66 lines
1.3 KiB
Markdown
66 lines
1.3 KiB
Markdown
---
|
|
id:
|
|
aliases: []
|
|
title: 2025-11-18
|
|
tags:
|
|
- authorship/original
|
|
- destiny/permanent
|
|
- status/draft
|
|
- type/periodic/daily
|
|
dg-publish: true
|
|
---
|
|
# 2025-11-18
|
|
|
|
## 2025-11-18 16:33
|
|
|
|
### Elliot St. ConEst Senior Review
|
|
|
|
#occupational
|
|
|
|
%%
|
|
Transcription of notes
|
|
taken while reviewing Elliot St. with Joel Jansen.
|
|
%%
|
|
|
|
Adorne USB Heating Designation was built with standard device.
|
|
Subbed for Adorne.
|
|
|
|
Subbed standard duplex receptacles in guestrooms for Adorne.
|
|
|
|
Confirmed fixture branch length changes
|
|
including Garage
|
|
|
|
Note: It is not usually necessary to count emergency fixtures separately.
|
|
|
|
Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).
|
|
|
|
Final Pricing adjustments:
|
|
Warranty,
|
|
CIP (see proposal)
|
|
|
|
Added putty pads.
|
|
|
|
Fire stopping budget = $25-35 per Unit.
|
|
|
|
Robotic Total Station hours: match Structural Foreman.
|
|
|
|
Equipment Cost $\approx$ 1% for contracts 5-15 million dollars.
|
|
|
|
Mid Atlantic: 1 trip per month
|
|
|
|
Offsite Parking: see bid sheet
|
|
|
|
Project Executive time same as Oversight.
|
|
|
|
When calculating durations for indirect labor, round down.
|
|
|
|
* Rough Foreman
|
|
* Trim Foreman
|
|
* Amenity Foreman
|
|
|
|
LV/FA Foreman: get hours from systems quote.
|
|
|
|
Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm"
|
|
|
|
Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.
|