Files
zmVault/telecom-takeoff.md
T

120 lines
2.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
id:
aliases: []
tags:
- authorship/original
- destiny/permanent
- occupational/takeoff/telecom
- status/draft
- type/guide
title: Telecom
---
# Telecom
> [!info] Scope
> * Telephone
> * Data
> * Cable TV
> [!important]
> Not to be confused with [[low-voltage-takeoff]].
## "Site Low Voltage Duct Bank"
* Conduit from outside of building to MDF
| | |
| ---------- | --------------------------------- |
| `Area` | "2 - Site" |
| `Phase` | "Site" |
| `System` | "LVD - Site Low Voltage Ductbank" |
| `Bid Item` | "1 - Site" |
`COMMON ASSEMBLIES`/`PDI EMPTY CONDUIT`
Size and quantity per proposal > drawings > assume (4) 4"C
* **Length** = Length measured from MDF to 5ft beyond building footprint
_Garden Style:_ Outside of every building
### Telecom Vaults
"Quazite Box"
polymer concrete enclosure
`TEMPORARY ITEMS`/...
* **Material Price** = 1000.00
* **Labor Hours** = 12.00
* **Sort Code**? = 200
`COMMON ASSEMBLIES`/`POLES / EXCAVATION / CORING / UG PULL BX`/`MANHOLES / PULL BOXES / EXCAVATION / CONCRETE`/...
## Backbone Riser
(2) 4"C or (4) 4"C ULO
| | |
| --------- | ------------------------------- |
| `Phase` | "Building - BOH ..." |
| `System` | "TC - Telecom Backbone" |
Add sleeves
### Horizontal Backbone
| | |
| --------- | --------------------- |
| `Drawing` | Telecom riser diagram |
| `Area` | Area of riser room |
* **Length** = Length measured from MDF to IDF.
* Input adder length to reach the level of the IDF (Minimum 15ft).
### Vertical Backbone
| | |
| --------- | ------------------------------- |
| `Drawing` | Telecom riser diagram |
| `Area` | "Typical - Building All Levels" |
* **Length** = Length between floors (15ft ULO)
## Telecom Backboard
As shown on plans.
| | |
| -------- | ------------------------------- |
| `Phase` | "Building - BOH ..." |
| `System` | "TC - Telecom Backbone" |
`COMMON ASSEMBLIES`/`MISC ASSEMBLIES`/`... PLYWOOD BACKBOARD`
## Corridor Conduit (Unit MSDE to IDF)
Empty conduit, either of
* `FEEDER CONDUIT AND WIRE`/...
* `COMMON ASSEMBLIES`/`PDI EMPTY & DUCTBANK CONDUIT`/...
One Takeoff per Area per level
* **Length** = Average of subfeed lengths × # of Units
* **Count** = # of Units
## Inner Duct
For future use (e.g. fiber)
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`INNERDUCT`/`... (GP)`
## Devices
As shown on plans. Ignore floor boxes, other electrical scope.
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/...
* .../`BOH / AMENITY ASSEMBLIES`
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY`