vault backup: 2026-02-04 17:41:43
This commit is contained in:
+1
-1
@@ -148,7 +148,7 @@
|
||||
"enabled": true,
|
||||
"single-quote-enabled": true,
|
||||
"single-quote-style": "''",
|
||||
"double-quote-enabled": true,
|
||||
"double-quote-enabled": false,
|
||||
"double-quote-style": "\"\""
|
||||
},
|
||||
"remove-consecutive-list-markers": {
|
||||
|
||||
Vendored
+4
-4
@@ -221,9 +221,9 @@
|
||||
"clearSelectionAfterAutoPaste": true,
|
||||
"respectCursorPositionWhenAutoPaste": true,
|
||||
"blankLineAboveAppendedContent": true,
|
||||
"autoCopy": false,
|
||||
"autoCopy": true,
|
||||
"autoFocus": false,
|
||||
"autoPaste": false,
|
||||
"autoPaste": true,
|
||||
"autoFocusTarget": "last-active-and-open-then-last-paste",
|
||||
"autoPasteTarget": "last-active-and-open-then-last-paste",
|
||||
"openAutoFocusTargetIfNotOpened": true,
|
||||
@@ -234,11 +234,11 @@
|
||||
"executeCommandWhenTargetNotIdentified": true,
|
||||
"commandToExecuteWhenTargetNotIdentified": "switcher:open",
|
||||
"autoPasteTargetDialogTimeoutSec": 20,
|
||||
"autoCopyToggleRibbonIcon": true,
|
||||
"autoCopyToggleRibbonIcon": false,
|
||||
"autoCopyIconName": "highlighter",
|
||||
"autoFocusToggleRibbonIcon": true,
|
||||
"autoFocusIconName": "zap",
|
||||
"autoPasteToggleRibbonIcon": true,
|
||||
"autoPasteToggleRibbonIcon": false,
|
||||
"autoPasteIconName": "clipboard-paste",
|
||||
"viewSyncFollowPageNumber": true,
|
||||
"viewSyncPageDebounceInterval": 0.3,
|
||||
|
||||
@@ -89,3 +89,75 @@ incentivize problematic (hare-hunting) behavior.
|
||||
Has such behavior been observed,
|
||||
or has chief strategy been organization-aligned
|
||||
in spite of the incentive?
|
||||
|
||||
## 2025-02-04
|
||||
|
||||
### T-Shirt Sizing
|
||||
|
||||
"T-shirt sizing" or "T-shirt size estimation"
|
||||
is a method of project estimation
|
||||
characterized by the use of T-shirt sizes
|
||||
representing project scale buckets.
|
||||
|
||||
> [!example]
|
||||
> * **XS (1-2 days):** Simple UI changes or minor bug fixes
|
||||
>
|
||||
> Example: "Update button color on checkout page"
|
||||
>
|
||||
> * **S (2-3 days):** Feature enhancements with minimal complexity
|
||||
>
|
||||
> Example: "Add product sorting by price"
|
||||
>
|
||||
> * **M (5-7 days):** Features requiring moderate integration
|
||||
>
|
||||
> Example: "Implement basic search filters"
|
||||
>
|
||||
> * **L (8-10 days):** Complex features affecting multiple components
|
||||
>
|
||||
> Example: "Create shopping cart functionality"
|
||||
>
|
||||
> * **XL (2+ weeks):** Major features requiring breaking down
|
||||
>
|
||||
> Example: "Implement payment gateway integration"
|
||||
>
|
||||
> --- [T-Shirt Sizing in Agile --- Project Management Pathways](https://www.projectmanagementpathways.com/project-management-articles/tshirt-sizing-in-agile-projects)
|
||||
|
||||
The buckets chosen should be wide enough
|
||||
that scale can be confidently estimated
|
||||
after minimal investigation.
|
||||
|
||||
## 2025-02-04 13:42
|
||||
|
||||
[[fire-alarm-takeoff]]
|
||||
|
||||
> [!quote] Art Baldwin 2026-02-04 (pp.)
|
||||
> Fire, smoke, and combination fire/smoke dampers
|
||||
> may require 120V power, and thus electrical takeoff,
|
||||
> or only 24V, in which case mechanical will own the scope.
|
||||
> Assuming 120V is a budget-conservative estimating convenience,
|
||||
> which is generally considered acceptable
|
||||
> in lieu of determining specified requirements,
|
||||
> but further investigation may be expected
|
||||
> if more than a few per floor are shown.
|
||||
|
||||
## 2025-02-04 17:02
|
||||
|
||||
While observing takeoff for
|
||||
[[electrical-takeoff#Unit Condensing Units|unit condensing units]],
|
||||
the project engineer expressed confusion
|
||||
at the process of calculating average horizontal length,
|
||||
expressing that it was more complicated than they expected
|
||||
considering takeoff procedure for similar processes.
|
||||
The PE asked why we would not simply use the maximum
|
||||
so that we would not risk having too little overall.
|
||||
|
||||
Their expectation surprised me,
|
||||
since it is intuitive to me
|
||||
that there must be some limit to the logic of "covering it"
|
||||
since it is always within our power to add contingency,
|
||||
and especially because, if anything,
|
||||
I feel that our procedures tend towards
|
||||
the upper end of reasonable ECI.
|
||||
(see [[value-of-information.jpg]])
|
||||
|
||||
My response was not well formulated.
|
||||
|
||||
@@ -0,0 +1,14 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
title: Advanced Tables
|
||||
tags: []
|
||||
---
|
||||
# Advanced Tables
|
||||
|
||||
| One | Two | Three |
|
||||
| ---:| ---:| -----:|
|
||||
| 1 | -2 | |
|
||||
| 1 | 3 | |
|
||||
| -1 | -3 | 0 |
|
||||
<!-- TBLFM: @>=(@2$3-@3) -->
|
||||
+1
-1
@@ -71,7 +71,7 @@ classDiagram
|
||||
pie title Estimating Process
|
||||
"Estimate Preparation" : 15
|
||||
"Takeoff" : 65
|
||||
"Estension & Review" : 10
|
||||
"Extension & Review" : 10
|
||||
"Bid Summary" : 10
|
||||
```
|
||||
|
||||
|
||||
@@ -64,6 +64,13 @@ per [[fire-resistive-wiring-methods-takeoff]].
|
||||
|
||||
#### Unit Condensing Units
|
||||
|
||||
| Level | Horizontal | Vertical | Length | Count |
|
||||
|:-------- | ----------:| --------:| ------:| -----:|
|
||||
| Level 01 | 150 | 40 | 190 | |
|
||||
| Level 02 | 150 | 30 | 180 | |
|
||||
| Level 03 | 150 | 20 | 170 | |
|
||||
| Level 04 | 150 | 10 | 160 | |
|
||||
|
||||
Put homeruns on the `Area` of the dwelling unit.
|
||||
Put connections on the `Area` of the CU.
|
||||
|
||||
@@ -102,3 +109,7 @@ Max 20 disconnects per rack
|
||||
|
||||
Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||
* **Length** = average floor to floor height
|
||||
|
||||
### Fire/Smoke Dampers
|
||||
|
||||
[[fire-alarm-takeoff#Fire/Smoke Dampers (FSD's)]]
|
||||
@@ -191,7 +191,12 @@ _Design Build (alternative method):_
|
||||
* 15ft from end of corridor,
|
||||
* then every 50ft
|
||||
|
||||
## Fire Smoke Dampers (FSD's)
|
||||
## Fire/Smoke Dampers (FSD's)
|
||||
|
||||
> [!info]
|
||||
> Refers to fire, smoke, and combination fire/smoke dampers.
|
||||
|
||||
|
||||
|
||||
In [[pdi-building-types#High Rise|high rise construction]],
|
||||
usually found on every level with units.
|
||||
|
||||