Files
zmVault/grounding.md
T

1.2 KiB

id, aliases, tags, title
id aliases tags title
grounding
destiny/permanent
occupational/systems/feeders
status/draft
type/guide
Grounding

Grounding

Info

This script is intended to cover both electrical and telecom grounding in lieu of detail sufficient for standard takeoff (e.g. a grounding riser).

Note that the material provided in this system is intended to be budgetary, not especially consistent with the actual install.

Sequence

1. Preparation

Locate:

  • Main electric room (service entrance)
  • Remote electric rooms

2. Takeoff

COMMON ASSEMBLIES/GROUNDING

System Grounding

Area: "01 - Feeders/Risers Building"

COMMON ASSEMBLIES/GROUNDING/GND = #3/0 & 1" CONDUIT - EMT

  • Length: Measure around the main electrical rooms to stacked
  • Count: Total number of electrical rooms

COMMON ASSEMBLIES/GROUNDING/(3) ... x 10' CU CLAD GRD ROD & 4"X12" GND BAR

  • Count: 1

Riser

Area: "Typical - Building All Electrical Riser Rooms"

COMMON ASSEMBLIES/GROUNDING/GND = #3/0 & 1" CONDUIT - EMT

  • Length: 15
  • Count: 1

Telecom Ground Bridge

Use only where shown.

COMMON ASSEMBLIES/GROUNDING/TELE/DATA GND BRIDGE, ..., W/ COVER & (60') #6 THHN GREEN

3. Review