vault backup: 2026-04-27 17:01:41

This commit is contained in:
2026-04-27 17:01:42 -04:00
parent faafade453
commit e0dfe9bd6e
22 changed files with 244 additions and 30 deletions
+7 -3
View File
@@ -15,6 +15,7 @@ daily: "[[2026-04-23]]"
Note extensive emergency power provisions
verify control wiring for generator to ATS
#### Lighting HR's
count of circuits, control zones in takeoff notes
@@ -36,6 +37,7 @@ extended light layouts
ASL Column 2 with adjustments
Site Labor +50%
#### Telecom Backbone
#### Medium Voltage
@@ -45,6 +47,7 @@ Medium voltage cabling downstream of
#### Underground Runs
need rigid 90's for PVC runs 200ft and above
> horizontal? vertical? both?
#### Fixture Labor
@@ -53,13 +56,14 @@ Tape light: 1 hour per 6 feet
snap together linear: 1 hour per 5 feet
##### Center Bar Fixture
##### Center Bar Fixture
assuming each crystal is an individual fixture
over 5000 crystals
80 circuits
A-GAM-442
Arch set A-GAM-442
##### Dragon Fixture
1000 hours
@@ -75,6 +79,7 @@ or "Standalone" with Network Bridges.
#### DAS
Sold Design Build
#### Historicals
Want to know
@@ -97,4 +102,3 @@ Extra cost for facade lighting install
250,000
"Go to 150k"