id: 2025-07-18_estimating-isnt-engineering
|
||||
aliases: []
|
||||
tags: []
|
||||
---
|
||||
# Estimating Isn't Engineering
|
||||
|
||||
A peer recently expressed frustration to me
|
||||
about the declining quality of construction drawings,
|
||||
specifically how scope is often ~~required but not detailed~~.
|
||||
|
||||
%%
|
||||
TODO: discussion based on the difference between engineering,
|
||||
(which requires knowledge of subject matter)
|
||||
and estimation
|
||||
(which requires knowledge of ~~impact~~).
|
||||
%%
|
||||
|
||||
It's not engineering to budget for the most likely case.
|
||||
|
||||
Estimators need not know _why_ there tends to be ~~example~~,
|
||||
they need need only have basis for applying that generalization to another project.
|
||||
@@ -4,7 +4,10 @@ Standardize formatting and input methods for common
|
||||
(mostly multi-family specific)
|
||||
project info, including:
|
||||
|
||||
* level names
|
||||
* levels by elevation
|
||||
* unit types
|
||||
* info
|
||||
* by level
|
||||
* area types by level
|
||||
* switchgear by level
|
||||
* feeders
|
||||
@@ -13,5 +16,9 @@ project info, including:
|
||||
|
||||
To calculate regular quantities
|
||||
|
||||
* sleeving
|
||||
* conductor support
|
||||
* by feeder routing
|
||||
* sleeving
|
||||
* conductor support
|
||||
* by area
|
||||
* temp power
|
||||
|
||||
|
||||
@@ -0,0 +1,62 @@
|
||||
# Final SOE
|
||||
|
||||
## 1. Trash Chute
|
||||
|
||||
- Check elevations for floor height
|
||||
- Uncheck Link 'Enable Livecount'
|
||||
- CA.33(Misc. Ass.). 2
|
||||
- 100' Horizontal (If not shown)
|
||||
- Vertical Put in Typical
|
||||
|
||||
- Check Bottom of chute if taken off already in elec. THIS IS ONLY FOR THE HORIZONTAL
|
||||
|
||||
## 2. CU/IP
|
||||
|
||||
- Units Condensing Unit
|
||||
- Mechanical Connection
|
||||
|
||||
## 3. Slab Deck
|
||||
|
||||
- Create Area Typical for every Concrete slab floor
|
||||
- ID.37.16.1
|
||||
- ID. MISC PDI PRODUCT. MISC MATERIAL. SLAB/DECK
|
||||
- 2 Typicals
|
||||
|
||||
- 'All Building'
|
||||
|
||||
- 1 every level (Not Roof)
|
||||
|
||||
- HD 1 Per Section
|
||||
|
||||
- 'All Garage'
|
||||
|
||||
- 1 every level
|
||||
|
||||
## 4. Temporary Power & Lighting
|
||||
|
||||
```
|
||||
Area = ""
|
||||
```
|
||||
|
||||
- ID.27.
|
||||
- 3/4/5 (A-bid>>)
|
||||
- 8/9
|
||||
- Total GSF - Garage GSF = Building Size
|
||||
- Garage SF = Temp lighting Garage
|
||||
- Enter in count
|
||||
|
||||
Gardens: Take off 1 Tpole `ID.28.1` per 150' per building
|
||||
|
||||
TEMP LIGHTING ^^^^
|
||||
|
||||
## 5. Irrigation pumps
|
||||
|
||||
- SYSTEM: `MISC - Site Miscellaneous`
|
||||
|
||||
- (3) 3Phase 30A 200' Mech. Con.
|
||||
- Append to name: "Irrigation Pump - "
|
||||
|
||||
## 6. Lightning Protection
|
||||
|
||||
- Check line Item on Proposal
|
||||
- Go to the notes and take off
|
||||
@@ -0,0 +1,11 @@
|
||||
# PDI Takeoff Scratch
|
||||
|
||||
Notes taken in review with Joel.
|
||||
|
||||
%% TODO: Split to more appropriate notes and delete this one. %%
|
||||
|
||||
* Use 15ft adders for site runs
|
||||
(primaries, secondaries, etc.),
|
||||
as opposed to standard 10ft adder,
|
||||
to account for variability.
|
||||
|
||||
@@ -64,6 +64,15 @@ He later refers to the tendency to overvalue competence
|
||||
in the role of achieving improbable accomplishments
|
||||
as the "Red Baron effect".
|
||||
|
||||
### There's Always Enough Data
|
||||
|
||||
Hubbard challenges the popular rebuttal
|
||||
that X industry lacks the data to use quantitative models.
|
||||
|
||||
> [!quote] Fallacy of Close Analogy - p.236
|
||||
> ...the belief that unless two things are identical in every way,
|
||||
> nothing learned from one can be applied to the other.
|
||||
|
||||
## Mentioned Topics and Abbreviations
|
||||
|
||||
* Analytic Hierarchy Process (AHP)
|
||||
|
||||