vault backup: 2026-02-04 17:41:43
This commit is contained in:
+1
-1
@@ -148,7 +148,7 @@
|
|||||||
"enabled": true,
|
"enabled": true,
|
||||||
"single-quote-enabled": true,
|
"single-quote-enabled": true,
|
||||||
"single-quote-style": "''",
|
"single-quote-style": "''",
|
||||||
"double-quote-enabled": true,
|
"double-quote-enabled": false,
|
||||||
"double-quote-style": "\"\""
|
"double-quote-style": "\"\""
|
||||||
},
|
},
|
||||||
"remove-consecutive-list-markers": {
|
"remove-consecutive-list-markers": {
|
||||||
|
|||||||
Vendored
+4
-4
@@ -221,9 +221,9 @@
|
|||||||
"clearSelectionAfterAutoPaste": true,
|
"clearSelectionAfterAutoPaste": true,
|
||||||
"respectCursorPositionWhenAutoPaste": true,
|
"respectCursorPositionWhenAutoPaste": true,
|
||||||
"blankLineAboveAppendedContent": true,
|
"blankLineAboveAppendedContent": true,
|
||||||
"autoCopy": false,
|
"autoCopy": true,
|
||||||
"autoFocus": false,
|
"autoFocus": false,
|
||||||
"autoPaste": false,
|
"autoPaste": true,
|
||||||
"autoFocusTarget": "last-active-and-open-then-last-paste",
|
"autoFocusTarget": "last-active-and-open-then-last-paste",
|
||||||
"autoPasteTarget": "last-active-and-open-then-last-paste",
|
"autoPasteTarget": "last-active-and-open-then-last-paste",
|
||||||
"openAutoFocusTargetIfNotOpened": true,
|
"openAutoFocusTargetIfNotOpened": true,
|
||||||
@@ -234,11 +234,11 @@
|
|||||||
"executeCommandWhenTargetNotIdentified": true,
|
"executeCommandWhenTargetNotIdentified": true,
|
||||||
"commandToExecuteWhenTargetNotIdentified": "switcher:open",
|
"commandToExecuteWhenTargetNotIdentified": "switcher:open",
|
||||||
"autoPasteTargetDialogTimeoutSec": 20,
|
"autoPasteTargetDialogTimeoutSec": 20,
|
||||||
"autoCopyToggleRibbonIcon": true,
|
"autoCopyToggleRibbonIcon": false,
|
||||||
"autoCopyIconName": "highlighter",
|
"autoCopyIconName": "highlighter",
|
||||||
"autoFocusToggleRibbonIcon": true,
|
"autoFocusToggleRibbonIcon": true,
|
||||||
"autoFocusIconName": "zap",
|
"autoFocusIconName": "zap",
|
||||||
"autoPasteToggleRibbonIcon": true,
|
"autoPasteToggleRibbonIcon": false,
|
||||||
"autoPasteIconName": "clipboard-paste",
|
"autoPasteIconName": "clipboard-paste",
|
||||||
"viewSyncFollowPageNumber": true,
|
"viewSyncFollowPageNumber": true,
|
||||||
"viewSyncPageDebounceInterval": 0.3,
|
"viewSyncPageDebounceInterval": 0.3,
|
||||||
|
|||||||
@@ -89,3 +89,75 @@ incentivize problematic (hare-hunting) behavior.
|
|||||||
Has such behavior been observed,
|
Has such behavior been observed,
|
||||||
or has chief strategy been organization-aligned
|
or has chief strategy been organization-aligned
|
||||||
in spite of the incentive?
|
in spite of the incentive?
|
||||||
|
|
||||||
|
## 2025-02-04
|
||||||
|
|
||||||
|
### T-Shirt Sizing
|
||||||
|
|
||||||
|
"T-shirt sizing" or "T-shirt size estimation"
|
||||||
|
is a method of project estimation
|
||||||
|
characterized by the use of T-shirt sizes
|
||||||
|
representing project scale buckets.
|
||||||
|
|
||||||
|
> [!example]
|
||||||
|
> * **XS (1-2 days):** Simple UI changes or minor bug fixes
|
||||||
|
>
|
||||||
|
> Example: "Update button color on checkout page"
|
||||||
|
>
|
||||||
|
> * **S (2-3 days):** Feature enhancements with minimal complexity
|
||||||
|
>
|
||||||
|
> Example: "Add product sorting by price"
|
||||||
|
>
|
||||||
|
> * **M (5-7 days):** Features requiring moderate integration
|
||||||
|
>
|
||||||
|
> Example: "Implement basic search filters"
|
||||||
|
>
|
||||||
|
> * **L (8-10 days):** Complex features affecting multiple components
|
||||||
|
>
|
||||||
|
> Example: "Create shopping cart functionality"
|
||||||
|
>
|
||||||
|
> * **XL (2+ weeks):** Major features requiring breaking down
|
||||||
|
>
|
||||||
|
> Example: "Implement payment gateway integration"
|
||||||
|
>
|
||||||
|
> --- [T-Shirt Sizing in Agile --- Project Management Pathways](https://www.projectmanagementpathways.com/project-management-articles/tshirt-sizing-in-agile-projects)
|
||||||
|
|
||||||
|
The buckets chosen should be wide enough
|
||||||
|
that scale can be confidently estimated
|
||||||
|
after minimal investigation.
|
||||||
|
|
||||||
|
## 2025-02-04 13:42
|
||||||
|
|
||||||
|
[[fire-alarm-takeoff]]
|
||||||
|
|
||||||
|
> [!quote] Art Baldwin 2026-02-04 (pp.)
|
||||||
|
> Fire, smoke, and combination fire/smoke dampers
|
||||||
|
> may require 120V power, and thus electrical takeoff,
|
||||||
|
> or only 24V, in which case mechanical will own the scope.
|
||||||
|
> Assuming 120V is a budget-conservative estimating convenience,
|
||||||
|
> which is generally considered acceptable
|
||||||
|
> in lieu of determining specified requirements,
|
||||||
|
> but further investigation may be expected
|
||||||
|
> if more than a few per floor are shown.
|
||||||
|
|
||||||
|
## 2025-02-04 17:02
|
||||||
|
|
||||||
|
While observing takeoff for
|
||||||
|
[[electrical-takeoff#Unit Condensing Units|unit condensing units]],
|
||||||
|
the project engineer expressed confusion
|
||||||
|
at the process of calculating average horizontal length,
|
||||||
|
expressing that it was more complicated than they expected
|
||||||
|
considering takeoff procedure for similar processes.
|
||||||
|
The PE asked why we would not simply use the maximum
|
||||||
|
so that we would not risk having too little overall.
|
||||||
|
|
||||||
|
Their expectation surprised me,
|
||||||
|
since it is intuitive to me
|
||||||
|
that there must be some limit to the logic of "covering it"
|
||||||
|
since it is always within our power to add contingency,
|
||||||
|
and especially because, if anything,
|
||||||
|
I feel that our procedures tend towards
|
||||||
|
the upper end of reasonable ECI.
|
||||||
|
(see [[value-of-information.jpg]])
|
||||||
|
|
||||||
|
My response was not well formulated.
|
||||||
|
|||||||
@@ -0,0 +1,14 @@
|
|||||||
|
---
|
||||||
|
id:
|
||||||
|
aliases: []
|
||||||
|
title: Advanced Tables
|
||||||
|
tags: []
|
||||||
|
---
|
||||||
|
# Advanced Tables
|
||||||
|
|
||||||
|
| One | Two | Three |
|
||||||
|
| ---:| ---:| -----:|
|
||||||
|
| 1 | -2 | |
|
||||||
|
| 1 | 3 | |
|
||||||
|
| -1 | -3 | 0 |
|
||||||
|
<!-- TBLFM: @>=(@2$3-@3) -->
|
||||||
+1
-1
@@ -71,7 +71,7 @@ classDiagram
|
|||||||
pie title Estimating Process
|
pie title Estimating Process
|
||||||
"Estimate Preparation" : 15
|
"Estimate Preparation" : 15
|
||||||
"Takeoff" : 65
|
"Takeoff" : 65
|
||||||
"Estension & Review" : 10
|
"Extension & Review" : 10
|
||||||
"Bid Summary" : 10
|
"Bid Summary" : 10
|
||||||
```
|
```
|
||||||
|
|
||||||
|
|||||||
@@ -64,6 +64,13 @@ per [[fire-resistive-wiring-methods-takeoff]].
|
|||||||
|
|
||||||
#### Unit Condensing Units
|
#### Unit Condensing Units
|
||||||
|
|
||||||
|
| Level | Horizontal | Vertical | Length | Count |
|
||||||
|
|:-------- | ----------:| --------:| ------:| -----:|
|
||||||
|
| Level 01 | 150 | 40 | 190 | |
|
||||||
|
| Level 02 | 150 | 30 | 180 | |
|
||||||
|
| Level 03 | 150 | 20 | 170 | |
|
||||||
|
| Level 04 | 150 | 10 | 160 | |
|
||||||
|
|
||||||
Put homeruns on the `Area` of the dwelling unit.
|
Put homeruns on the `Area` of the dwelling unit.
|
||||||
Put connections on the `Area` of the CU.
|
Put connections on the `Area` of the CU.
|
||||||
|
|
||||||
@@ -102,3 +109,7 @@ Max 20 disconnects per rack
|
|||||||
|
|
||||||
Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
Takeoff: `COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`TRASH CHUTE RISER CIRCUIT...`
|
||||||
* **Length** = average floor to floor height
|
* **Length** = average floor to floor height
|
||||||
|
|
||||||
|
### Fire/Smoke Dampers
|
||||||
|
|
||||||
|
[[fire-alarm-takeoff#Fire/Smoke Dampers (FSD's)]]
|
||||||
@@ -191,7 +191,12 @@ _Design Build (alternative method):_
|
|||||||
* 15ft from end of corridor,
|
* 15ft from end of corridor,
|
||||||
* then every 50ft
|
* then every 50ft
|
||||||
|
|
||||||
## Fire Smoke Dampers (FSD's)
|
## Fire/Smoke Dampers (FSD's)
|
||||||
|
|
||||||
|
> [!info]
|
||||||
|
> Refers to fire, smoke, and combination fire/smoke dampers.
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
In [[pdi-building-types#High Rise|high rise construction]],
|
In [[pdi-building-types#High Rise|high rise construction]],
|
||||||
usually found on every level with units.
|
usually found on every level with units.
|
||||||
|
|||||||
Binary file not shown.
|
After Width: | Height: | Size: 46 KiB |
Reference in New Issue
Block a user