46 lines
881 B
Markdown
46 lines
881 B
Markdown
---
|
|
id:
|
|
aliases: []
|
|
title: "PDI Accubid Closeout: Final Price"
|
|
tags:
|
|
- authorship/original
|
|
- destiny/permanent
|
|
- occupational/closeout
|
|
- status/incomplete
|
|
- type/guide
|
|
dg-publish: true
|
|
---
|
|
# PDI Accubid Closeout: Final Price
|
|
|
|
## Material Tax
|
|
|
|
**Calculated %** <- Cumulative sales tax at project address.
|
|
|
|
## Markup
|
|
|
|
Clear markup values from **Calculated %**:
|
|
* "Database Material Markup"
|
|
* "Quoted Material Markup"
|
|
* "Labor Markup"
|
|
* "Adjustment Markup"
|
|
|
|
Ensure markup was cleared from previous tabs:
|
|
* "Subcontractors Markup"
|
|
* "General Expenses Markup"
|
|
* "Equipment Markup"
|
|
|
|
## Warranty
|
|
|
|
* **Modified ($)** <- $0.05 per gross area square foot
|
|
|
|
## CIP
|
|
|
|
Only if "CIP" is included in Base Bid.
|
|
See proposal section "Insurance" if present.
|
|
|
|
**Modified ($)** <- $\frac{0.136}{100} \times \text{Contract Value}$
|
|
|
|
## Selling Price
|
|
|
|
**Modified ($)** <- Proposal Base Bid Total
|