vault backup: 2026-04-28 16:30:30
This commit is contained in:
@@ -39,7 +39,7 @@ Started ~13:45
|
||||
|
||||
6. Create TrimbleConnect project
|
||||
|
||||
7. Create Accubid Job
|
||||
7. Create [[accubid|Accubid]] Job
|
||||
* Paste Areas
|
||||
|
||||
8. Unit Matrix
|
||||
|
||||
@@ -1,7 +1,6 @@
|
||||
---
|
||||
title: "13723 Feather Sound Circle East #210"
|
||||
tags:
|
||||
- occupational
|
||||
tags: []
|
||||
---
|
||||
# 13723 Feather Sound Circle East #210
|
||||
|
||||
|
||||
@@ -17,10 +17,10 @@ tags:
|
||||
|
||||
## Syntax
|
||||
|
||||
I primarily use [[obsidian|Obsidian]] for both reading and writing,
|
||||
[[me|I]] primarily use [[obsidian|Obsidian]] for both reading and writing,
|
||||
so notes are written in [Obsidian-flavored markdown](https://help.obsidian.md/),
|
||||
which is partially reimplemented by
|
||||
[Foam](https://foamnotes.com/) for Visual Studio Code
|
||||
which is partially reimplemented
|
||||
by [Foam](https://foamnotes.com/) for Visual Studio Code
|
||||
and [Markdown Oxide](https://oxide.md/) for vim, neovim, and others.
|
||||
|
||||
For compatibility,
|
||||
|
||||
+2
-1
@@ -4,6 +4,7 @@ tags:
|
||||
- occupational
|
||||
- type/guide
|
||||
title: Accubid Setup
|
||||
up: "[[pdi-estimating]]"
|
||||
---
|
||||
# Accubid Setup
|
||||
|
||||
@@ -11,7 +12,7 @@ title: Accubid Setup
|
||||
|
||||
### Automation
|
||||
|
||||
It is likely infeasible to automate LiveCount and Accubid project creation.
|
||||
It is likely infeasible to automate LiveCount and [[accubid|Accubid]] project creation.
|
||||
However, a script could launch the apps with a procedure,
|
||||
setting the clipboard.
|
||||
|
||||
|
||||
+1
-1
@@ -8,7 +8,7 @@ tags:
|
||||
---
|
||||
# AI in Estimating
|
||||
|
||||
Most estimators are already pigeon-holed into poor SaaS like Accubid and the rest already,
|
||||
Most estimators are already pigeon-holed into poor SaaS like [[accubid|Accubid]] and the rest already,
|
||||
but the need to increase efficiency with AI will be the nail in the coffin.
|
||||
The myth that "full package" estimating software is most efficient
|
||||
will only be exacerbated by the inclusion of AI features
|
||||
|
||||
@@ -5,6 +5,7 @@ tags:
|
||||
- topic/automation
|
||||
- type/idea
|
||||
title: BPM Award Analysis
|
||||
up: "[[pdi-estimating]]"
|
||||
---
|
||||
# BPM Award Analysis
|
||||
|
||||
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
title: Christian Pereiro
|
||||
tags:
|
||||
- occupational
|
||||
- type/person
|
||||
up: "[[pdi-bid-estimating]]"
|
||||
---
|
||||
# Christian Pereiro
|
||||
|
||||
preconstruction manager (chief estimator) for [[pdi-bid-estimating]]
|
||||
@@ -4,6 +4,7 @@ tags:
|
||||
- authorship/other
|
||||
- occupational
|
||||
- type/media
|
||||
up: "[[pdi-pre-takeoff-confirmation]]"
|
||||
---
|
||||
# ConEst Pre-Takeoff Email Template
|
||||
|
||||
|
||||
+1
-1
@@ -5,4 +5,4 @@ tags:
|
||||
---
|
||||
# ConEst Projects
|
||||
|
||||
Link target for [[conest]] projects.
|
||||
Link target for [[conest|ConEst]] projects.
|
||||
|
||||
@@ -1,9 +1,12 @@
|
||||
---
|
||||
aliases:
|
||||
- ConEst
|
||||
title: PDI Construction Estimating (ConEst)
|
||||
tags:
|
||||
- occupational
|
||||
- topic/estimating
|
||||
- type/encyclopedia-entry
|
||||
up: "[[power-design-inc]]"
|
||||
---
|
||||
# PDI Construction Estimating (ConEst)
|
||||
|
||||
|
||||
@@ -4,5 +4,6 @@ tags:
|
||||
- occupational
|
||||
- status/not-started
|
||||
- type/person
|
||||
up: "[[pdi-estimating]]"
|
||||
---
|
||||
# Corwin Fluit
|
||||
|
||||
@@ -65,7 +65,7 @@ Weatherhead for antenna. One per building.
|
||||
|
||||
> [!important]
|
||||
> Usually only for cellular DAS.
|
||||
> Confirm takeoff requirement with [[pdi-estimating#Bid Estimating|Bid]].
|
||||
> Confirm takeoff requirement with [[pdi-bid-estimating|Bid]].
|
||||
|
||||
1. .../`CORRIDORS ...`
|
||||
* **Length** = Length measured for every corridor/garage
|
||||
|
||||
+1
-1
@@ -45,7 +45,7 @@ Once received, validation no longer required
|
||||
* Compare/cross reference architectural and electrical plans
|
||||
to determine correct unit naming, count, location, and layout
|
||||
* Create unit matrix excel document
|
||||
* Enter information into Accubid and cBOM accurately
|
||||
* Enter information into [[accubid|Accubid]] and cBOM accurately
|
||||
|
||||
### Grading Scale
|
||||
|
||||
|
||||
@@ -228,7 +228,7 @@ Length and Labor will be more than a normal fixture in BOH/Amenity
|
||||
|
||||
## Porte Cochere (Drive up Area)
|
||||
|
||||
Create its own breakout in WBS, and phase in Accubid
|
||||
Create its own breakout in WBS, and phase in [[accubid|Accubid]]
|
||||
|
||||
> [!quote]
|
||||
> This is not technically exposed or drop ceiling, but still use PVC
|
||||
|
||||
+2
-2
@@ -46,8 +46,8 @@ tags:
|
||||
|
||||
### See Also
|
||||
|
||||
3. [[carbon-monoxide-detection-takeoff]]
|
||||
4. [[lightning-protection-takeoff]]
|
||||
* [[lightning-protection-takeoff]]
|
||||
* [[carbon-monoxide-detection-takeoff]]
|
||||
|
||||
[[general-takeoff]]
|
||||
|
||||
|
||||
@@ -13,6 +13,8 @@ up: "[[conest-projects]]"
|
||||
|
||||
## ConEst Questions
|
||||
|
||||
Questions for [[conest|ConEst]]:
|
||||
|
||||
### Area Breakdowns
|
||||
|
||||
Since residential building types have corridors
|
||||
@@ -20,6 +22,8 @@ it will be necessary to create Areas for each level.
|
||||
|
||||
## Bid Questions
|
||||
|
||||
Questions for [[pdi-bid-estimating|Bid]]:
|
||||
|
||||
### Voltage Drop
|
||||
|
||||
VOLTAGE DROP CALCULATIONS ON ALL FEEDERS AND BRANCH CIRCUITS
|
||||
|
||||
@@ -3,5 +3,6 @@ title: Joel Jansen
|
||||
tags:
|
||||
- occupational
|
||||
- type/person
|
||||
up: "[[conest]]"
|
||||
---
|
||||
# Joel Jansen
|
||||
|
||||
@@ -4,5 +4,6 @@ tags:
|
||||
- occupational
|
||||
- status/not-started
|
||||
- type/person
|
||||
up: "[[conest]]"
|
||||
---
|
||||
# Josh Ford
|
||||
|
||||
@@ -9,8 +9,8 @@ tags:
|
||||
Assembly selection for lighting controls is _never_ straightforward,
|
||||
even where it ought to be.
|
||||
There _must_ be conversation and consensus
|
||||
between the [[conest]]
|
||||
and [[pdi-estimating#Bid Estimating|Bid]] senior estimators
|
||||
between the [[conest|ConEst]]
|
||||
and [[pdi-bid-estimating|Bid]] senior estimators
|
||||
before takeoff can begin.
|
||||
This note is intended to assist in collecting all information
|
||||
likely to be relevant to said discussion,
|
||||
|
||||
@@ -17,7 +17,7 @@ up: "[[takeoff-scripts]]"
|
||||
> no consideration for _any_ lighting control beyond standard devices,
|
||||
> (with `$D`'s being the [[lighting-controls#Triac Dimming|triac]] type)
|
||||
> however, this phrasing is ambiguous and non-universal.
|
||||
> Confirm with [[pdi-estimating#Bid Estimating|bid team]] on what must be included.
|
||||
> Confirm with [[pdi-bid-estimating|bid team]] on what must be included.
|
||||
|
||||
Determine which Systems and Codes are required:
|
||||
* _IBC/IECC 2021 or later:_ all fixtures 0-10V dimmable.
|
||||
|
||||
@@ -26,7 +26,7 @@ search for direction on downlead counts, total length, and conduit size
|
||||
|
||||
> [!tip]
|
||||
> While you have the quotes open,
|
||||
> put the costs in the Subcontractors tab in Accubid.
|
||||
> put the costs in the Subcontractors tab in [[accubid|Accubid]].
|
||||
|
||||
If no quote is available:
|
||||
|
||||
|
||||
@@ -4,6 +4,7 @@ tags:
|
||||
- occupational
|
||||
- status/not-started
|
||||
- type/person
|
||||
up: "[[pdi-estimating]]"
|
||||
---
|
||||
# Megan Blizard
|
||||
|
||||
|
||||
+1
-1
@@ -15,7 +15,7 @@ of [[this-notebook]].
|
||||
|
||||
%%
|
||||
|
||||
[[conest]]
|
||||
[[conest|ConEst]]
|
||||
|
||||
## Goals
|
||||
|
||||
|
||||
@@ -229,5 +229,5 @@ delivers high-quality results and takes initiative.
|
||||
> Zane has been a great addition to our team in these short few months.
|
||||
> He's shown genuine enthusiasm while learning,
|
||||
> asks the right questions, and has picked up our PDI standards quickly.
|
||||
> His experience with Accubid has proven extremely valuable,
|
||||
> His experience with [[accubid|Accubid]] has proven extremely valuable,
|
||||
> and he's shared some helpful Excel shortcuts with the team.
|
||||
|
||||
@@ -7,6 +7,8 @@ tags:
|
||||
---
|
||||
# PDI Accubid Closeout
|
||||
|
||||
[[accubid|Accubid]]
|
||||
|
||||
Also called "tabs".
|
||||
|
||||
1. [[pdi-labor-plan]]
|
||||
@@ -66,4 +68,4 @@ TODO
|
||||
> * "MATERIAL HANDLER - PER MO"
|
||||
|
||||
Only if included in Base Bid.
|
||||
Confirm with [[pdi-estimating#Bid Estimating|Bid]] estimator.
|
||||
Confirm with [[pdi-bid-estimating|Bid]] estimator.
|
||||
|
||||
@@ -3,6 +3,7 @@ title: PDI Accubid Equipment
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: Equipment
|
||||
|
||||
|
||||
@@ -3,6 +3,7 @@ title: "PDI Accubid Closeout: Final Price"
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: Final Price
|
||||
|
||||
|
||||
@@ -3,6 +3,7 @@ title: "PDI Accubid Closeout: General Expenses"
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: General Expenses
|
||||
|
||||
|
||||
@@ -3,6 +3,7 @@ title: "PDI Accubid Closeout: Indirect Labor"
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: Indirect Labor
|
||||
|
||||
|
||||
@@ -3,6 +3,7 @@ title: "PDI Accubid Closeout: Quoted Material"
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: Quoted Material
|
||||
|
||||
|
||||
@@ -3,6 +3,7 @@ title: "PDI Accubid Closeout: Subcontractors"
|
||||
tags:
|
||||
- occupational/closeout
|
||||
- type/guide
|
||||
up: "[[pdi-accubid-closeout]]"
|
||||
---
|
||||
# PDI Accubid Closeout: Subcontractors
|
||||
|
||||
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
aliases:
|
||||
- Bid
|
||||
title: PDI Bid Estimating
|
||||
tags:
|
||||
- occupational
|
||||
- type/department
|
||||
up: "[[power-design-inc]]"
|
||||
---
|
||||
# PDI Bid Estimating
|
||||
@@ -6,6 +6,8 @@ title: PDI Breakdowns
|
||||
---
|
||||
# PDI Breakdowns
|
||||
|
||||
[[accubid|Accubid]]
|
||||
|
||||
## Location
|
||||
|
||||
### Bid Item: Site
|
||||
|
||||
@@ -1,8 +1,9 @@
|
||||
---
|
||||
title: PDI Estimating Systems
|
||||
tags:
|
||||
- occupational/takeoff
|
||||
- type/encyclopedia
|
||||
title: PDI Estimating Systems
|
||||
up: "[[pdi-estimating]]"
|
||||
---
|
||||
# PDI Estimating Systems
|
||||
|
||||
|
||||
+4
-1
@@ -3,6 +3,7 @@ tags:
|
||||
- occupational
|
||||
- type/encyclopedia
|
||||
title: PDI Estimating
|
||||
up: "[[power-design-inc]]"
|
||||
---
|
||||
# PDI Estimating
|
||||
|
||||
@@ -14,6 +15,8 @@ title: PDI Estimating
|
||||
|
||||
### Bid Estimating
|
||||
|
||||
Main article: [[pdi-bid-estimating]]
|
||||
|
||||
### Construction Estimating (ConEst)
|
||||
|
||||
Main article: [[conest]]
|
||||
Main article: [[conest|ConEst]]
|
||||
|
||||
@@ -37,7 +37,7 @@ for multifamily, commercial, and federal projects.
|
||||
|
||||
* Excellent communicator who is organized, detail-oriented, and efficient.
|
||||
|
||||
* Proficiency in Microsoft Office and estimating software (Accubid preferred).
|
||||
* Proficiency in Microsoft Office and estimating software ([[accubid|Accubid]] preferred).
|
||||
|
||||
* Demonstrate and uphold all of Power Design's core values,
|
||||
which include integrity, accountability, teamwork, innovation, and growth.
|
||||
|
||||
+1
-1
@@ -24,7 +24,7 @@ title: PDI Labor Plan
|
||||
* Change breakdown of everything in each phase to the proper `Labor Factor`
|
||||
* Do not move Temp Power (budgets) or site
|
||||
|
||||
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
|
||||
5. Use the [[accubid|Accubid]] Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
|
||||
|
||||
6. Select extension view "Phase, Sort Code"
|
||||
|
||||
|
||||
+2
-1
@@ -1,9 +1,10 @@
|
||||
---
|
||||
aliases:
|
||||
- ops
|
||||
- Ops
|
||||
title: PDI Operations
|
||||
tags:
|
||||
- occupational
|
||||
up: "[[power-design-inc]]"
|
||||
---
|
||||
# PDI Operations
|
||||
|
||||
|
||||
@@ -1,16 +1,18 @@
|
||||
---
|
||||
aliases:
|
||||
- Pre-Takeoff Confirmation
|
||||
title: Pre-Takeoff Confirmation
|
||||
tags:
|
||||
- occupational/takeoff
|
||||
- status/draft
|
||||
- type/guide
|
||||
- occupational/takeoff
|
||||
title: Pre-Takeoff Confirmation
|
||||
---
|
||||
# Pre-Takeoff Confirmation
|
||||
|
||||
The purpose of the pre-takeoff confirmation
|
||||
is to address potential discrepancies
|
||||
between the requirements of the project documents
|
||||
and the scope included in the bid team's proposed price.
|
||||
and the scope included in the [[pdi-bid-estimating|Bid]] team's proposed price.
|
||||
|
||||
## Procedure
|
||||
|
||||
@@ -28,14 +30,14 @@ Paste the completed template content to the body of a new email.
|
||||
|
||||
**To:**
|
||||
* Preconstruction Manager %% Brian %%
|
||||
* Senior Bid Estimator %% Christian %%
|
||||
* Senior Bid Estimator %% [[christian-pereiro]] %%
|
||||
* Bid Estimator or Associate Estimator (if applicable)
|
||||
|
||||
**CC:**
|
||||
* Senior Construction Estimator %% [[joel-jansen]] %%
|
||||
* ConEst Manager ([[josh-ford]])
|
||||
* Director of Estimating ([[corwin-fluit]])
|
||||
* ConEst Manager ([[josh-ford|Josh Ford]])
|
||||
* Director of Estimating ([[corwin-fluit|Corwin Fluit]])
|
||||
* Jessalyn Williams
|
||||
* Other ConEst Estimators (if applicable)
|
||||
* Other ConEst Estimators involved (if applicable)
|
||||
|
||||
[^1]: [[2026-03-20_09-11-09#Pre-Takeoff Email Process]]
|
||||
|
||||
@@ -1,4 +1,6 @@
|
||||
---
|
||||
aliases:
|
||||
- PSN
|
||||
title: Project Start Notification
|
||||
tags:
|
||||
- authorship/other-for-now
|
||||
@@ -29,7 +31,7 @@ Export Awarded WBS to PDF, or just copy if available.
|
||||
|
||||
## Procurement Accubid Export
|
||||
|
||||
In master Accubid file,
|
||||
In master [[accubid|Accubid]] file,
|
||||
group by `System`, `PDI SORT CODES`.
|
||||
|
||||
Export ==**Extension** only== as ==**Excel**==
|
||||
|
||||
+5
-2
@@ -1,5 +1,7 @@
|
||||
---
|
||||
title: Project Start Notification
|
||||
aliases:
|
||||
- WBS
|
||||
title: PDI WBS
|
||||
tags:
|
||||
- authorship/other-for-now
|
||||
- occupational
|
||||
@@ -9,7 +11,8 @@ tags:
|
||||
|
||||
## CBOM Accubid Export
|
||||
|
||||
In master Accubid file, group by `Bid Item`, `System`, `PDI SORT CODES`, `Area`, `Phase`.
|
||||
In master [[accubid|Accubid]] file,
|
||||
group by `Bid Item`, `System`, `PDI SORT CODES`, `Area`, `Phase`.
|
||||
|
||||
Export ==**all tabs**== as ==**csv**== to ".\6. Notes & Emails\Accubid CBOM - {Job}"
|
||||
|
||||
|
||||
@@ -0,0 +1,10 @@
|
||||
---
|
||||
id: 2026-04-28
|
||||
title: 2026-04-28
|
||||
tags: []
|
||||
weekly: "[[2026w18]]"
|
||||
monthly: "[[2026-04]]"
|
||||
quarterly: "[[2026q2]]"
|
||||
previous: "[[2026-04-27]]"
|
||||
---
|
||||
# 2026-04-28
|
||||
@@ -0,0 +1,8 @@
|
||||
---
|
||||
aliases:
|
||||
- PDI
|
||||
title: Power Design, Inc.
|
||||
tags:
|
||||
- occupational
|
||||
---
|
||||
# Power Design, Inc.
|
||||
@@ -17,7 +17,7 @@ This note should be arranged chronologically:
|
||||
* Project Manual (Specifications)
|
||||
* GC Narrative
|
||||
* GC verbal direction
|
||||
* Bid proposal
|
||||
* [[pdi-bid-estimating|Bid]] proposal
|
||||
* Bid verbal direction
|
||||
|
||||
%%
|
||||
|
||||
@@ -20,7 +20,8 @@ when in practice there's no meaningful difference in practice from manual.
|
||||
|
||||
* Manual estimation is best done in terms of [[assembly-philosophy#Assemblies|assemblies]] anyway.
|
||||
* On-screen takeoff only eliminates a single manual process.
|
||||
* Any estimator trained on Accubid could do the same by hand, the methodology is quite transparent.
|
||||
* Any estimator trained on [[accubid|Accubid]] could do the same by hand,
|
||||
the methodology is quite transparent.
|
||||
* At what point in Excel automation does manual estimation become software based?
|
||||
|
||||
There is no place for truly manual estimation (pencil and paper)
|
||||
|
||||
@@ -96,12 +96,6 @@ as well as other industries.
|
||||
This topic also includes concepts that may be useful to estimation,
|
||||
but that aren't widely understood to be.
|
||||
|
||||
### #topic/math
|
||||
|
||||
### #topic/risk
|
||||
|
||||
Relating to mathematical and abstract concepts of [[risk]].
|
||||
|
||||
### #topic/ergonomics/organizational
|
||||
|
||||
On the subject of [[optimal-patterns]] for processes
|
||||
|
||||
@@ -9,4 +9,4 @@ daily: "[[2025-08-22]]"
|
||||
|
||||
## Getting Historical Material Pricing
|
||||
|
||||
Aggregate SupplierLink.xml files from Accubid job folders.
|
||||
Aggregate SupplierLink.xml files from [[accubid|Accubid]] job folders.
|
||||
|
||||
@@ -9,7 +9,7 @@ daily: "[[2025-11-13]]"
|
||||
|
||||
## Questions for Bid Estimators
|
||||
|
||||
Questions for [[pdi-estimating#Bid Estimating|PDI Bid Estimators]].
|
||||
Questions for [[pdi-bid-estimating|PDI Bid Estimators]].
|
||||
|
||||
### Exclusions
|
||||
|
||||
|
||||
@@ -26,7 +26,8 @@ A primary reason for the discussion was presented:
|
||||
|
||||
> [!example] ^ex
|
||||
> While putting together a large garden style project
|
||||
> Bid received a quote for lighting control at over one million dollars.
|
||||
> [[pdi-bid-estimating|Bid]] received a quote for lighting control
|
||||
> at over one million dollars.
|
||||
> Believing it [[gold-plating|overengineered]],
|
||||
> Bid proposed ~$150,000 for lighting control "per code".
|
||||
> The contract was awarded on those terms.
|
||||
|
||||
@@ -6,7 +6,7 @@ daily: "[[2025-12-18]]"
|
||||
---
|
||||
# 2025-12-18 15:22:??
|
||||
|
||||
PDI has moved up the schedule to transition to Accubid Anywhere
|
||||
PDI has moved up the schedule to transition to [[accubid|Accubid]] Anywhere
|
||||
and will be signing a contract with Trimble in late January.
|
||||
|
||||
[Drawer AI | Automated Electrical Takeoff & Estimating](https://drawer.ai/)
|
||||
|
||||
@@ -9,12 +9,12 @@ daily: "[[2026-01-07]]"
|
||||
---
|
||||
# 2026-01-07 12:13:??
|
||||
|
||||
Just now Jorge admonished another peer
|
||||
Just now [[jorge-padron|Jorge]] admonished another peer
|
||||
for using insulated wire for pool bonding,
|
||||
his rationale was flawed beyond saving
|
||||
(something about the difference between bonding and grounding),
|
||||
but stemmed from a frustratingly common misunderstanding
|
||||
that our Accubid assemblies are intended to be an accurate list
|
||||
that our [[accubid|Accubid]] assemblies are intended to be an accurate list
|
||||
of the material to be installed.
|
||||
|
||||
They are not.
|
||||
|
||||
@@ -9,8 +9,8 @@ daily: "[[2026-01-07]]"
|
||||
---
|
||||
# 2026-01-07 16:03:??
|
||||
|
||||
There is a palpable animosity for [[pdi-estimating#Bid Estimating|Bid]]
|
||||
in [[conest]],
|
||||
There is a palpable animosity for [[pdi-bid-estimating|Bid]]
|
||||
in [[conest|ConEst]],
|
||||
stemming (I believe) from an lack of buy-in on Bid's part.
|
||||
|
||||
The lack is easily explained by their [[estimating-culture#Incentives|incentive structure]]:
|
||||
|
||||
@@ -23,4 +23,4 @@ The award WBS shows $32,382 for equipment rental
|
||||
|
||||
I'm dubious of all these explanations,
|
||||
but I don't have another one.
|
||||
I can't find the ConEst folder or Accubid file.
|
||||
I can't find the ConEst folder or [[accubid|Accubid]] file.
|
||||
|
||||
@@ -34,7 +34,7 @@ Follow up to [[2026-01-09_10-00-03#Lighting Control]]
|
||||
|
||||
Josh stated my takeoff was correct per drawings,
|
||||
but that concessions would need to be made for the scope
|
||||
as sold by [[pdi-estimating#Bid Estimating|Bid]].
|
||||
as sold by [[pdi-bid-estimating|Bid]].
|
||||
At his direction I've removed dimming from BOH and corridor spaces.
|
||||
The remaining takeoff will remain,
|
||||
a $4/sf budget for a lighting control system for those areas was added.
|
||||
|
||||
@@ -10,7 +10,7 @@ daily: "[[2026-01-14]]"
|
||||
|
||||
Follow-up to [[2026-01-13_11-28-14#Lighting Control]]
|
||||
|
||||
> [!quote] Conversation between [[joel-jansen]] and Christian Pereiro regarding lighting control for [[2100-crystal-drive]]:
|
||||
> [!quote] Conversation between [[joel-jansen]] and [[christian-pereiro]] regarding lighting control for [[2100-crystal-drive]]:
|
||||
>
|
||||
> **Joel:** "It was sold as local."
|
||||
>
|
||||
|
||||
@@ -1,14 +1,15 @@
|
||||
---
|
||||
id: 2026-01-25T18:46:00-0500
|
||||
title: 2026-01-25 18:46:??
|
||||
tags:
|
||||
- topic/finance
|
||||
tags: []
|
||||
daily: "[[2026-01-25]]"
|
||||
---
|
||||
# 2026-01-25 18:46:??
|
||||
|
||||
### Calculating Monthly Principal & Interest Payment
|
||||
|
||||
Relevant to [[finance]]:
|
||||
|
||||
For a **fixed-rate, fully-amortizing mortgage**,
|
||||
the monthly payment is computed using the **standard amortization formula**:
|
||||
|
||||
|
||||
@@ -1,15 +1,14 @@
|
||||
---
|
||||
id: 2026-01-29T17:57:00-0500
|
||||
title: 2026-01-29 17:57:??
|
||||
tags:
|
||||
- topic/finance
|
||||
tags: []
|
||||
daily: "[[2026-01-29]]"
|
||||
---
|
||||
# 2026-01-29 17:57:??
|
||||
|
||||
### Calculating Utility of Above-Minimum Mortgage Payment
|
||||
|
||||
See [[2026-01-25#Calculating Monthly Principal & Interest Payment]].
|
||||
Follow-up to [[2026-01-25#Calculating Monthly Principal & Interest Payment]]:
|
||||
|
||||
Homeowners are often advised to make elective mortgage payments
|
||||
to reduce the total interest paid on the loan,
|
||||
@@ -21,8 +20,8 @@ and are deciding whether to make an elective payment on your mortgage
|
||||
or to invest in a promising opportunity.
|
||||
|
||||
The return on electing to pay $E$ to the mortgage
|
||||
is the
|
||||
(i.e., interest that will no longer accrue)
|
||||
is the ...
|
||||
(i.e. interest that will no longer accrue)
|
||||
at the end of the loan is:
|
||||
|
||||
$$
|
||||
|
||||
@@ -8,6 +8,6 @@ daily: "[[2026-02-03]]"
|
||||
---
|
||||
# 2026-02-03 16:17:00
|
||||
|
||||
Valued in [[conest]] estimators:
|
||||
Valued in [[conest|ConEst]] estimators:
|
||||
* **consistency**
|
||||
* **humility** --- willingness to say "I don't know that, please teach me"
|
||||
|
||||
@@ -10,13 +10,13 @@ daily: "[[2026-02-04]]"
|
||||
|
||||
## Questions for ConEst
|
||||
|
||||
[[conest]]
|
||||
[[conest|ConEst]]
|
||||
|
||||
### Purpose of ConEst
|
||||
|
||||
What is the purpose of ConEst?
|
||||
To comb for requirements Bid missed?
|
||||
To create the CBOM for Ops?
|
||||
To comb for requirements [[pdi-bid-estimating|Bid]] missed?
|
||||
To create the CBOM for [[pdi-operations|Ops]]?
|
||||
Anything else?
|
||||
How do they rank in importance?
|
||||
|
||||
|
||||
@@ -29,7 +29,7 @@ attended by [[christian-pereiro]], [[joel-jansen]], and myself.
|
||||
Systems refused to quote lighting control due to lack of detail,
|
||||
but sufficient detail was provided.
|
||||
|
||||
Bid expected takeoff to include DLM devices and cabling.
|
||||
[[pdi-bid-estimating|Bid]] expected takeoff to include DLM devices and cabling.
|
||||
|
||||
### Closeout
|
||||
|
||||
|
||||
@@ -25,6 +25,6 @@ and continuing takeoff as if the scope were not typical
|
||||
|
||||
The ability to reorder and permanently delete takeoff
|
||||
would invalidate most concerns here,
|
||||
however Accubid's solution to typical scope
|
||||
however [[accubid|Accubid]]'s solution to typical scope
|
||||
(named-typicals-as-breakdowns)
|
||||
is still clunky and unsuitable for large projects.
|
||||
|
||||
@@ -12,7 +12,7 @@ date-created: 2026-02-27T13:58:30-05:00
|
||||
## Conversation Regarding ConEst Pre-Takeoff Email Template
|
||||
|
||||
A conversation with a peer via Microsoft teams
|
||||
regarding [[conest]]'s
|
||||
regarding [[conest|ConEst]]'s
|
||||
recent implementation of [[conest-pre-takeoff-email-template]].
|
||||
|
||||
### Peer @ 13:42
|
||||
@@ -50,7 +50,7 @@ I've heard other estimators say it shouldn't be our job
|
||||
because it doesn't affect our takeoff,
|
||||
but I think that's misguided.
|
||||
It could be said that it's always been ConEst's purpose
|
||||
to check Bid's work _generally_, even outside of takeoff,
|
||||
to check [[pdi-bid-estimating|Bid]]'s work _generally_, even outside of takeoff,
|
||||
only until now, the things we considered important enough to check
|
||||
have happened to line up with takeoff.
|
||||
|
||||
|
||||
@@ -10,7 +10,7 @@ date-created: 2026-02-28T12:02:03-05:00
|
||||
---
|
||||
# 2026-02-28 12:02:03
|
||||
|
||||
It is difficult to express how _little_ Accubid does for the user.
|
||||
It is difficult to express how _little_ [[accubid|Accubid]] does for the user.
|
||||
Except for LiveCount and SupplierLink
|
||||
(which are separate programs anyhow)
|
||||
100% of its functionality could be replicated with database queries.
|
||||
|
||||
@@ -37,7 +37,7 @@ Has not had a chance to complete a Garden style project at this time.
|
||||
|
||||
* Create a unit matrix Excel document.
|
||||
|
||||
* Enter information into Accubid.
|
||||
* Enter information into [[accubid|Accubid]].
|
||||
|
||||
#### Score: Highly Proficient
|
||||
|
||||
@@ -131,7 +131,7 @@ Identify wiring type, receptacle and switch specs based on Unit panel, proposal
|
||||
|
||||
Minimal to no issues on unit take-offs.
|
||||
Captures all systems included in our scope.
|
||||
Gets clarification from myself or Bid
|
||||
Gets clarification from myself or [[pdi-bid-estimating|Bid]]
|
||||
on discrepencies between drawings/PDI proposal (typically telecom).
|
||||
|
||||
### Skill: Units Sub feeds
|
||||
|
||||
@@ -202,7 +202,7 @@ and seeks help for more complex situations.
|
||||
Regularly achieves performance targets and actions.
|
||||
|
||||
%%
|
||||
Joel framed [[pdi-estimating#Bid Estimating|Bid Estimating]]
|
||||
Joel framed [[pdi-bid-estimating|Bid Estimating]]
|
||||
as the customer in question,
|
||||
and implied that if I had a more involved relationship
|
||||
with the relevant bid estimators (namely Christian)
|
||||
@@ -342,7 +342,7 @@ Delivers exceptional performance and actions,
|
||||
far beyond role targets.
|
||||
|
||||
%%
|
||||
We discussed my fluency in Accubid,
|
||||
We discussed my fluency in [[accubid|Accubid]],
|
||||
which is a skill I'm annoyed to have.
|
||||
It's like being really good at digging trenches with a garden trowel.
|
||||
Skill using a poor tool
|
||||
|
||||
@@ -21,7 +21,7 @@ with a search algorithm like [A*](https://en.wikipedia.org/wiki/A*_search_algori
|
||||
Such a program could also calculate voltage drop.
|
||||
|
||||
I think, though, I may have been unfair to my employers (current and previous).
|
||||
Innovative methods will always be bottlenecked by Accubid's strict input pattern,
|
||||
Innovative methods will always be bottlenecked by [[accubid|Accubid]]'s strict input pattern,
|
||||
but there are still opportunities for improvement
|
||||
that can comply with existing expectations of evidence.
|
||||
|
||||
|
||||
@@ -26,7 +26,7 @@ be used to track
|
||||
Intent is too provide information to the bid team
|
||||
potentially to be qualified in future bids.
|
||||
|
||||
> 1. ConEst deviates from specs based on direction from Bid.
|
||||
> 1. ConEst deviates from specs based on direction from [[pdi-bid-estimating|Bid]].
|
||||
> 2. Awarded contract does not include respect for the direction
|
||||
> 3. Ops, not aware of direction, believes ConEst takeoff was in error.
|
||||
|
||||
|
||||
@@ -13,7 +13,7 @@ daily: "[[2026-03-25]]"
|
||||
|
||||
Direction for [[telecom-takeoff]] and [[low-voltage-takeoff]]
|
||||
concerning the proper interpretation of "free-air per code"
|
||||
as used by [[pdi-estimating#Bid Estimating|Bid]] to qualify our scope.
|
||||
as used by [[pdi-bid-estimating|Bid]] to qualify our scope.
|
||||
Relevant to [[charlotte-south-end-hotel]].
|
||||
|
||||
> [!quote] Charlotte South End Proposal 2025-12-12 Ex. B Notes
|
||||
|
||||
@@ -21,4 +21,4 @@ Project start date according to the Approved PDI Labor Plan is 2025-05-04.
|
||||
|
||||
***
|
||||
|
||||
Bid used 8.25% as they ought to have.
|
||||
[[pdi-bid-estimating|Bid]] used 8.25% as they ought to have.
|
||||
|
||||
@@ -27,6 +27,8 @@ estimator and senior tasks.
|
||||
|
||||
#### 2. Accubid Extension Pricing
|
||||
|
||||
Relevant to [[pdi-accubid-extension]]:
|
||||
|
||||
PDI used as vendor as required.
|
||||
|
||||
Quotes requested, received for any specialty items.
|
||||
|
||||
@@ -58,9 +58,9 @@ Joel intends to substitute.
|
||||
***
|
||||
|
||||
**\[2026-03-26 09:36\]**
|
||||
After conversation with Christian,
|
||||
After conversation with [[christian-pereiro]],
|
||||
Joel substituted all EMT feeders for MC cable.
|
||||
Christian stated that [[pdi-estimating#Bid Estimating|they]]
|
||||
Christian stated that [[pdi-bid-estimating|they]]
|
||||
would qualify the substitution in their next proposal
|
||||
and raised that 5 inch EMT does not exist in our database anyway[^1].
|
||||
|
||||
|
||||
@@ -49,7 +49,7 @@ Confirmed for 1990.
|
||||
|
||||
Fire pump feeds are not tagged as 2hr rated
|
||||
takeoff assumed 2hr rated MC cable ("Vitalink")
|
||||
to be confirmed with Christian.
|
||||
to be confirmed with [[christian-pereiro]].
|
||||
|
||||
### EV Chargers
|
||||
|
||||
|
||||
@@ -99,7 +99,7 @@ expected ~0.120.
|
||||
***
|
||||
|
||||
Josh found the answer to a question of scope
|
||||
in the qualifications of Bid's proposal.
|
||||
in the qualifications of [[pdi-bid-estimating|Bid]]'s proposal.
|
||||
he said he did not immediately think to look for them
|
||||
because they are rare of current proposals.
|
||||
Apparently they are penalized by the Proposal Audit Scorecard.
|
||||
|
||||
@@ -41,7 +41,7 @@ with the expectation that they may need to substitute them
|
||||
following [[conest-senior-review]].
|
||||
This is a [[heuristics|heuristic]]
|
||||
in that it achieves an outcome acceptable to the estimator
|
||||
despite being objectionable according to established[^1] [[conest]] practice.
|
||||
despite being objectionable according to established[^1] [[conest|ConEst]] practice.
|
||||
|
||||
[^1]: As far as it can be said to be established...
|
||||
|
||||
|
||||
@@ -20,7 +20,7 @@ he told me to use my best judgement.
|
||||
I told him that _my_ intuition,
|
||||
trained from my time estimating for Ace,
|
||||
is to break down by **scope**,
|
||||
but that [[conest]] usually breaks down by **location**.
|
||||
but that [[conest|ConEst]] usually breaks down by **location**.
|
||||
He agreed that is the preference,
|
||||
and since the previous estimator's breakdowns
|
||||
did not include Building Areas for the FB zones anyway
|
||||
|
||||
@@ -10,11 +10,12 @@ daily: "[[2026-04-10]]"
|
||||
---
|
||||
# 2026-04-10 08:28:18
|
||||
|
||||
I tend to think I have more to contribute to [[conest]] than to Bid.
|
||||
I tend to think I have more to contribute to [[conest|ConEst]]
|
||||
than I do to [[pdi-bid-estimating|Bid]].
|
||||
I'd need to know more about the executive philosophy of both
|
||||
before I could decide to switch or stay.
|
||||
|
||||
> Moreover, what about estimating coordinators and "estimating solutions"?
|
||||
> Moreover, what about estimating coordinators and "[[pdi-estimating-solutions|Estimating Solutions]]"?
|
||||
|
||||
I know very little now,
|
||||
but it doesn't seem many are more certain.
|
||||
@@ -38,4 +39,5 @@ jobs of every size tend to take about two weeks
|
||||
(80 estimator hours plus change for review).
|
||||
In order for ConEst to estimate as budgeted,
|
||||
we would need standards for acceptable takeoff
|
||||
at multiple levels of estimating detail.
|
||||
at multiple levels of estimating detail,
|
||||
which we do not.
|
||||
|
||||
@@ -22,4 +22,4 @@ The use of 450kcmil for the EGC is strange:
|
||||
* it is a non-standard size anyway,
|
||||
not appearing in [[nfpa-70_ch09|Chapter 9]] tables,
|
||||
the [[neca-mlu]],
|
||||
or our Accubid database.
|
||||
or our [[accubid|Accubid]] database.
|
||||
|
||||
@@ -51,7 +51,7 @@ are not actionable plans.
|
||||
"Mistake" may be a misnomer,
|
||||
because acceptability is not objective.
|
||||
For example:
|
||||
two [[conest]] senior estimators
|
||||
two [[conest|ConEst]] senior estimators
|
||||
may disagree on the acceptability of a certain [[heuristics|heuristic]].
|
||||
It may still be useful to record criticism from the more stringent senior
|
||||
as a mistake, even if their position is less popular.
|
||||
|
||||
@@ -26,7 +26,7 @@ High-Level
|
||||
|
||||
Process changes
|
||||
|
||||
Accubid Anywhere
|
||||
[[accubid|Accubid Anywhere]]
|
||||
|
||||
#### Also Planned
|
||||
|
||||
|
||||
@@ -11,7 +11,11 @@ Follow-up to [[2026-04-23_16-24-49]]:
|
||||
|
||||
Knowing now that [[pdi-operations|Ops]]'s baseline estimate
|
||||
isn't entirely redundant with [[conest|ConEst]]'s,
|
||||
I'm less convinced that "detailed takeoff"
|
||||
(for lack of a better term[^1])
|
||||
could easily be removed from the [[pdi-estimating]] process.
|
||||
|
||||
[^1]: See [[traditional-estimating-methods]].
|
||||
|
||||
Suppose that an ongoing project
|
||||
with 1000 feet of #2 CU in its CBOM
|
||||
|
||||
@@ -16,6 +16,6 @@ and "fly\[ing\] by the seat of \[one's\] pants".
|
||||
|
||||
[Strategic Foresight](https://en.wikipedia.org/wiki/Strategic_foresight)
|
||||
has a Wikipedia page,
|
||||
but I'll be so bold as to suggest it shouldn't.
|
||||
but I'll be so bold as to suggest that it shouldn't.
|
||||
It has the same problem as [[project-management-tm|"project management"]]
|
||||
as the name of a discipline.
|
||||
|
||||
@@ -1,7 +0,0 @@
|
||||
---
|
||||
id: 2026-04-26T09:30:18-0400
|
||||
title: 2026-04-26 09:30:18
|
||||
tags: []
|
||||
daily: "[[2026-04-26]]"
|
||||
---
|
||||
# 2026-04-26 09:30:18
|
||||
@@ -17,7 +17,7 @@ with all runs less than 100ft.
|
||||
|
||||
I asked [[joel-jansen]] if it would be necessary
|
||||
to use minimum 10 AWG
|
||||
as is [[conest]] standard
|
||||
as is [[conest|ConEst]] standard
|
||||
for [[pdi-breakdowns#Bid Item Garage|Garage]].
|
||||
He said it would not be,
|
||||
and confirmed 12 AWG is acceptable in this case.
|
||||
|
||||
@@ -11,13 +11,13 @@ daily: "[[2026-04-27]]"
|
||||
Continuing a recent conversation
|
||||
I've been having with [[joel-jansen]]
|
||||
on [[voltage-drop]],
|
||||
both ideally and for application in [[conest]],
|
||||
Joel brought Bill Swan with Estimating Solutions
|
||||
both ideally and for application in [[conest|ConEst]],
|
||||
Joel brought Bill Swan with [[pdi-estimating-solutions|Estimating Solutions]]
|
||||
over to my desk.
|
||||
Bill said that when he is calculating voltage drop
|
||||
he doesn't the ubiquitous "Voltage Drop Calc 2011.xlsx"
|
||||
which uses a simple DC calculation,
|
||||
he uses [[pdi-vdc]]'s calculator,
|
||||
he uses [[pdi-vdc|VDC]]'s calculator,
|
||||
which is based on AC resistance and reactance.
|
||||
|
||||
I showed them my own calculator,
|
||||
|
||||
@@ -8,27 +8,36 @@ daily: "[[2026-04-27]]"
|
||||
|
||||
## Virginia Live! Internal Review
|
||||
|
||||
[[virginia-live-casino-and-hotel]]
|
||||
review of [[virginia-live-casino-and-hotel]] [[accubid|Accubid]] job
|
||||
with [[pdi-operations|Ops]]
|
||||
|
||||
Underfloor power is Reloc.
|
||||
Customer is curious if it would be more cost effective to use MC.
|
||||
|
||||
Objective is to discuss closeout mainly:
|
||||
### Meeting Objective
|
||||
|
||||
discuss closeout mainly:
|
||||
quotes and subs.
|
||||
|
||||
FF&E
|
||||
### Topics Discussed
|
||||
|
||||
#### Fixture Labor
|
||||
|
||||
> **Furniture, Fixtures, and Equipment (FF&E)**
|
||||
|
||||
Concern that all fixtures are captured
|
||||
|
||||
"add a line for aiming and testing"
|
||||
1 week (80 hours)
|
||||
|
||||
Shift rate
|
||||
#### Shift Rate
|
||||
|
||||
"in the past we've paid a little more for night work,
|
||||
but nothing crazy"
|
||||
|
||||
$2,500 per day scaffold
|
||||
#### Site Services
|
||||
|
||||
### Site Services
|
||||
$2,500 per day scaffold
|
||||
|
||||
Ditch witches for most excavation
|
||||
|
||||
@@ -40,7 +49,7 @@ hydraulic bender
|
||||
Do we own dewatering?
|
||||
pretty sure yes
|
||||
|
||||
### MV Terminations
|
||||
#### MV Terminations
|
||||
|
||||
No one at PDI can perform MV terms
|
||||
so they must be subbed out
|
||||
@@ -51,7 +60,7 @@ worst case $300k
|
||||
|
||||
to be quoted by Ops
|
||||
|
||||
### Testing
|
||||
#### Testing
|
||||
|
||||
primary injection testing
|
||||
|
||||
@@ -59,25 +68,25 @@ NETA testing
|
||||
|
||||
to be quoted by Ops
|
||||
|
||||
### Rigging
|
||||
#### Rigging
|
||||
|
||||
Ops quoted $85k to take one generator off the truck.
|
||||
|
||||
to be quoted by Ops
|
||||
|
||||
### Burden
|
||||
#### Burden
|
||||
|
||||
PTO not included in burden
|
||||
because it is not charged to the job
|
||||
|
||||
### Admin Housing
|
||||
|
||||
Ops paying $4,500 for 6-bed
|
||||
Ops paying $4,500 per month for 6-bed
|
||||
|
||||
### Composite Cleanup
|
||||
#### Composite Cleanup
|
||||
|
||||
terms in contract
|
||||
exact terms in contract
|
||||
|
||||
### Permits
|
||||
#### Permits
|
||||
|
||||
to be quoted by Ops
|
||||
|
||||
Reference in New Issue
Block a user