Files
zmVault/fixtures.md
T

40 lines
726 B
Markdown

---
id:
aliases: []
tags:
- destiny/permanent
- occupational/systems/fixtures
- status/draft
- type/guide
title: Fixtures
---
# Fixtures
This system is only for luminaires and their immediate branch wiring.
See also [[lighting-controls]] and [[electrical]].
## Info
## Sequence
### 1. Preparation
1. Read about the project specifications and construction type
2. In drawings, locate:
* Fixture Schedule
* Reflected Ceiling Plans
### 2. Takeoff
See [[fixture-designations]].
1. Takeoff floor plans in order
2. Takeoff enlarged drawings
### 3. Review
1. Garage Homeruns
2. Luminaire in Amenity Areas
3. Ensure appropriate breakdowns
* Site lighting in System "FML - Site Fixtures Material & Labor"