# Risk Management for Construction Estimating
|
|
|
|
Cross-topic of [[risk-management]] and [[construction-estimating]].
|
|
|
|
## Estimating as Risk Mitigation
|
|
|
|
* reduce risk of wasted estimation effort due to bid loss
|
|
(prefer lower bid)
|
|
* reduce risk of project overrun
|
|
(prefer higher bid)
|
|
|
|
Estimating resources should be allocated
|
|
according to Return on Mitigation (RoM),
|
|
that is, their contribution to _cost certainty_.
|
|
|
|
$\text{Efficiency} = -1 \times \frac{d\sigma}{dt}$
|