title: Fixtures Takeoff
|
|
---
|
|
# Fixtures Takeoff
|
|
|
|
This system is only for luminaires and their immediate branch wiring.
|
|
See also [[lighting-controls]] and [[electrical]].
|
|
|
|
## Info
|
|
|
|
## Sequence
|
|
|
|
### 1. Preparation
|
|
|
|
1. Read about the project specifications and construction type
|
|
2. In drawings, locate:
|
|
* Fixture Schedule
|
|
* Reflected Ceiling Plans
|
|
|
|
### 2. Takeoff
|
|
|
|
See [[fixture-designations]].
|
|
|
|
1. Takeoff floor plans in order
|
|
2. Takeoff enlarged drawings
|
|
|
|
### 3. Review
|
|
|
|
1. Garage Homeruns
|
|
2. Luminaire in Amenity Areas
|
|
3. Ensure appropriate breakdowns
|
|
* Site lighting in System "FML - Site Fixtures Material & Labor"
|