vault backup: 2025-11-10 16:55:49
This commit is contained in:
@@ -0,0 +1,23 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- authorship/original
|
||||
- destiny/permanent
|
||||
- occupational/takeoff/electrical
|
||||
- status/draft
|
||||
- type/guide
|
||||
title: Fire Resistive Wiring Methods Takeoff
|
||||
---
|
||||
# Fire Resistive Wiring Methods Takeoff
|
||||
|
||||
> [!important]
|
||||
> This note is intended to be accurate first to PDI takeoff procedure
|
||||
> see [[fire-resistive-wiring-methods]] for accuracy to reality.
|
||||
|
||||
For circuits requiring fire protection,
|
||||
it may be acceptable to assume a rated chase,
|
||||
or concrete-encasement can fulfill this requirement.
|
||||
|
||||
If "Lifeline" (cable-in-conduit) cable is used,
|
||||
utilize EMT-Comp assemblies.
|
||||
Reference in New Issue
Block a user