# 2026-05-14 08:19:37
|
|
|
|
## 303 Mariposa Residence Pre-takeoff Confirmation Email Review
|
|
|
|
Consultation with [[josh-ford|Josh]]
|
|
regarding [[pdi-pre-takeoff-confirmation]]
|
|
for [[303-mariposa-residence]].
|
|
|
|
The project being a single family home,
|
|
primary estimator [[jared-defanti]] requested Josh's aid
|
|
with precise wording and takeoff assumptions.
|
|
|
|
### Questions
|
|
|
|
> [!quote] Proposal 2026-05-06
|
|
> _Telecom, Data & Cable TV _
|
|
>
|
|
> 49\. Back boxes and stub ups "As required"
|
|
|
|
Josh confirmed we are to exclude backboxes and stub-ups from takeoff.
|
|
|
|
### Other Direction
|
|
|
|
#### Metal Boxes
|
|
|
|
Highlight 12 AWG minimum, metal boxes;
|
|
add note "please confirm".
|
|
|
|
#### PVC Conduit
|
|
|
|
Confirmed no PVC except secondaries.
|
|
Secondaries PVC40 with PVC80 elbow and stub-up.
|
|
|
|
#### Project Drawing/Detail Callouts
|
|
|
|
Delete section [[conest-pre-takeoff-email-template#Project Drawing/Detail Callouts]]
|
|
since empty.
|
|
|
|
#### Fire Alarm
|
|
|
|
Use `TERMINAL CABINET` not `HEAD END`.
|
|
|
|
Did not specifically discuss with Josh,
|
|
but assuming free-air assemblies for devices
|
|
|
|
#### Lighting Control
|
|
|
|
Confirmed 0-10V/Line voltage dimming per schedule.
|
|
|
|
Use "Low voltage" (rough-in only) assemblies
|
|
|
|
Note "rough-in only" in email.
|
|
|
|
> Josh pointed out dimming receptacles.
|
|
|
|
#### Low Voltage
|
|
|
|
Add new line:
|
|
"Shade Control: System is alternate, do we own rough-in?".
|
|
|
|
#### Other
|
|
|
|
Josh noted that [[conest#ConEst Senior Estimator|seniors]]
|
|
appreciate the new [[pdi-pre-takeoff-confirmation]] process
|
|
because they feel more familiar with the job
|
|
when in [[conest-senior-review]].
|