[[conest]]"
|
up: "[[conest]]"
|
||||||
---
|
---
|
||||||
# Takeoff Scripts
|
# Takeoff Scripts
|
||||||
|
|
||||||
|
Scripts should be directed,
|
||||||
|
limiting extraneous information.
|
||||||
|
|
||||||
|
## Citations
|
||||||
|
|
||||||
|
Use footnotes to reference timestamped notes.
|
||||||
|
|
||||||
|
Do this:
|
||||||
|
|
||||||
|
```markdown
|
||||||
|
Even when drawings show 2 separate duplex receptacles,
|
||||||
|
use `DW & DISPOSAL DUAL CIR - ...`,
|
||||||
|
which includes only one receptacle.[^1]
|
||||||
|
|
||||||
|
[^1]: [[2026-01-12_10-42-30#Unit Dishwasher/Disposal]]
|
||||||
|
```
|
||||||
|
|
||||||
|
not this:
|
||||||
|
|
||||||
|
```markdown
|
||||||
|
> [!quote] [[joel-jansen]] 2026-01-12 in reference to [[woodbrook]] (pp.)
|
||||||
|
> Even when drawings show 2 separate duplex receptacles,
|
||||||
|
> use `DW & DISPOSAL DUAL CIR - ...`,
|
||||||
|
> which includes only one receptacle.
|
||||||
|
```
|
||||||
+9
-6
@@ -22,7 +22,7 @@ Where `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/...
|
|||||||
is specified, `FEEDER CONDUIT AND WIRE`/...
|
is specified, `FEEDER CONDUIT AND WIRE`/...
|
||||||
is also acceptable.
|
is also acceptable.
|
||||||
|
|
||||||
## "Site Low Voltage Duct Bank"
|
## Site Low Voltage Duct Bank
|
||||||
|
|
||||||
1. * `Area` = "2 - Site"
|
1. * `Area` = "2 - Site"
|
||||||
* `Phase` = "Site"
|
* `Phase` = "Site"
|
||||||
@@ -58,7 +58,9 @@ Alternative
|
|||||||
* `Phase` = "Building - BOH ..."
|
* `Phase` = "Building - BOH ..."
|
||||||
* `System` = "TC - Telecom Backbone"
|
* `System` = "TC - Telecom Backbone"
|
||||||
|
|
||||||
(2) 4"C or (4) 4"C if not shown
|
If not shown:
|
||||||
|
* _Garden Style:_ (2) 4"C
|
||||||
|
* _High Rise, Mid Rise:_ (4) 4"C
|
||||||
|
|
||||||
### Horizontal Backbone
|
### Horizontal Backbone
|
||||||
|
|
||||||
@@ -78,7 +80,7 @@ Alternative
|
|||||||
* Delete elbows if unnecessary.
|
* Delete elbows if unnecessary.
|
||||||
* **Length** = Height between floors (Minimum 15ft)
|
* **Length** = Height between floors (Minimum 15ft)
|
||||||
|
|
||||||
## Telecom Backboard
|
## Telecom Backboards
|
||||||
|
|
||||||
As shown on plans,
|
As shown on plans,
|
||||||
only if not excluded in proposal.
|
only if not excluded in proposal.
|
||||||
@@ -89,7 +91,7 @@ only if not excluded in proposal.
|
|||||||
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
|
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
|
||||||
* **Count** = As shown
|
* **Count** = As shown
|
||||||
|
|
||||||
## Corridor Conduit (Unit MSDE to IDF)
|
## Corridor Conduit (IDF to Unit MSDE)
|
||||||
|
|
||||||
One Takeoff per Area per level
|
One Takeoff per Area per level
|
||||||
|
|
||||||
@@ -97,6 +99,7 @@ One Takeoff per Area per level
|
|||||||
* **Length** = Average of subfeed lengths * # of Units
|
* **Length** = Average of subfeed lengths * # of Units
|
||||||
* **Count** = # of Units
|
* **Count** = # of Units
|
||||||
|
|
||||||
|
[[2026-05-04_14-57-49]]
|
||||||
## Inner Duct
|
## Inner Duct
|
||||||
|
|
||||||
For future use (e.g. fiber)
|
For future use (e.g. fiber)
|
||||||
@@ -112,8 +115,8 @@ _Alternative:_
|
|||||||
## Devices
|
## Devices
|
||||||
|
|
||||||
As shown on plans.
|
As shown on plans.
|
||||||
Ignore scope shared with [[electrical-takeoff|electrical]].
|
Ignore scope shared with [[electrical-takeoff|electrical]]
|
||||||
(e.g. floor boxes)
|
(e.g. floor boxes).
|
||||||
|
|
||||||
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
|
1. `COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
|
||||||
* .../`BOH / AMENITY ASSEMBLIES`
|
* .../`BOH / AMENITY ASSEMBLIES`
|
||||||
|
|||||||
+2
-1
@@ -9,6 +9,7 @@ previous: "[[<% moment(tp.file.title, 'YYYY-MM-DD').subtract(1,'days').format('Y
|
|||||||
---
|
---
|
||||||
# <% tp.file.title %>
|
# <% tp.file.title %>
|
||||||
<%*
|
<%*
|
||||||
// ensure monthly note
|
// ensure parents
|
||||||
await tp.user.ensure_exists(tp, "monthly", tp.file.title.slice(0, 7), false, "periodic/monthly")
|
await tp.user.ensure_exists(tp, "monthly", tp.file.title.slice(0, 7), false, "periodic/monthly")
|
||||||
|
await tp.user.ensure_exists(tp, "weekly", moment(tp.file.title, 'YYYY-MM-DD').format('gggg[w]ww'), false, "periodic/weekly")
|
||||||
%>
|
%>
|
||||||
@@ -33,4 +33,7 @@ else if (/^20\d\d$/.test(title)) {
|
|||||||
await tp.app.vault.delete(file);
|
await tp.app.vault.delete(file);
|
||||||
await tp.file.create_new(tp.file.find_tfile("yearly"), title, true, "periodic/yearly");
|
await tp.file.create_new(tp.file.find_tfile("yearly"), title, true, "periodic/yearly");
|
||||||
}
|
}
|
||||||
|
else {
|
||||||
|
// await tp.file.create_new(tp.file.find_tfile("untitled"), title, true, "");
|
||||||
|
}
|
||||||
%>
|
%>
|
||||||
@@ -1,4 +1,7 @@
|
|||||||
---
|
---
|
||||||
|
aliases:
|
||||||
|
- BOTNS
|
||||||
|
- The Book of the New Sun
|
||||||
title: The Book of the New Sun
|
title: The Book of the New Sun
|
||||||
tags:
|
tags:
|
||||||
- topic/hobbies/reading
|
- topic/hobbies/reading
|
||||||
|
|||||||
@@ -0,0 +1,18 @@
|
|||||||
|
---
|
||||||
|
id: 2025-08-15T14:15:41-0400
|
||||||
|
title: 2025-08-15 14:15:41
|
||||||
|
tags: []
|
||||||
|
daily: "[[2025-08-15]]"
|
||||||
|
---
|
||||||
|
# 2025-08-15 14:15:41
|
||||||
|
|
||||||
|
Exact date of quote unknown.
|
||||||
|
Assumed date is that of commit 85d30c0,
|
||||||
|
the first commit the quote appeared
|
||||||
|
in its previous location [[feeders-takeoff]],
|
||||||
|
formerly "feeders.md".
|
||||||
|
|
||||||
|
> [!cite] [[joel-jansen]], in reference to Omni Hotels Raleigh (pp.)
|
||||||
|
> It is acceptable to use typicals for identical feeders
|
||||||
|
> (i.e. meter centers fed from bus plugs)
|
||||||
|
> so long as the typical is in `Area` = "01 - Feeders/Risers ...".
|
||||||
@@ -0,0 +1,20 @@
|
|||||||
|
---
|
||||||
|
id: 2025-11-11T00:00:00-0500
|
||||||
|
title: 2025-11-11 ??:??:??
|
||||||
|
tags: []
|
||||||
|
daily: "[[2025-11-11]]"
|
||||||
|
---
|
||||||
|
# 2025-11-11 ??:??:??
|
||||||
|
|
||||||
|
> [!quote] [[joel-jansen]] 2025-11-11, pp.
|
||||||
|
>
|
||||||
|
> For N5-15R/N5-20R receptacles serving fixed equipment such as:
|
||||||
|
>
|
||||||
|
> * refrigerators
|
||||||
|
> * gas ranges
|
||||||
|
> * microwaves
|
||||||
|
> * clothes washers
|
||||||
|
> * hood fans
|
||||||
|
>
|
||||||
|
> match the receptacle configuration shown on the plans
|
||||||
|
> (i.e. simplex to simplex, duplex to duplex).
|
||||||
@@ -11,6 +11,10 @@ daily: "[[2025-12-03]]"
|
|||||||
|
|
||||||
## Excluding Vs. Ignoring Project Requirements
|
## Excluding Vs. Ignoring Project Requirements
|
||||||
|
|
||||||
|
%%
|
||||||
|
A criticism of an observed lack of [[transparency]] in [[construction-estimating]].
|
||||||
|
%%
|
||||||
|
|
||||||
There is a distinct difference between _excluding_ and _ignoring_ requirements.
|
There is a distinct difference between _excluding_ and _ignoring_ requirements.
|
||||||
|
|
||||||
If, before award, you communicate to the customer
|
If, before award, you communicate to the customer
|
||||||
|
|||||||
@@ -12,7 +12,9 @@ daily: "[[2025-12-10]]"
|
|||||||
|
|
||||||
## ConEst Lighting Controls Meeting Notes
|
## ConEst Lighting Controls Meeting Notes
|
||||||
|
|
||||||
Related: [[lighting-controls-takeoff]]
|
Meeting of all members of electrical [[conest|ConEst]]
|
||||||
|
to discuss [[lighting-controls-takeoff]]
|
||||||
|
lead by [[corwin-fluit]].
|
||||||
|
|
||||||
### Minutes
|
### Minutes
|
||||||
|
|
||||||
@@ -57,7 +59,8 @@ The lighting control problem is misunderstood.
|
|||||||
It's true that some technical training would be beneficial to ConEst estimators,
|
It's true that some technical training would be beneficial to ConEst estimators,
|
||||||
but root of the problem has nothing to do with lighting control.
|
but root of the problem has nothing to do with lighting control.
|
||||||
|
|
||||||
When I heard [[#^ex]], where lighting control went wrong
|
When I heard [[#^ex|Corwin's example]],
|
||||||
|
where lighting control went wrong
|
||||||
and costed a job half a million in profit,
|
and costed a job half a million in profit,
|
||||||
what I took away was that we sold high-risk scope
|
what I took away was that we sold high-risk scope
|
||||||
without knowing what was required _and without qualification_.
|
without knowing what was required _and without qualification_.
|
||||||
|
|||||||
@@ -7,7 +7,7 @@ daily: "[[2025-12-12]]"
|
|||||||
---
|
---
|
||||||
# 2025-12-12 09:38:52
|
# 2025-12-12 09:38:52
|
||||||
|
|
||||||
A humorous exchange between a peer in estimating and myself:
|
A humorous exchange between a peer in [[conest|ConEst]] and myself:
|
||||||
|
|
||||||
> **Peer:** "Your research will one day cure estimator's brain,
|
> **Peer:** "Your research will one day cure estimator's brain,
|
||||||
> a disease sweeping across \[our\] floor"
|
> a disease sweeping across \[our\] floor"
|
||||||
|
|||||||
@@ -9,7 +9,7 @@ daily: "[[2025-12-17]]"
|
|||||||
|
|
||||||
%% [[statistical-modeling-for-construction-estimating]] %%
|
%% [[statistical-modeling-for-construction-estimating]] %%
|
||||||
|
|
||||||
One aspect of estimating that I find most interesting,
|
One aspect of [[construction-estimating]] that I find most interesting,
|
||||||
but that is criminally understudied,
|
but that is criminally understudied,
|
||||||
is the effect of building dimensions
|
is the effect of building dimensions
|
||||||
(footprint shape, floor area, stories, height)
|
(footprint shape, floor area, stories, height)
|
||||||
|
|||||||
@@ -1,9 +0,0 @@
|
|||||||
---
|
|
||||||
id: 2025-12-18T08:32:18-0500
|
|
||||||
title: 2025-12-18 08:32:18
|
|
||||||
tags:
|
|
||||||
daily: "[[2025-12-18]]"
|
|
||||||
---
|
|
||||||
# 2025-12-18 08:32:18
|
|
||||||
|
|
||||||
[[uncertainty-in-construction-estimating]]
|
|
||||||
@@ -9,7 +9,7 @@ daily: "[[2025-12-18]]"
|
|||||||
## Estimating Golf
|
## Estimating Golf
|
||||||
|
|
||||||
What interests me most in [[construction-estimating]]
|
What interests me most in [[construction-estimating]]
|
||||||
is an idea you might call "estimating golf":
|
is an idea you might call [[estimating-golf|"estimating golf"]]:
|
||||||
the goal is to produce a satisfactory[^1] estimate,
|
the goal is to produce a satisfactory[^1] estimate,
|
||||||
but the estimator can not view the project documents
|
but the estimator can not view the project documents
|
||||||
and must instead ask questions about the job
|
and must instead ask questions about the job
|
||||||
|
|||||||
@@ -7,8 +7,11 @@ daily: "[[2026-01-04]]"
|
|||||||
---
|
---
|
||||||
# 2026-01-04 ??:??:??
|
# 2026-01-04 ??:??:??
|
||||||
|
|
||||||
Horror is usually made more horrifying by the inclusion of one or more persons who do not find the situation horrifying.
|
Horror is usually made more horrifying
|
||||||
|
by the inclusion of one or more persons
|
||||||
|
who do not find the situation horrifying.
|
||||||
|
|
||||||
One cannibal is bad, a society of cannibals is worse than the sum.
|
One cannibal is bad,
|
||||||
|
a society of cannibals is worse than the sum.
|
||||||
|
|
||||||
Book of the New Sun Severian
|
[[the-book-of-the-new-sun|The Book of the New Sun]] Severian
|
||||||
|
|||||||
@@ -9,6 +9,11 @@ daily: "[[2026-01-05]]"
|
|||||||
|
|
||||||
## Bluebeam Scripting
|
## Bluebeam Scripting
|
||||||
|
|
||||||
|
%%
|
||||||
|
Documentation on scripting
|
||||||
|
for [[pdf]] editor Bluebeam Revu.
|
||||||
|
%%
|
||||||
|
|
||||||
### Built-In
|
### Built-In
|
||||||
|
|
||||||
C:\Program Files\Bluebeam Software\Bluebeam Revu\21\Help\Bluebeam Script Reference.pdf
|
C:\Program Files\Bluebeam Software\Bluebeam Revu\21\Help\Bluebeam Script Reference.pdf
|
||||||
|
|||||||
@@ -2,11 +2,11 @@
|
|||||||
id: 2026-01-07T06:41:00-0500
|
id: 2026-01-07T06:41:00-0500
|
||||||
title: 2026-01-07 06:41:??
|
title: 2026-01-07 06:41:??
|
||||||
tags:
|
tags:
|
||||||
|
- exclude-from-word-count
|
||||||
daily: "[[2026-01-07]]"
|
daily: "[[2026-01-07]]"
|
||||||
---
|
---
|
||||||
# 2026-01-07 06:41:??
|
# 2026-01-07 06:41:??
|
||||||
|
|
||||||
> [!quote] _The Shadow of the Torturer_, Chapter 17: "The Challenge"
|
|
||||||
> No intellect is needed to see those figures who wait beyond the void of death---
|
> No intellect is needed to see those figures who wait beyond the void of death---
|
||||||
> every child is aware of them, blazing with glories dark or bright,
|
> every child is aware of them, blazing with glories dark or bright,
|
||||||
> wrapped in authority older than the universe.
|
> wrapped in authority older than the universe.
|
||||||
@@ -21,4 +21,6 @@ daily: "[[2026-01-07]]"
|
|||||||
> (though we obey the orders of some prosaic person every day) our own masters,
|
> (though we obey the orders of some prosaic person every day) our own masters,
|
||||||
> when the truth is that our masters are sleeping.
|
> when the truth is that our masters are sleeping.
|
||||||
> One wakes within us and we are ridden like beasts,
|
> One wakes within us and we are ridden like beasts,
|
||||||
> though the rider is but some hitherto unguessed part of ourselves.
|
> though the rider is but some hitherto unguessed part of ourselves.[^1]
|
||||||
|
|
||||||
|
[^1]: [[wolfe_1980_shadow#XVII - The Challenge]]
|
||||||
|
|||||||
@@ -1,10 +1,16 @@
|
|||||||
---
|
---
|
||||||
id: 2026-01-07T10:03:00-0500
|
id: 2026-01-07T10:03:00-0500
|
||||||
title: 2026-01-07 10:03:??
|
title: 2026-01-07 10:03:??
|
||||||
tags:
|
tags: []
|
||||||
daily: "[[2026-01-07]]"
|
daily: "[[2026-01-07]]"
|
||||||
---
|
---
|
||||||
# 2026-01-07 10:03:??
|
# 2026-01-07 10:03:??
|
||||||
|
|
||||||
At Ace, "residential" always meant single-family/duplex construction,
|
%%
|
||||||
|
Speculation about the meaning of [[construction]] terminology
|
||||||
|
as understood by other contractors.
|
||||||
|
%%
|
||||||
|
|
||||||
|
At [[ace-electric-inc|Ace]],
|
||||||
|
"residential" always meant single-family/duplex construction,
|
||||||
but I think now we were the outliers.
|
but I think now we were the outliers.
|
||||||
|
|||||||
@@ -6,13 +6,14 @@ daily: "[[2026-01-09]]"
|
|||||||
---
|
---
|
||||||
# 2026-01-09 16:28:??
|
# 2026-01-09 16:28:??
|
||||||
|
|
||||||
### Occam's razor
|
### Occam's Razor
|
||||||
|
|
||||||
> [!info] Also Known As
|
> [!info] Also Known As
|
||||||
> * the principle of parsimony
|
> * the principle of parsimony
|
||||||
> * the law of parsimony
|
> * the law of parsimony
|
||||||
|
|
||||||
recommends searching for explanations constructed with the smallest possible set of elements.
|
Recommends searching for explanations constructed with the smallest possible set of elements.
|
||||||
|
|
||||||
Attributed to William of Ockham, 14th-century English philosopher and theologian.
|
Attributed to William of Ockham, 14th-century English philosopher and theologian.
|
||||||
|
|
||||||
> _Entia non sunt multiplicanda praeter necessitatem_
|
> _Entia non sunt multiplicanda praeter necessitatem_
|
||||||
@@ -21,5 +22,5 @@ Attributed to William of Ockham, 14th-century English philosopher and theologian
|
|||||||
> "Of two competing theories, the simpler explanation is to be preferred."
|
> "Of two competing theories, the simpler explanation is to be preferred."
|
||||||
|
|
||||||
> [!quote] [[klugman-et-al_2019_loss-models#4.2 The Role of Parameters]]
|
> [!quote] [[klugman-et-al_2019_loss-models#4.2 The Role of Parameters]]
|
||||||
> The principle of parsimony states that the simplest model
|
> The principle of parsimony states
|
||||||
> that adequately reflects reality should be used.
|
> that the simplest model that adequately reflects reality should be used.
|
||||||
|
|||||||
@@ -7,11 +7,16 @@ daily: "[[2026-01-11]]"
|
|||||||
---
|
---
|
||||||
# 2026-01-11 11:00:??
|
# 2026-01-11 11:00:??
|
||||||
|
|
||||||
|
%%
|
||||||
|
Comment on a flawed understanding of [[construction-estimating]],
|
||||||
|
common even among estimators.
|
||||||
|
%%
|
||||||
|
|
||||||
![[my-favorite-quotes#"It Takes an Engineer to Build a Bridge that Barely Stands"]]
|
![[my-favorite-quotes#"It Takes an Engineer to Build a Bridge that Barely Stands"]]
|
||||||
|
|
||||||
The value that estimators provide for a contractor
|
The value that estimators provide for a contractor
|
||||||
is in modeling project cost.
|
is in _modeling project cost_.
|
||||||
If the goal were simply to present a number the cost will not exceed,
|
If the goal were simply to present a number that the cost will not exceed,
|
||||||
than anyone could be an estimator.
|
than anyone could be an estimator.
|
||||||
If the goal were only to present a reasonably accurate figure,
|
If the goal were only to present a reasonably accurate figure,
|
||||||
with no other constraints,
|
with no other constraints,
|
||||||
@@ -46,11 +51,13 @@ it is not cost-effective[^1] to allow it to take four.[^2]
|
|||||||
they may have reasonable basis to set sliding standards for estimate precision
|
they may have reasonable basis to set sliding standards for estimate precision
|
||||||
to be specifically determined at consideration of the opportunity for bid
|
to be specifically determined at consideration of the opportunity for bid
|
||||||
according to current climate (i.e. their transient risk appetite).
|
according to current climate (i.e. their transient risk appetite).
|
||||||
|
|
||||||
I believe my use of the absolute is still fair:
|
I believe my use of the absolute is still fair:
|
||||||
No contractor is doing that, so they lack a competent measure of risk tolerance
|
No contractor is doing that,
|
||||||
besides continuing to tolerate what they have historically.
|
so they lack a competent measure of risk tolerance
|
||||||
|
besides continuing to tolerate what they have tolerated historically.
|
||||||
|
|
||||||
> [!important]
|
> [!important]
|
||||||
> Objectionable as it is,
|
> Objectionable as it is,
|
||||||
> it is to be expected that estimators will use all time allowed them
|
> it is to be expected that estimators will use all time allowed them
|
||||||
> when the standards for _acceptability_ are inadequately defined.
|
> when the standards for **acceptability** are inadequately defined.
|
||||||
|
|||||||
@@ -10,7 +10,7 @@ daily: "[[2026-01-12]]"
|
|||||||
### CH3 Executed Contract Revision WBS
|
### CH3 Executed Contract Revision WBS
|
||||||
|
|
||||||
[[executed-contract-revisions]]
|
[[executed-contract-revisions]]
|
||||||
for CH3 South Nine and CH3 North Four (fka Crystal House III).
|
for "CH3 South Nine and CH3 North Four (fka Crystal House III)".
|
||||||
|
|
||||||
For Executed Contract Revisions, Bid GP% must be maintained.
|
For Executed Contract Revisions, Bid GP% must be maintained.
|
||||||
In this case a negative variance was added to the buyout budget
|
In this case a negative variance was added to the buyout budget
|
||||||
|
|||||||
@@ -8,10 +8,11 @@ daily: "[[2026-01-14]]"
|
|||||||
---
|
---
|
||||||
# 2026-01-14 13:27:20
|
# 2026-01-14 13:27:20
|
||||||
|
|
||||||
Follow-up to [[2026-01-13_11-28-14#Lighting Control]]
|
Follow-up to [[2026-01-13_11-28-14#Lighting Control]].
|
||||||
|
|
||||||
|
Conversation between [[joel-jansen]] and [[christian-pereiro]]
|
||||||
|
regarding [[lighting-controls]] for [[2100-crystal-drive]]:
|
||||||
|
|
||||||
> [!quote] Conversation between [[joel-jansen]] and [[christian-pereiro]] regarding lighting control for [[2100-crystal-drive]]:
|
|
||||||
>
|
|
||||||
> **Joel:** "It was sold as local."
|
> **Joel:** "It was sold as local."
|
||||||
>
|
>
|
||||||
> **Christian:** "Yeah, but you can't do that."
|
> **Christian:** "Yeah, but you can't do that."
|
||||||
|
|||||||
@@ -0,0 +1,14 @@
|
|||||||
|
---
|
||||||
|
id: 2026-01-20T16:30:00-0500
|
||||||
|
title: 2026-01-20 16:30:00
|
||||||
|
tags: []
|
||||||
|
daily: "[[2026-01-20]]"
|
||||||
|
---
|
||||||
|
# 2026-01-20 16:30:00
|
||||||
|
|
||||||
|
Quote previously located in [[feeders-takeoff]]
|
||||||
|
on the subject of pool bonding takeoff:
|
||||||
|
|
||||||
|
> [!quote] [[joel-jansen]] 2026-01-20T16:30 (pp.)
|
||||||
|
> [[josh-ford]] prefers it in electrical, but I'm not concerned.
|
||||||
|
> So long as it's named "Pool Bonding" it's fine.
|
||||||
@@ -10,6 +10,11 @@ daily: "[[2026-02-02]]"
|
|||||||
|
|
||||||
## Sleeving Takeoff Breakdown Direction
|
## Sleeving Takeoff Breakdown Direction
|
||||||
|
|
||||||
|
> [!quote] [[joel-jansen]] 2026-02-02 12:10, while reviewing Howard University East Towers (pp.)
|
||||||
|
> Match breakdowns of the relevant system,
|
||||||
|
> i.e. don't change breakdowns after taking off
|
||||||
|
> the assembly to be sleeved.
|
||||||
|
|
||||||
Updated [[sleeving-takeoff#Breakdowns]]
|
Updated [[sleeving-takeoff#Breakdowns]]
|
||||||
per clarification with [[joel-jansen]].
|
per clarification with [[joel-jansen]].
|
||||||
Previous direction below.
|
Previous direction below.
|
||||||
|
|||||||
@@ -0,0 +1,14 @@
|
|||||||
|
---
|
||||||
|
id: 2026-05-04T13:30:36-0400
|
||||||
|
title: 2026-05-04 13:30:36
|
||||||
|
tags: []
|
||||||
|
daily: "[[2026-05-04]]"
|
||||||
|
---
|
||||||
|
# 2026-05-04 13:30:36
|
||||||
|
|
||||||
|
> [!quote] [[joel-jansen]] 2026-05-04 13:30 (pp.)
|
||||||
|
> Use 0.5 labor hours for [[fixture-designations|fixtures]] in units.
|
||||||
|
>
|
||||||
|
> Using 1 hour doesn't make a functional difference
|
||||||
|
> because of the [[pdi-labor-plan|labor plan]] Labor Factor adjustment,
|
||||||
|
> but those adjustments may look very steep (~30%) with 1 hour each.
|
||||||
@@ -0,0 +1,22 @@
|
|||||||
|
---
|
||||||
|
id: 2026-05-04T14:57:49-0400
|
||||||
|
title: 2026-05-04 14:57:49
|
||||||
|
tags: []
|
||||||
|
daily: "[[2026-05-04]]"
|
||||||
|
---
|
||||||
|
# 2026-05-04 14:57:49
|
||||||
|
|
||||||
|
Direction from [[joel-jansen|Joel]]
|
||||||
|
|
||||||
|
## Telecom Homeruns
|
||||||
|
|
||||||
|
[[telecom-takeoff#Corridor Conduit (IDF to Unit MSDE)]]
|
||||||
|
|
||||||
|
It is acceptable to use a weighted average length
|
||||||
|
in a "Typical - All Units"
|
||||||
|
in lieu of individual takeoffs per floor.
|
||||||
|
|
||||||
|
## Unit Condensing Units
|
||||||
|
|
||||||
|
[[electrical-takeoff#Unit Condensing Units]]
|
||||||
|
|
||||||
+18
-18
@@ -76,18 +76,19 @@ Used in lieu of individual split systems.
|
|||||||
|
|
||||||
### Dedicated Circuit Receptacles
|
### Dedicated Circuit Receptacles
|
||||||
|
|
||||||
> [!quote] [[joel-jansen]] 2025-11-11, pp.
|
|
||||||
>
|
For N5-15R/N5-20R receptacles serving fixed equipment such as:
|
||||||
> For N5-15R/N5-20R receptacles serving fixed equipment such as:
|
|
||||||
>
|
* refrigerators
|
||||||
> * refrigerators
|
* gas ranges
|
||||||
> * gas ranges
|
* microwaves
|
||||||
> * microwaves
|
* clothes washers
|
||||||
> * clothes washers
|
* hood fans
|
||||||
> * hood fans
|
|
||||||
>
|
match the receptacle configuration shown on the plans
|
||||||
> match the receptacle configuration shown on the plans
|
(i.e. simplex to simplex, duplex to duplex).[^1]
|
||||||
> (i.e. simplex to simplex, duplex to duplex).
|
|
||||||
|
[^1]: [[2025-11-11_00-00-00]]
|
||||||
|
|
||||||
### Air Sealing
|
### Air Sealing
|
||||||
|
|
||||||
@@ -101,12 +102,11 @@ Used in lieu of individual split systems.
|
|||||||
|
|
||||||
### Dishwasher/Disposal Receptacles
|
### Dishwasher/Disposal Receptacles
|
||||||
|
|
||||||
> [!quote] [[joel-jansen]] 2026-01-12 in reference to [[woodbrook]] (pp.)[^1]
|
Even when drawings show 2 separate duplex receptacles,
|
||||||
> Even when drawings show 2 separate duplex receptacles,
|
use `DW & DISPOSAL DUAL CIR - ...`,
|
||||||
> use `DW & DISPOSAL DUAL CIR - ...`,
|
which includes only one receptacle.[^2]
|
||||||
> which includes only one receptacle.
|
|
||||||
|
|
||||||
[^1]: [[2026-01-12_10-42-30#Unit Dishwasher/Disposal]]
|
[^2]: [[2026-01-12_10-42-30#Unit Dishwasher/Disposal]]
|
||||||
|
|
||||||
### Disposal Switches
|
### Disposal Switches
|
||||||
|
|
||||||
@@ -177,7 +177,7 @@ For ADA units:
|
|||||||
|
|
||||||
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - FREE AIR`/`INDOOR HORN STROBE - FREE AIR`
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - FREE AIR`/`INDOOR HORN STROBE - FREE AIR`
|
||||||
|
|
||||||
#### Key
|
#### Hospitality
|
||||||
|
|
||||||
* `System` = "FA - Fire Alarm"
|
* `System` = "FA - Fire Alarm"
|
||||||
|
|
||||||
|
|||||||
+20
-10
@@ -75,17 +75,15 @@ Consult with the Senior Construction Estimator in this case.
|
|||||||
|
|
||||||
> [!important]
|
> [!important]
|
||||||
> Be careful of ambiguous terminology in specifications and PDI proposals:
|
> Be careful of ambiguous terminology in specifications and PDI proposals:
|
||||||
> "underground" and "below grade" are sometimes used inappropriately
|
> "underground" and "below grade" are sometimes used inappropriately to describe PVC in-slab.
|
||||||
> to describe PVC in-slab.
|
|
||||||
> It may be that rigid stub-ups are only necessary when emerging from grade (dirt),
|
> It may be that rigid stub-ups are only necessary when emerging from grade (dirt),
|
||||||
> but not when emerging from the slab.
|
> but not when emerging from the slab.
|
||||||
|
|
||||||
#### Garage Slab
|
#### Precast Slab
|
||||||
|
|
||||||
_Conventional Slab_: PVC in Slab
|
Typical of garage construction.
|
||||||
_Precast_: EMT
|
|
||||||
|
|
||||||
See [[pdi-breakdowns#Garage]] for more info.
|
PVC in-slab may not be utilized for precast slabs.
|
||||||
|
|
||||||
#### Slab Thickness
|
#### Slab Thickness
|
||||||
|
|
||||||
@@ -116,7 +114,10 @@ may be routed through with special permission.
|
|||||||
|
|
||||||
#### Post-Tensioned Slabs
|
#### Post-Tensioned Slabs
|
||||||
|
|
||||||
[[construction-methods#Post-Tensioned Slab|Post-Tensioned Slab]]
|
Raceway considerations for
|
||||||
|
[[construction-methods#Post-Tensioned Slab|post-tensioned slabs]],
|
||||||
|
(namely if PVC may be utilized, and if so, what sizes)
|
||||||
|
are contentious.
|
||||||
|
|
||||||
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
> [!cite] [[joel-jansen]] 2025-08-15, in reference to [[belle-meade-plaza|Belle Meade Plaza]] (pp.)
|
||||||
> No affect on takeoff. Routing in slab still possible.
|
> No affect on takeoff. Routing in slab still possible.
|
||||||
@@ -134,7 +135,9 @@ may be routed through with special permission.
|
|||||||
|
|
||||||
### MC Cable Overhead
|
### MC Cable Overhead
|
||||||
|
|
||||||
_Market Type = Assisted Living:_ MC-AP may be required.
|
_Market Type = Assisted Living:_
|
||||||
|
[MC AP cable](https://www.southwire.com/wire-cable/metal-clad-cable/c/c-mc-mcap)
|
||||||
|
may be required.
|
||||||
|
|
||||||
#### Concealment
|
#### Concealment
|
||||||
|
|
||||||
@@ -145,10 +148,15 @@ may only be used where they will be concealed from view.
|
|||||||
> Temporary provisions for unfinished spaces
|
> Temporary provisions for unfinished spaces
|
||||||
> (e.g. core and shell [[pdi-building-types#Retail|retail]])
|
> (e.g. core and shell [[pdi-building-types#Retail|retail]])
|
||||||
|
|
||||||
|
> [!info]
|
||||||
|
> This is not a code requirement,
|
||||||
|
> though it is frequently stated to be.
|
||||||
|
> It is, however, near universal specification.
|
||||||
|
|
||||||
#### Multi-Circuit Homeruns
|
#### Multi-Circuit Homeruns
|
||||||
|
|
||||||
Different schools of thought exist
|
Different schools of thought exist
|
||||||
on whether to use multi-neutral MC or EMT for homeruns.
|
on whether to use multi-neutral MC or pipe and wire for homeruns.
|
||||||
Which is more cost-effective
|
Which is more cost-effective
|
||||||
is apparently subject to transient market conditions.
|
is apparently subject to transient market conditions.
|
||||||
Seek clarification from your senior on a job by job basis.
|
Seek clarification from your senior on a job by job basis.
|
||||||
@@ -189,6 +197,8 @@ Use compression fittings.
|
|||||||
|
|
||||||
Not usually permissible, except in Florida.
|
Not usually permissible, except in Florida.
|
||||||
|
|
||||||
|
Where acceptable usually utilized in lieu of EMT.
|
||||||
|
|
||||||
## By Specification
|
## By Specification
|
||||||
|
|
||||||
> [!info] Example Specs Relevant to Wiring Methods Selection
|
> [!info] Example Specs Relevant to Wiring Methods Selection
|
||||||
@@ -218,7 +228,7 @@ flowchart
|
|||||||
|
|
||||||
#### Fire Rated Feeders
|
#### Fire Rated Feeders
|
||||||
|
|
||||||
[[fire-resistive-wiring-methods-takeoff]]
|
Where required see [[fire-resistive-wiring-methods-takeoff]].
|
||||||
|
|
||||||
PDI estimating practice is to run all "emergency" feeds
|
PDI estimating practice is to run all "emergency" feeds
|
||||||
(life-safety or just standby)
|
(life-safety or just standby)
|
||||||
|
|||||||
Reference in New Issue
Block a user