Files
zmVault/timestamped/2026-04-22_13-41-20.md

21 lines
423 B
Markdown

---
id: 2026-04-22T13:41:20-0400
title: 2026-04-22 13:41:20
tags:
- occupational
daily: "[[2026-04-22]]"
---
# 2026-04-22 13:41:20
## Trust the Process
[[feeders-takeoff]]:
Separate UG, OH, and Flex Feeder assemblies
add extra terminations, wire, and conduit fittings
that will not be necessary for installation.
[[electrical-takeoff]]:
Mech Connection assemblies
do not include disconnects
nor labor to install them.