26 lines
1.1 KiB
Markdown
26 lines
1.1 KiB
Markdown
---
|
|
id: 2026-03-29T16:01:12-0400
|
|
title: 2026-03-29 16:01:12
|
|
tags:
|
|
- status/draft
|
|
date-created: 2026-03-29T16:01:12-04:00
|
|
daily: "[[2026-03-29]]"
|
|
---
|
|
# 2026-03-29 16:01:12
|
|
|
|
## AACE Estimate Classification
|
|
|
|
[Association for the Advancement of Cost Engineering (AACE)](https://web.aacei.org/)
|
|
|
|
AACE International Recommended Practice No. 18R-97
|
|
|
|
| Estimate Class | Expected Accuracy (Low) | Expected Accuracy (High) |
|
|
| ------------------------------------------ | -----------------------:| ------------------------:|
|
|
| Class 5: Concept Screening | -20% to -50% | +30% to +100% |
|
|
| Class 4: Study or Feasibility | -15% to -30% | +20% to +50% |
|
|
| Class 3: Budget, Authorization, or Control | -10% to -20% | +10% to +30% |
|
|
| Class 2: Control or Bid/Tender | -5% to -15% | +5% to +20% |
|
|
| Class 1: Check Estimate or Bid/Tender | -3% to -10% | +3% to +15% |
|
|
|
|

|