vault backup: 2026-04-29 17:41:16
This commit is contained in:
+26
-10
@@ -11,6 +11,27 @@ up: "[[conest-projects]]"
|
||||
6 buildings + clubhouse
|
||||
3 building types
|
||||
|
||||
## TODO
|
||||
|
||||
* [x] [[feeders-takeoff]]
|
||||
* [x] [[subfeeds-takeoff]]
|
||||
* [ ] [[switchgear-takeoff]]
|
||||
* [x] [[units-takeoff]]
|
||||
* [/] [[fixtures-takeoff]]
|
||||
* [/] [[lighting-controls-takeoff]]
|
||||
* [/] [[electrical-takeoff]]
|
||||
* [ ] Trash chute power
|
||||
* [ ] Unit CU's
|
||||
* [ ] [[telecom-takeoff]]
|
||||
* [ ] Homeruns
|
||||
* [ ] [[low-voltage-takeoff]]
|
||||
* [ ] [[fire-alarm-takeoff]]
|
||||
* [ ] [[two-way-takeoff]]
|
||||
* [ ] [[distributed-antenna-systems-takeoff]]
|
||||
* [ ] [[lightning-protection-takeoff]]
|
||||
* [ ] [[misc-budgets-takeoff]]
|
||||
* [ ] [[temp-power-takeoff]]
|
||||
|
||||
## ConEst Questions
|
||||
|
||||
Questions for [[conest|ConEst]]:
|
||||
@@ -32,10 +53,7 @@ THE CONTRACTOR IS RESPONSIBLE TO BE FAMILIAR WITH THE 2020 FBC ENERGY CONSERVATI
|
||||
AND SHALL UPSIZE THE CONDUCTORS FOR FEEDER AND BRANCH CIRCUITS
|
||||
BASED ON THE ACTUAL ROUTING IN THE FIELD.
|
||||
|
||||
**C405.10 Voltage drop.**
|
||||
The total voltage drop across the combination of customer-owned service conductors,
|
||||
feeder conductors and branch circuit conductors
|
||||
shall not exceed 5 percent.
|
||||
![[iecc_c405#C405.10 Voltage drop.]]
|
||||
|
||||
### Floor Boxes
|
||||
|
||||
@@ -71,7 +89,7 @@ shall not exceed 5 percent.
|
||||
> BY BOTH THE N.E.C. AND LOCAL ORDINANCE,
|
||||
> IN THE FOLLOWING APPLICATIONS:
|
||||
> * A. IN WALLS FOR HORIZONTAL DEVICE CONNECTION ONLY.
|
||||
> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE).
|
||||
> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE).
|
||||
|
||||
#### Rigid Elbows
|
||||
|
||||
@@ -85,8 +103,6 @@ but neither proposal mentions them.
|
||||
|
||||
#### Fire Alarm Wiring Methods
|
||||
|
||||
|
||||
|
||||
### Differences in Scope Between Customers
|
||||
|
||||
2 Customers
|
||||
@@ -101,8 +117,8 @@ DAS Conduit in separate bid item
|
||||
BPM
|
||||
2026-03-23 Nicole Bisbee:
|
||||
Per correspondence from KAST
|
||||
“Please note that KAST has **not** been awarded this project.
|
||||
It appears the project will be undertaken by Hedrick Brothers.”
|
||||
"Please note that KAST has **not** been awarded this project.
|
||||
It appears the project will be undertaken by Hedrick Brothers."
|
||||
|
||||
Most recent proposal to KAST is 2026-02-26.
|
||||
Assuming this one can be ignored.
|
||||
@@ -122,4 +138,4 @@ Assuming this one can be ignored.
|
||||
|
||||
## Problems to Solve
|
||||
|
||||
ADA units likely exist, but are not shown on floor plans.
|
||||
ADA units likely exist, but are not shown on floor plans.
|
||||
|
||||
Reference in New Issue
Block a user