Files
zmVault/timestamped/2026-05-14_08-19-37.md

74 lines
1.6 KiB
Markdown

---
id: 2026-05-14T08:19:37-0400
title: 2026-05-14 08:19:37
tags:
- occupational
daily: "[[2026-05-14]]"
---
# 2026-05-14 08:19:37
## 303 Mariposa Residence Pre-takeoff Confirmation Email Review
Consultation with [[josh-ford|Josh Ford]]
regarding [[conest-pre-takeoff-confirmation]]
for [[303-mariposa-residence]].
The project being a single family home,
primary estimator [[jared-defanti]] requested Josh's aid
with precise wording and takeoff assumptions.
### Questions
> [!quote] Proposal 2026-05-06
> _Telecom, Data & Cable TV _
>
> 49\. Back boxes and stub ups "As required"
Josh confirmed we are to exclude backboxes and stub-ups from takeoff.
### Other Direction
#### Metal Boxes
Highlight 12 AWG minimum, metal boxes;
add note "please confirm".
#### PVC Conduit
Confirmed no PVC except secondaries.
Secondaries PVC40 with PVC80 elbow and stub-up.
#### Project Drawing/Detail Callouts
Delete section [[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
since empty.
#### Fire Alarm
Use `TERMINAL CABINET` not `HEAD END`.
Did not specifically discuss with Josh,
but assuming free-air assemblies for devices
#### Lighting Control
Confirmed 0-10V/Line voltage dimming per schedule.
Use "Low voltage" (rough-in only) assemblies
Note "rough-in only" in email.
> Josh pointed out dimming receptacles.
#### Low Voltage
Add new line:
"Shade Control: System is alternate, do we own rough-in?".
#### Other
Josh noted that [[conest#ConEst Senior Estimator|seniors]]
appreciate the new [[conest-pre-takeoff-confirmation]] process
because they feel more familiar with the job
when in [[conest-senior-review]].