2.1 KiB
2.1 KiB
id, aliases, title, tags
| id | aliases | title | tags | |||||
|---|---|---|---|---|---|---|---|---|
| Misc Budgets Takeoff |
|
Misc Budgets Takeoff
Drawing= "N/A"System= "EL - Electrical"
Slab Deck
Takeoff: ITEM DATABASE/MISC PDI PRODUCT/MISC MATERIAL - SLAB/DECK & FEEDER/MISC MATERIAL - SLAB/DECK (NAILS, PAINT, TAPE, ETC = $250)
- Count = 1
-
Area= "Typical - Building All Levels"- 1 each level except roof
- High Density: 1 per Section
Phase= "Building - BOH, Storage & Common"
-
Area= "Typical - Garage All Levels"Phase= "Garage"
Temporary Power & Lighting
Temp Power
-
Area= "2 - Site"Phase= "Temp Power"System= "TPS - Temp Power Service (Site)"BidItem= "1 - Site"
Takeoff:
ITEM DATABASE/TEMPORARY POWER/TEMPORARY POWER - ... SERVICE- Count = 1
Temp Lighting
-
Area= "01 - Temp Power Distribution Building"Phase= "Temp Power"System= "TPD - Temp Power Distribution (Gag. & Bldg.)"BidItem= "3 - Building"
ITEM DATABASE/TEMPORARY POWER/...Garden Style:
- Takeoff: .../
TEMPORARY POWER - T POLE (EACH)- Count = 1 per 150ft per building
All others:
- Takeoff: .../
* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)- Count = Building GSF = Total GSF - Garage GSF
-
Area= "01 - Temp Power Distribution Garage"Phase= "Temp Power"System= "TPD - Temp Power Distribution (Gag. & Bldg.)"BidItem= "2 - Garage"
Takeoff:
ITEM DATABASE/TEMPORARY POWER/* - TEMPORARY LIGHTING / PWR PNL (PER BLDG AREA SFT)- Count = Garage GSF
Irrigation Pumps
-
Area= "2 - Site"Phase= "Temp Power"System= "MISC - Site Miscellaneous"BidItem= "1 - Site"
Takeoff:
COMMON ASSEMBLIES/MECHANICAL CONNECTIONS (UP TO 100A)/PVC - LT NM FLEX (CARFLEX)/30A 3PH MECH CONN (200') 3/4" PVC 4#10 - CARFLEX- Count = 3
Prepend to name: "Irrigation Pumps - "