## (UNITS)
|
||
|
||
### Important Reminders
|
||
|
||
- AFCI/GFCI on schedule is [not]{.underline} a GFI Receptacle
|
||
|
||
- #12 MC & Romex #12/14
|
||
|
||
### Ex// Schedule
|
||
|
||
{width="1.2916666666666667in"
|
||
height="1.3333333333333333in"}{width="4.158333333333333in"
|
||
height="1.375in"}
|
||
|
||
Friday, February 10, 2023
|
||
|
||
12:12 PM
|
||
|
||
-------------------------------------------------------------------------------------------
|
||
**Circuit **Wire **Amps** **Product** **Produc**t **Amps** **Wire **Circuit
|
||
\#** Size** Size** \#**
|
||
----------- -------- ---------- ------------- ------------- ---------- -------- -----------
|
||
1 14 15 ? 8 3
|
||
|
||
2 12 20 ? 8 4
|
||
-------------------------------------------------------------------------------------------
|
||
|
||
### Washer
|
||
|
||
- *[20 Amp]{.underline}* Duplex Receptacle (Dup Rec)
|
||
|
||
- Rename: Washer - ..........
|
||
|
||
### Studs (Wood or Metal?)
|
||
|
||
- [Blue Beam]{.underline}-\>[Architectural]{.underline}-\>Search
|
||
\"Studs\"
|
||
|
||
- Studs are the Vertical beams in walls.
|
||
|
||
### Unit Load Center
|
||
|
||
- [Distribution]{.underline}
|
||
|
||
### Schedule
|
||
|
||
- \"Combination Arc-Fault Circuit Breaker\" = GFI Decora
|
||
|
||
- Follow \"Wire Size\"
|
||
|
||
### Smoke Detector
|
||
|
||
- [Wire Size:]{.underline} Follow Fixtures
|
||
|
||
- [Outside Unit:]{.underline} Fire Alarm
|
||
|
||
- [In Unit:]{.underline} Electrical
|
||
|
||
> *In Bedroom:* Smoke detector
|
||
>
|
||
> *Not Bedroom:* SD w/ Carbon Monoxide
|
||
>
|
||
> *\*\*Special Case\*\*:* SD w/ Light (For the elderly)
|
||
|
||
### Default Unit
|
||
|
||
- MSDE: 28\" Cat 6
|
||
|
||
- AHU = 30A
|
||
|
||
### MC (Metal Clad)
|
||
|
||
### AHU
|
||
|
||
- When over #6/2 \| #4 Motor Term ID.17.1.6
|
||
|
||
### Receptacles
|
||
|
||
- Switch receptacle = light switch\_\_\_\_Outlet
|
||
|
||
- Bathroom = *[GFI]{.underline}*
|
||
|
||
- Dedicated = 20 Amp Device
|
||
|
||
- If there is /USB in the location w/ GFI Make the USB GFI and the rest
|
||
(Decora)
|
||
|
||
- Island
|
||
|
||
- 1 Slab Deck. Other fill-in (Decora etc.)
|
||
|
||
### Doorbells
|
||
|
||
- Only Take off Once if inside and outside unit
|
||
|
||
### #14 Wires
|
||
|
||
- Only possible in *Romex* Buildings
|
||
|
||
- **Only** use if specifically stated [on Panel/ In notes]{.underline}
|
||
|
||
### Kitchen & Bath
|
||
|
||
- NEVER #14 Wire
|
||
|
||
- Putty Pad
|
||
|
||
- [Unit bathrooms do not always have decora switches]{.underline}
|
||
|
||
### Fixtures
|
||
|
||
- JBOX: Take out Labor
|
||
|
||
- Under Cabinet Fixtures:
|
||
|
||
- Take off twice if they cross the range
|
||
|
||
- [Blue Beam]{.underline}-\>[Architectural]{.underline}-\>[RCP(Reflected
|
||
Ceiling Plan)]{.underline}
|
||
|
||
- Dropped Ceiling: Ex// *Kitchen, Bathroom*
|
||
|
||
- Exposed Ceiling: Always *CONDUIT*
|
||
|
||
- Labor Time:
|
||
|
||
- Most Fixtures: 1 Hour
|
||
|
||
- Fans: 1.5 Hours
|
||
|
||
- Cable Size:
|
||
|
||
- #14 Only in *ROME*X Buildings
|
||
|
||
- Only used in units if specified in notes
|
||
|
||
- #12 More common for most fixtures
|
||
|
||
- Naming Fixtures:
|
||
|
||
- Category - (Fix. Type)Mounting Type - (Con. Type)
|
||
|
||
- Ex// [U - RD-10 - Surface (MC)]{.underline}
|
||
|
||
- \^Units
|
||
|
||
### Telecom (TV)
|
||
|
||
[CAT Type:]{.underline} Project Manuel
|
||
|
||
White Triangle = Data / Voice =
|
||
|
||
Black Triangle = Data / Voice =
|
||
|
||
Half Filled = Data & Voice =
|
||
|
||
*[MSDE]{.underline}* assume *[28]{.underline}*
|
||
|
||
COAXCILE = TV
|
||
|
||
### AHU SW
|
||
|
||
-Common Assemblies\>Units(\_\_)\>General Ass.
|
||
|
||
EWH ...
|
||
|
||
[20A 120- ...]{.mark}
|
||
|
||
AHU UNIT ...
|
||
|
||
### Switches
|
||
|
||
- Three ways can come in *[PAIRS]{.underline}*
|
||
|
||
- Switches that are next to each other are *[GANGED]{.underline}*
|
||
|
||
- GFI Kitchen = Decora Switches
|
||
|
||
- Wire #Size based on Fixture #Size
|
||
|
||
- Pay Attention to Capital Subscripts\*\*
|
||
|
||
- Types:
|
||
|
||
- 1x15A S/P = Single Pull
|
||
|
||
- 1x15A 3W= 3 Way
|
||
|
||
### Draft Proof Box (Mid-Atlantic)
|
||
|
||
- Air Sealing
|
||
|
||
- Item Database \> 6.19.1/6
|
||
|
||
### Distance to ULC (Update over 60')
|
||
|
||
- Dryer
|
||
|
||
- Range
|
||
|
||
- AHU
|
||
|
||
- WH
|
||
|
||
### Fire Alarm
|
||
|
||
- Standard Units (Not Type A/ADA): \"UNIT HORN/STROBE\"
|
||
|
||
- 1 Per Living/Bed Room
|
||
|
||
- ***\"Free Air\"***
|
||
|
||
### Lighting
|
||
|
||
*Labeling fixtures*
|
||
|
||
- Area - Fixture Type (Assembly Type) Mounting
|
||
|
||
- Ex// B-D3(NM)-Surface
|
||
|
||
- BOF - (Schedule)(Non Metallic) Schedule
|
||
|
||
### J-Box for future \_\_\_\_
|
||
|
||
- ZERO OUT LABOR
|
||
|
||
- If J-Box is outside Ask to build
|
||
|
||
Slab box = Ceiling \| ENT Drop = Wall
|
||
|
||
### Combination CO/ Smoke Detector
|
||
|
||
- Taken off as FA only HOTELS
|
||
|
||
- USE FA SMOKE DETECTORS
|
||
|
||
### Floor Box Receptacles
|
||
|
||
- Find which kind in the project manual ([\$Brass]{.underline},
|
||
\$\$Black, or \$\$\$Aluminum)
|
||
|
||
- If no info Brass
|
||
|
||
- Take off telecom Separately
|
||
|
||
- Switched/USB?
|
||
|
||
- Takeoff Normal Floor box
|
||
|
||
- Add a SW/USB instead of a standard Rec.
|
||
|
||
- Material is the same
|
||
|
||
>
|
||
|
||
#4 Motor Term ID.17.1.6
|
||
|
||
|
||
|
||
### HOTEL KEYNOTES
|
||
|
||
- All Rec. 20A
|
||
|
||
- Keypad LV SW Ref. Other Hotels
|
||
|
||
- Accubid \"Ben Test\"
|
||
|
||
- Heating
|
||
|
||
>
|
||
|
||
## (UNITS 2.0)
|
||
|
||
### Unit Load Centers
|
||
|
||
- \"Distribution\"
|
||
|
||
- 3.2
|
||
|
||
- Round up Amps.
|
||
|
||
- Ex// 300A-\>400A
|
||
|
||
- If 150A+ Use \'Distr. Panel\'
|
||
|
||
**Surge Suppression Receptacles**
|
||
|
||
- ID.14.11.16.2
|
||
|
||
- Protects TVs from lighting
|
||
|
||
Wednesday, May 3, 2023
|
||
|
||
9:58 AM
|
||
|
||
|
||
|
||
### J-Box Shade Control 20A Mech. Con.
|
||
|
||
- \"Common Assembly\" 17-\>19-\>1
|
||
|
||
- [Al = Indoor Use]{.mark}
|
||
|
||
- LT Flex = Water Resistant
|
||
|
||
- LT NAM = Water Proof
|
||
|
||
**Un-Unrecognizable Item?**
|
||
|
||
- Create Temporary Assembly to sub
|
||
|
||
### Buday Toilets, Whirlpool Baths, & Mechanical Connections
|
||
|
||
- \"Common Assembly\" 17-\>19-\>1
|
||
|
||
### Home Runs
|
||
|
||
- 1 Per Bed/Living Room
|
||
|
||
- \"Common Assemblies\"
|
||
|
||
- 36.Device Home Runs in Slab Deck
|
||
|
||
- UP-UP
|
||
|
||
- 2.20A Home Run
|
||
|
||
### Kitchen
|
||
|
||
- Range = Countertop Hot Plates
|
||
|
||
- Oven = Cabinet w/ Racks
|
||
|
||
>
|
||
|
||
**PDI Best Practices**
|
||
|
||
- #12 when using MC
|
||
|
||
- Decora in Kitchen backsplash when GFI is used
|
||
|
||
**Shade Control**
|
||
|
||
- Empty 3/4\" Conduit
|
||
|
||
### High Lows
|
||
|
||
- Make sure to also take off both Recs.
|
||
|
||
- \"Common Assemblies\"
|
||
|
||
- 27.Telecom Systems
|
||
|
||
- 2.Unit Telecom Assemblies
|
||
|
||
- SCROLL DOWN
|
||
|
||
- 45.High-Low - LV Scoop 1 1/2\"...
|
||
|
||
### Substituting Wire Size on Range
|
||
|
||
1. Ex// Range #8 -\> Range #6
|
||
|
||
2. Open Range #8
|
||
|
||
3. Copy #8 Wire
|
||
|
||
4. Paste in \"DB Find\"
|
||
|
||
5. Add #6 wire
|
||
|
||
6. Check \"Base\" & \"Quantity\"
|
||
|
||
7. Delete #8 Wire
|
||
|
||
### \^\^\^ If this doesn\'t work
|
||
|
||
1. Ex// EWH #8 -\> #6
|
||
|
||
2. Use AHU #6
|
||
|
||
3. Replace Name to EWH
|
||
|
||
{width="0.4583333333333333in"
|
||
height="1.2083333333333333in"}
|
||
|
||
### USBs
|
||
|
||
- If Specifically mentioned but NSOP **[Include]{.underline}**
|
||
|
||
- Make sure it is Single or Duplex
|
||
|
||
- \$\$\$ Deep Box
|
||
|
||
### ROMEX UNITS
|
||
|
||
- [Outside Lights]{.underline} still NM
|
||
|
||
- #14 only allowed in Units (Power and Lighting)
|
||
|
||
**[NM Luminaire cable]{.underline}**:
|
||
|
||
A-Bid - *Item Database* - 3.7.2
|
||
|
||
|
||
|
||
Can\'t run #14 on 20A Circuit
|
||
|
||
\*\*\*KTICHEN AND BATH\*\*\*
|
||
|
||
It may be #14 if PDI Owns the job and the panel calls for 15A on these
|
||
circuits
|
||
|
||
|
||
|
||
**[Romex Kitchen Island]{.underline}** - No Slab Deck Rec. Lvls2+
|
||
|
||
### MIXED UNITS (NM & MC)
|
||
|
||
- Create Phases
|
||
|
||
- \"UNITS NM\"
|
||
|
||
- \"UNITS MC\"
|
||
|
||
{width="5.383333333333334in"
|
||
height="2.8666666666666667in"}
|
||
|
||
### Unit Load Centers 150+
|
||
|
||
- \"Distribution\"
|
||
|
||
- Build as Dist. Panel
|
||
|
||
- 4.2.
|
||
|
||
**Microduct \>\>\>\>\>**
|
||
|
||
### Mid Atlantic Jobs
|
||
|
||
- Draft Proof Box=Air Sealing
|
||
|
||
- \^\^\^\^\^\^\^\^
|
||
|
||
-MC Units= CA.11.4.38
|
||
|
||
> Delete Items 1-3
|
||
>
|
||
> Decide Gang for vapor and box
|
||
>
|
||
> (1 or 2)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
## AHU
|
||
|
||
## (UNITS 3.0)
|
||
|
||
{width="4.95in" height="4.35in"}
|
||
|
||
Friday, April 19, 2024
|
||
|
||
8:08 AM
|
||
|
||
2 is the same as 3,4,5,6
|
||
|
||
- Just specifically includes the SW
|
||
|
||
### Screwless Decora Plates
|
||
|
||
- More \$\$\$
|
||
|
||
- Put in project OneNote
|
||
|
||
- Notify Senior
|
||
|
||
- Mass Sub at the end of Takeoff
|
||
|
||
|
||
|
||
### Air Sealing + Leed Silver
|
||
|
||
- In Units (Normally cold locations)
|
||
|
||
- Purpose: Protect conductivity for devices that get cold and could trip
|
||
|
||
- Shown on Detail of Outlets
|
||
|
||
- CA.Units.General Assemblies. 30 Misc. Assemblies
|
||
|
||
- ID.6.19.(1-4)Metal Stud (6-9) Wood Stud
|
||
|
||
- Delete Everything but Vapor Romain Box
|
||
|
||
- Only Do it for walls w/ Windows
|
||
|
||
- Get Count for Devices on Walls w/ Windows
|
||
|
||
- Add takeoff w/ \# Devices on Walls w/ Windows
|
||
|
||
|
||
|
||
### 1\" Conduit MSDE to IDF
|
||
|
||
- Is this included in the Unit Takeoff? YES
|
||
|
||
- CA.26.2.50-52
|
||
|
||
>
|
||
|
||
### OVEN XFMR
|
||
|
||
- Window: Ritz Woodlands
|
||
|
||
- Heating Assembly
|
||
|
||
- Notify Senior for extra labor hours
|
||
|
||
### Dimmable Receptacle
|
||
|
||
- Taken off as Sw Rec
|
||
|
||
|
||
|
||
### Bathroom Fix. Connected to GFI Rec.
|
||
|
||
- Does this effect our normal takeoff? NO
|
||
|
||
- Takeoff everything the same
|
||
|
||
### Fridge ATS
|
||
|
||
- If storm comes and you lose power your food doesn\'t go bad
|
||
|
||
### Baseboard Heater
|
||
|
||
- Heating \" Overlake Square \"
|
||
|
||
|
||
|
||
### HEATING
|
||
|
||
Accubid Section: **Heating**
|
||
|
||
- First Item Place Holder
|
||
|
||
General Switches:
|
||
|
||
- S/P -\> (S/P)Dimmer/Var Fan
|
||
|
||
- 3-Way -\> 3-Way
|
||
|
||
Locations:
|
||
|
||
- **VAR FAN SW**
|
||
|
||
- ID.14.6.20.1
|
||
|
||
- **6G SW**
|
||
|
||
- DB find on \"Concentric Box\"
|
||
|
||
- **3W/4W**
|
||
|
||
- ID.14.3.1/2
|
||
|
||
## (CUSTOM SWs)
|
||
|
||
### AHU SW
|
||
|
||
-CA\>Units(\_\_)\>General Ass.
|
||
|
||
EWH ...
|
||
|
||
[20A 120- ...]{.mark}
|
||
|
||
AHU UNIT ...
|
||
|
||
**Key SWs**
|
||
|
||
- Accubid
|
||
|
||
- ID.14.27.2.18
|
||
|
||
**Surge Suppression Receptacles**
|
||
|
||
- ID.14.11.16.2
|
||
|
||
- Protects TVs from lighting
|
||
|
||
Monday, April 17, 2023
|
||
|
||
8:26 AM
|
||
|
||
|
||
|
||
### Var. Fan SW
|
||
|
||
### Mech. SW\'s
|
||
|
||
>
|
||
>
|
||
> Accubid Section: **Temp. Item**
|
||
|
||
- First Item Place Holder
|
||
|
||
>
|
||
>
|
||
> Description:
|
||
|
||
- [Labor Hours]{.underline} = .35
|
||
|
||
<!-- -->
|
||
|
||
- [PDI Sort Codes]{.underline} = 300 (Trim/Devices)
|
||
|
||
<!-- -->
|
||
|
||
- [Material Price]{.underline} = Google Part \# (Find Price In middle)
|
||
|
||
>
|
||
>
|
||
> Deleted Items:
|
||
>
|
||
> \$p = Delete [1.Cat Cable]{.underline}, [2.Mod Outlet]{.underline}
|
||
|
||
**Pilot Light SWs**
|
||
|
||
- ID.14.3.3
|
||
|
||
{width="5.816666666666666in" height="2.075in"}
|
||
|
||
5G/6G Plates
|
||
|
||
ID.14.1.1.5/6
|
||
|
||
**Wifi SWs**
|
||
|
||
- Taken off as Dimmer
|
||
|
||
>
|
||
|
||
{width="5.241666666666666in"
|
||
height="3.9583333333333335in"}
|
||
|
||
**Stud Protection Plt \-\-\-\--\>**
|
||
|
||
- This is the difference between MC Metal Stood and MC Wood Stud
|
||
|
||
- Use when Occ Sensor SW MC Metal stud to MC wood stud
|
||
|
||
- ID.12.7.9.1
|
||
|
||
### Door Contact SW
|
||
|
||
-CA\>Units\>SW Toggle\>7. Door Contact SW
|
||
|
||
### Dimmer SW Location
|
||
|
||
-ID.14.5.10.1-5
|
||
|
||
**VAR FAN SW**
|
||
|
||
- Google the part number on the fixture schedule to see if the fan comes
|
||
with a remote
|
||
|
||
### Timer Switch
|
||
|
||
- Common Assemblies
|
||
|
||
<!-- -->
|
||
|
||
- Misc Assemblies
|
||
|
||
<!-- -->
|
||
|
||
- EPO Button
|
||
|
||
- Pick between EMT or PVC
|
||
|
||
- Click into assembly and add
|
||
|
||
- [ID: 14\>3\>7\>6]{.underline}
|
||
|
||
|
||
|
||
**SINGLE REC MUST MATCH BREAKER SIZE**
|
||
|
||
- If you have a recessed clock rec, must match the breaker size even if
|
||
you are running 15A rec on a 20A circuit
|
||
|
||
**Keypad SWs**
|
||
|
||
- Accubid \"The Dunes\"
|
||
|
||
- Heating
|
||
|
||
|
||
|
||
{width="8.916666666666666in"
|
||
height="4.291666666666667in"}{width="7.1in"
|
||
height="5.891666666666667in"}
|
||
|
||
|
||
|
||
## (CUSTOM SWs 2.0)
|
||
|
||
### Backlit SW
|
||
|
||
- ITEM CODE MAKE TEMP ASSEMBLY
|
||
|
||
- Or
|
||
|
||
Wednesday, July 24, 2024
|
||
|
||
9:41 AM
|
||
|
||
|
||
|
||
{width="7.1in" height="5.891666666666667in"}
|
||
|
||
Description: Name of Item
|
||
|
||
Material Price: Google Catalog \# -\> Insert Price
|
||
|
||
Labor Hours: \^
|
||
|
||
Manufacture name:
|
||
|
||
Catalog #:
|
||
|
||
|
||
|
||
## (Custom Rec.)
|
||
|
||
Wednesday, January 31, 2024
|
||
|
||
3:18 PM
|
||
|
||
|
||
|
||
**BALCONY PEDESTAL RECECPICLES**
|
||
|
||
- If adding pedestal for receptacles, use WP rec and remove box and
|
||
plate then add the guard and post WP pedestal
|
||
|
||
- ID. 38.2.5
|
||
|
||
**Blank face Future rec. (No Wire)**
|
||
|
||
- Take normal Rec. Delete everything besides box and stud and add blank
|
||
plate
|
||
|
||
- ID. 38.2.5
|
||
|
||
{width="4.3in" height="1.7166666666666666in"}
|
||
|
||
**CONTROLLED RECS.**
|
||
|
||
{width="5.0in" height="0.3333333333333333in"}
|
||
|
||
T-24 Receptacles
|
||
|
||
- Occ Sensor Based
|
||
|
||
- Each room needs an occ sensor and power pack
|
||
|
||
- Put a power pack per every 3 devices
|
||
|
||
- Take off the rec as a switched rec
|
||
|
||
- For Occ Sensors use
|
||
|
||
{width="5.0in" height="0.35in"}
|
||
|
||
- CA.13.24.48
|
||
|
||
- For any additional power packs needed use
|
||
|
||
{width="5.0in" height="0.6166666666666667in"}
|
||
|
||
- CA.13.24.43
|
||
|
||
|
||
|
||
{width="5.0in" height="4.541666666666667in"}
|
||
|
||
### BaseBoard Heaters
|
||
|
||
CA.15.12.#Wire Size
|
||
|
||
Delete everything but these
|
||
|
||
{width="8.216666666666667in"
|
||
height="3.0083333333333333in"}
|
||
|
||
\+
|
||
|
||
|
||
|
||
Regular MC/NM Recepticle
|
||
|
||
{width="8.4in" height="2.2416666666666667in"}
|
||
|
||
|
||
|
||
IF ADDING PEDESTAL
|
||
|
||
- The PEDOC assembly covers the box
|
||
|
||
- Just need the name, pedestal, and then the homerun
|
||
|
||
- If QUAD make fct 1 of name 2
|
||
|
||
- Add pedestal
|
||
|
||
- Add rec you need
|
||
|
||
- Delete out any box materials
|
||
|
||
- Aka keep the wiring and conduit
|
||
|
||
- See USB Quad Rec example in Four Seasons LV
|
||
|
||
|
||
|
||
|
||
|
||
## (LIGHTING)
|
||
|
||
{width="6.908333333333333in" height="0.8in"}
|
||
|
||
BOH=/=Decora
|
||
|
||
Monday, August 28, 2023
|
||
|
||
7:31 AM
|
||
|
||
### Fixtures
|
||
|
||
- [Blue Beam]{.underline}-\>[Architectural]{.underline}-\>[RCP(Reflected
|
||
Ceiling Plan)]{.underline}
|
||
|
||
- Dropped Ceiling: MC/NM Pending building type
|
||
|
||
- Exposed Ceiling: *Conduit (PVC, EMT)*
|
||
|
||
- Cable Size:
|
||
|
||
- #12 More common for most fixtures
|
||
|
||
- #10 for Exterior and Garage fixtures
|
||
|
||
- LV Cable in Amenity and Dimming lights
|
||
|
||
- Wall Mounted Fixtures:
|
||
|
||
- Concrete: Wall (PVC) W/ ENT DROP
|
||
|
||
- Non-Concrete: (MC/NM) \*\*Pending Building Type
|
||
|
||
- J-Box: (J-Box for future fixture)
|
||
|
||
- TAKE OUT LABOR HOURS
|
||
|
||
### Elevators & Stairs
|
||
|
||
[Elevators:]{.underline} (BOH/Unless-Garage)
|
||
|
||
[Stairs:]{.underline} (Stairwell)
|
||
|
||
[Both:]{.underline} PVC or EMT
|
||
|
||
### Fixture Schedules
|
||
|
||
- (One can always check to see what bid did)
|
||
|
||
- BY MOUNTING TYPE UNLESS OTHERWISE STATED
|
||
|
||
- By mounting type
|
||
|
||
- EX// B - Surface(MC)
|
||
|
||
**PC (Photocell)**
|
||
|
||
Item Database -\> 15.Control Devices & Acc -\>9. Time Clocks &
|
||
Photocells
|
||
|
||
|
||
|
||
## Façade Lights \$\$\$
|
||
|
||
- Lights located outside of the building
|
||
|
||
- On the side going up
|
||
|
||
- Create New Phase \"Façade\"
|
||
|
||
- #10 wire
|
||
|
||
**Festoon LIGHTS**
|
||
|
||
- FIXTURE LABOR = 2hours
|
||
|
||
8. Festoon & Roof Assemblies
|
||
|
||
1. Fest. Cable
|
||
|
||
- Length = Length of Light
|
||
|
||
- (Backout Right Click Modify)
|
||
|
||
- (1. PVC/ENT Ass. OR 2. EMT)
|
||
|
||
12. 3/4\" PVC W/ 3#10 Box/Tile Ring
|
||
|
||
1. Length 50\'
|
||
|
||
### LV SW/Push Button
|
||
|
||
- Do more Research
|
||
|
||
{width="3.2916666666666665in" height="0.3in"}
|
||
|
||
|
||
|
||
## How to Delete Fixtures
|
||
|
||
- Click Show Deleted Takeoffs
|
||
|
||
- Select the fixture you want removed
|
||
|
||
- Right click -\> substitute designations
|
||
|
||
[FAA LIGHTS]{.underline}
|
||
|
||
- Create a Fixture: 1Hr - Festoon & Roof Assemblies \> Aircraft Warning,
|
||
3/4\" Conduit GRC/PVC 2#10, 1#10G
|
||
|
||
**Overlay for Lighting Typicals**
|
||
|
||
1. Click the \'Drawing\' Tab
|
||
|
||
2. \'Compare to New Drawing\'
|
||
|
||
3. Select correct Drawing
|
||
|
||
4. BLUE IS NEW (Line up the stairs)
|
||
|
||
5. Click different drawing to leave comparison
|
||
|
||
|
||
|
||
**Copy/Move TakeOffs in Live count**
|
||
|
||
1. Select multiple button
|
||
|
||
2. Drag over or select specific items taken off
|
||
|
||
3. Right click -\> \'Drawing Comparison\' -\> \'Move/Copy\'
|
||
|
||
|
||
|
||
**ANY LIGHTING OUTSIDE**
|
||
|
||
- PVC where allowed, #10
|
||
|
||
- MAY NEED COURTYARD LIGHTING
|
||
|
||
**Integral Vs. Remote**
|
||
|
||
- FIXTURE LABOR = 2hours
|
||
|
||
- Festoon Roof
|
||
|
||
1. Integral - \"Power Directly to fixture\"
|
||
|
||
2. Remote - \"Power to Controller\"
|
||
|
||
[Toe Kick lights]{.underline}
|
||
|
||
- Surface (PVC)
|
||
|
||
|
||
|
||
## Creating fixtures
|
||
|
||
- Always look up lights that say \"Recessed\" to ensure the mounting
|
||
type
|
||
|
||
- Organize fixtures by Phase RIGHT AWAY
|
||
|
||
**Lamp Lighting**
|
||
|
||
- Floor and RCP plans for a job
|
||
|
||
- How does one takeoff table mounted lamps?
|
||
|
||
- DON'T TAKEOFF unless it is shown physically in the ground.
|
||
|
||
- Would be shown as floor box on electrical
|
||
|
||
|
||
|
||
## ROMEX
|
||
|
||
- Check the life safety drawings for large rooms. If you have a room
|
||
with an occupancy over 100 people, then that building becomes MC not
|
||
Romex.
|
||
|
||
- If walls don't separate rooms their Max occ is added
|
||
|
||
- Ex// 25+75=100 MC
|
||
|
||
<!-- -->
|
||
|
||
- Also, Fire Rated walls = MC
|
||
|
||
- Stairwells and outside Fixtures still NM
|
||
|
||
>
|
||
|
||
### Amenity
|
||
|
||
> LUMINER **CABLE** FIXTURES (DIMMING - Low Voltage)
|
||
|
||
- NM - Add in after fact
|
||
|
||
- A-Bid - **Item Database** - 3.7.2
|
||
|
||
- PVC & EMT - Do not have to add in (CONDUIT)
|
||
|
||
- MC - Exists in Accubid
|
||
|
||
>
|
||
>
|
||
> FLOOD LIGHT = STEP LIGHT
|
||
>
|
||
>
|
||
|
||
## (LIGHTING 2.0)
|
||
|
||
|
||
|
||
## Lighting ROMEX/MC?-\>
|
||
|
||
- Structural/ Architectural
|
||
|
||
- Elevations
|
||
|
||
> Check floor type
|
||
|
||
## Building Construction Type
|
||
|
||
- Architectural
|
||
|
||
- Life safety
|
||
|
||
- Code summary
|
||
|
||
- OneNote Con. Type
|
||
|
||
{width="2.183333333333333in" height="2.075in"}
|
||
|
||
Wednesday, May 24, 2023
|
||
|
||
8:23 AM
|
||
|
||
|
||
|
||
## OC/VC SENSORS
|
||
|
||
- If there is a key note/power needs to be provided. It is a **Low
|
||
Voltage System FBO**
|
||
|
||
- Ceiling VC = Ceiling OC
|
||
|
||
## Low Voltage System (FBO)
|
||
|
||
- 0-10V = FBO = Dimmable = Always Decora
|
||
|
||
- [[Lumineers Cable]{.underline} with any **Lighting** near by]{.mark}
|
||
|
||
- CA.13.25
|
||
|
||
- Corridors & Amenity = 50\'
|
||
|
||
- Everything else = 100\'
|
||
|
||
{width="4.191666666666666in"
|
||
height="1.3333333333333333in"}
|
||
|
||
## J-Boxes
|
||
|
||
- Remove the Labor hours
|
||
|
||
>
|
||
|
||
- To Add Cover plate (J-Boxes)
|
||
|
||
- Item Database
|
||
|
||
- Boxes and Cabinets
|
||
|
||
- Boxes and Covers - Steel - 4\" Square
|
||
|
||
- Covers - 4\" Square
|
||
|
||
- 4\" SQ Blank Cover
|
||
|
||
>
|
||
|
||
## Retail (Dark Cold Shell)
|
||
|
||
- Always Surface (MC)
|
||
|
||
- Too expensive to replace PVC
|
||
|
||
{width="2.933333333333333in" height="1.35in"}
|
||
|
||
## Site Lighting
|
||
|
||
- CHANGE [SYSTEM]{.underline} TO **\"FML - Site Fixtures Material &
|
||
Labor**\"
|
||
|
||
- Continuous handrails -\> 75\'=1 count
|
||
|
||
## Site Poles
|
||
|
||
- Measure Distance from panel Find avg.
|
||
|
||
- Labor hours = \# heads (Min 1.5)
|
||
|
||
- Site Pole Assemblies
|
||
|
||
- Conduit & Wire: #10
|
||
|
||
- Pole Assm: Aluminum
|
||
|
||
- Delete Street Fix.
|
||
|
||
- Pole Bases: We don't own
|
||
|
||
- Grounding: We don\'t own
|
||
|
||
## PHOTOCELLS Photo Cell
|
||
|
||
- Photocells are located in Item Database under Control Devices &
|
||
Accessories
|
||
|
||
- ID.15.9
|
||
|
||
- \$\$\$ Cheaper to have them in the fixture then to buy separately
|
||
|
||
|
||
|
||
**[Fixture Labor]{.underline}**
|
||
|
||
- Basic Fixtures (Surface, Recessed, etc.) 1 Hour
|
||
|
||
- Fans & Site Poles 1.5 Hours
|
||
|
||
- Amenity -
|
||
|
||
- Fixtures w/ ceiling hieght over 15\' - 2 Hours
|
||
|
||
- Pendants and chandeliers - look up fixture and size to determine
|
||
fixture labor (1 - 14 hr.)
|
||
|
||
- Strip lights
|
||
|
||
- Labor hours = (Length in \') \* (.083) \[Rounded to the nearest
|
||
whole number\]
|
||
|
||
- Site and Courtyard
|
||
|
||
- Path Light, Step Light, Bollard, up light, & misc. fixtures - 1 hr.
|
||
|
||
<!-- -->
|
||
|
||
- Festoon Lights - 2hr.
|
||
|
||
>
|
||
|
||
## Façade Lighting
|
||
|
||
- When tape lights are wrapped around the building add a Homerun every
|
||
75\'
|
||
|
||
|
||
|
||
{width="1.2416666666666667in"
|
||
height="1.4333333333333333in"}
|
||
|
||
**[Labor]{.underline}**
|
||
|
||
- Path Light, Step Light, Bollard, up light, & misc. fixtures - 1 hr.
|
||
|
||
<!-- -->
|
||
|
||
- Fans - 1.5 hr.
|
||
|
||
<!-- -->
|
||
|
||
- Site Poles - 1.5 hr.
|
||
|
||
<!-- -->
|
||
|
||
- Festoon Lights - 2hr.
|
||
|
||
|
||
|
||
## (GARAGE LIGHTING)
|
||
|
||
Tuesday, February 21, 2023
|
||
|
||
7:18 AM
|
||
|
||
[Anything in Garage Always #10 Wire (ENT)]{.underline}
|
||
|
||
- Because of voltage Drop
|
||
|
||
- **Garage Lighting**
|
||
|
||
- Never Recessed
|
||
|
||
- Because you can\'t do it in concrete
|
||
|
||
- Garage ceiling typically concrete
|
||
|
||
Garden Style Garage
|
||
|
||
> -Built different
|
||
|
||
### Garage Home Runs\*\*
|
||
|
||
- Runs PVC from electrical room to nearest fixture
|
||
|
||
- COMMON ASSEMBLIES 40\>Up-Up\>50\'-4
|
||
|
||
- Min. 30A
|
||
|
||
HD/HR Garage
|
||
|
||
> -Always #10 Wire
|
||
|
||
|
||
|
||
|
||
|
||
## ENT/PVC
|
||
|
||
- think of ENT as anything where you can drive your car through and then
|
||
PVC as the BOH kind of lights in a garage
|
||
|
||
HomeRun Garage
|
||
|
||
> -Conduit from Panel to Fixtures, Receptacles, and Switches
|
||
>
|
||
> -Taken Off as Electrical
|
||
>
|
||
> -Not Selected in LiveCount
|
||
>
|
||
> -1 HR for every 3 Circuits
|
||
|
||
## I-Beam Garage
|
||
|
||
- W/ Trod only w/ I-Beam (Check elevation)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
{width="5.708333333333333in"
|
||
height="2.0083333333333333in"}
|
||
|
||
## Precast Garages
|
||
|
||
- Concrete is pre-cast and laid on top
|
||
|
||
- Confirm with Team members if they want to run
|
||
|
||
- EMT(Outside of the Concrete)
|
||
|
||
- ENT (In slab, Cannot be exposed)
|
||
|
||
|
||
|
||
|
||
|
||
### Key Documents
|
||
|
||
- Electrical
|
||
|
||
- Project Manuel
|
||
|
||
- Fire Alarm Drawings (If app.)
|
||
|
||
- Proposal
|
||
|
||
### Key Terms & Definitions
|
||
|
||
- OH=Overhead=Vertical Feeders
|
||
|
||
- UG=Underground=Horizontal Feeders
|
||
|
||
- FAT = Fire Alarm Terminal
|
||
|
||
- FACP = Fire Alarm Control Panel
|
||
|
||
## (FIRE ALARM)
|
||
|
||
### General Understanding
|
||
|
||
- Fire Alarm \> Terminal \> Cabinet
|
||
|
||
- Electrical Room = Where Things go vertical/ \"Overhead\"
|
||
|
||
Thursday, May 4, 2023
|
||
|
||
2:46 PM
|
||
|
||
|
||
|
||
**Fire Alarm & DAS 3-31**
|
||
|
||
- Devices
|
||
|
||
- General
|
||
|
||
- Head End (Building Type)
|
||
|
||
- Riser (Conduit)
|
||
|
||
- 2Way
|
||
|
||
- DAS
|
||
|
||
{width="4.7in" height="2.2in"}
|
||
|
||
### Key Steps
|
||
|
||
1. Check to see if we own
|
||
|
||
- FA
|
||
|
||
- DAS
|
||
|
||
- 2-Way
|
||
|
||
2. Conduit Requirements?
|
||
|
||
- Conduit Spec: (PVC UG) (EMT OH)
|
||
|
||
3. Find Fire Alarm Control Room
|
||
|
||
- Can\'t find one \"Main Elec. Room\"
|
||
|
||
4. Routing
|
||
|
||
- \"Furthest Corner to Furthest Corner\"
|
||
|
||
i. Room to Stairwells
|
||
|
||
1. Always 1\'
|
||
|
||
- \# Shafts = \# of Adders
|
||
|
||
- G Restarts Measurement
|
||
|
||
5. Head in
|
||
|
||
6. Stairwells = Always 1\'
|
||
|
||
7. Elevator Control Panel
|
||
|
||
- On Roof
|
||
|
||
- Adder \# = \# of floors
|
||
|
||
8. Terminal Cabinet (OneNote)
|
||
|
||
- (2)2\" = HR
|
||
|
||
9. Ex// Typical: \"East Tower FA Riser\"
|
||
|
||
>
|
||
|
||
{width="3.25in" height="1.9666666666666666in"}
|
||
|
||
**Riser**
|
||
|
||
- Enunciator (Remote Cereal)
|
||
|
||
- Placement
|
||
|
||
- \- At welcome Center
|
||
|
||
{width="2.6333333333333333in"
|
||
height="0.775in"}{width="1.6666666666666667in"
|
||
height="0.5333333333333333in"}
|
||
|
||
- **Relay Control**
|
||
|
||
- FSD symbol
|
||
|
||
- Take off both FA and Electrical
|
||
|
||
- Misc Assemblies
|
||
|
||
- 5 is corridor
|
||
|
||
- 7 is garage
|
||
|
||
**[WOOD Frame Buildings]{.mark}**
|
||
|
||
- [FREE AIR Devices]{.mark}
|
||
|
||
|
||
|
||
## (FA DEVICES)
|
||
|
||
Thursday, May 4, 2023
|
||
|
||
9:31 AM
|
||
|
||
|
||
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| **Device** | **Common** | **Assembly** | **Location** |
|
||
| | | | |
|
||
| | **Images** | | |
|
||
+=================+:=====================================================:+==============+:===================:+
|
||
| Pull Station | > | PULL STATION | CA.28. INITIATING |
|
||
| | > | | DEVICES |
|
||
| | > {width="0.5333333333333333in" | | |
|
||
| | > height="0.35in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Smoke Detector | | SMOKE | CA.28. INITIATING |
|
||
| | | DETECTOR W/ | DEVICES |
|
||
| | > {width="0.4083333333333333in" | BASE | |
|
||
| | > height="0.38333333333333336in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Heat Detector | | INDOOR HEAT | CA.28. INITIATING |
|
||
| | | DETECTOR | DEVICES |
|
||
| | > {width="0.4083333333333333in" | | |
|
||
| | > height="0.4in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Duct Detector | > | DUCT | CA.28. INITIATING |
|
||
| | > | DETECTOR | DEVICES |
|
||
| | > {width="0.3333333333333333in" | | |
|
||
| | > height="0.45in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Mini Monitoring | | ADDRESSABLE | CA.28. INITIATING |
|
||
| Module | | MINI-MONITOR | DEVICES |
|
||
| | | MODULE | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Monitoring | > | ADDRESSABLE | CA.28. INITIATING |
|
||
| Module | > | MONITOR | DEVICES |
|
||
| | > {width="0.525in" | MODULE | |
|
||
| | > height="0.375in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Dual Monitor | | ADDRESSABLE | CA.28. INITIATING |
|
||
| Module | | DUAL MONITOR | DEVICES |
|
||
| | | MODULE | |
|
||
| | | | |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Fire/Smoke | > | FSD | CA.32.4-7 |
|
||
| Damper (FSD) | > | | Electrical |
|
||
| | > {width="0.5416666666666666in" | | |
|
||
| | > height="0.3in"} | | |
|
||
| | > | ADDRESSABLE | |
|
||
| Control Module | > | OUTPUT RELAY | CA.28. INITIATING |
|
||
| | > | CONTROL | DEVICES - Fire |
|
||
| | > {width="0.5833333333333334in" | MODULE | Alarm |
|
||
| | > height="0.2833333333333333in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Control Relay | > | ADDRESSABLE | CA.28. INITIATING |
|
||
| | > | OUTPUT RELAY | DEVICES |
|
||
| | > {width="0.375in" | CONTROL | |
|
||
| | > height="0.325in"} | MODULE | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Stairwell | {width="0.36666666666666664in" | Addressable | CA.28.6.19 |
|
||
| Assembly | height="0.30833333333333335in"} | Dual Monitor | |
|
||
| | | Module - | |
|
||
| | | Flow | |
|
||
| | | Tamper - PVC | |
|
||
| Flow/Tamper | | | |
|
||
| Switch | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Strobe light - | > | INDOOR | CA.28. INDICATING |
|
||
| Wall Mounted | > | STROBE (ENT | DEVICES |
|
||
| | > {width="0.4666666666666667in" | DROP?) | |
|
||
| | > height="0.4666666666666667in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Strobe light - | > | INDOOR | CA.28. INDICATING |
|
||
| Ceiling Mounted | > | STROBE | DEVICES |
|
||
| | > {width="0.55in" | (Ceiling) | |
|
||
| | > height="0.4583333333333333in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Speaker | > | INDOOR | CA.28. INDICATING |
|
||
| Strobe/Audio | > | SPEAKER | DEVICES |
|
||
| Device - | > {width="0.4083333333333333in" | STROBE | |
|
||
| Ceiling Mounted | > height="0.7in"} | (Ceiling) | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Speaker | > | INDOOR | CA.28. INDICATING |
|
||
| Strobe/Audio | > | SPEAKER | DEVICES |
|
||
| Device - Wall | > {width="0.5666666666666667in" | STROBE (ENT | |
|
||
| Mounted | > height="0.7916666666666666in"} | DROP?) | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Weather Proof | > | WEATHERPROOF | CA.28. INDICATING |
|
||
| Speaker | > | SPEAKER | DEVICES |
|
||
| Strobe/Audio | > {width="0.3416666666666667in" | STROBE | |
|
||
| Device - | > height="0.5916666666666667in"} | | |
|
||
| Ceiling Mounted | > | | |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | > {width="1.2583333333333333in" | | |
|
||
| | > height="0.125in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Weatherproof | > | WEATHERPROOF | CA.28. INDICATING |
|
||
| Speaker | > | SPEAKER | DEVICES |
|
||
| Strobe/Audio | > {width="0.4666666666666667in" | STROBE (ENT | |
|
||
| Device - Wall | > height="0.6583333333333333in"} | DROP?) | |
|
||
| Mounted | > | | |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | > {width="1.2583333333333333in" | | |
|
||
| | > height="0.125in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Electromagnetic | > | | |
|
||
| Door Holder | > | | |
|
||
| | > {width="0.45in" | MAGNETIC | CA.28. INDICATING |
|
||
| | > height="0.16666666666666666in"} | DOOR HOLDER | DEVICES |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | > | | |
|
||
| | > {width="0.525in" | | CA.32.19.material. |
|
||
| | > height="0.3333333333333333in"} | | Length based |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
| Fire Tele | > | FIRE FIGHTER | CA.28.Communicating |
|
||
| Outlet | > | JACKS | Devices |
|
||
| | > {width="0.5in" | | |
|
||
| | > height="0.375in"} | | |
|
||
| | > | | |
|
||
| Fire Jack | > | | |
|
||
| | > | | |
|
||
| | > {width="0.525in" | | |
|
||
| | > height="0.35in"} | | |
|
||
| | | | |
|
||
| | | | |
|
||
+-----------------+-------------------------------------------------------+--------------+---------------------+
|
||
|
||
{width="4.391666666666667in"
|
||
height="3.2083333333333335in"}{width="0.3416666666666667in"
|
||
height="0.3333333333333333in"}
|
||
|
||
|
||
|
||
{width="0.35in" height="0.2916666666666667in"}
|
||
|
||
|
||
|
||
\*Can be shown on [Fire Alarm]{.underline} and/or
|
||
[Electrical]{.underline} and/or [Mechanical]{.underline} plans
|
||
|
||
|
||
|
||
Coordinate that they are properly taken off once
|
||
|
||
|
||
|
||
\*Can be shown with a Circuit #. Coordinate with Estimator taking off
|
||
the electrical
|
||
|
||
|
||
|
||
## (FA RISER 1.0)
|
||
|
||
**RISER**
|
||
|
||
**GARDEN STYLE NO ROUTING**
|
||
|
||
Monday, December 30, 2024
|
||
|
||
11:56 AM
|
||
|
||
{width="3.8833333333333333in" height="2.1in"}
|
||
|
||
### Locate these areas on the plans if Applicable (Place Count)
|
||
|
||
1. FCC = Fire Command Center
|
||
|
||
a. Put in **Head End** (CA.29.25. \_\_) Assembly
|
||
|
||
2. Generator Room (CA.29.22.**2**)
|
||
|
||
3. Fire Pump Room (CA.29.22.**4**)
|
||
|
||
4. Elevator Control Room (CA.29.22.**6**)
|
||
|
||
5. Elevator Shafts (CA.29.22.**8**)
|
||
|
||
### Conduit Runs
|
||
|
||
> FACR TO ELEV SHAFT 1 ½" (CA.28.22.10/11)
|
||
|
||
- Measure from the furthest end of FACR to the furthest end of the Shaft
|
||
to find length
|
||
|
||
- This is for the elevator pit, input adders to run to the pit usually 1
|
||
adder length 15.
|
||
|
||
- \"Enough conduit to reach the bottom of elevator shaft\"
|
||
|
||
>
|
||
>
|
||
> FACR/FCC TO ELEV CONTROL ROOM (CA.28.22.13/14)
|
||
|
||
- Use the count taken off before to locate the ECR.
|
||
|
||
- Measure the Horizontal and Vertical Distance from the FACR to the ECR.
|
||
|
||
- Use Typicals for the vertical riser. (Ex// 10' per floor)
|
||
|
||
>
|
||
>
|
||
> FACR TO STAIRWELLS 1" PVC (CA.28.22.17)
|
||
|
||
- Measure from the furthest end of FACR to the furthest end of the
|
||
stairwell to find length
|
||
|
||
- This is for the Flow/Tamper modules in the stairwells
|
||
|
||
> TERMINAL CABINETS (2) 2\" EMT/PVC (CA.28.26. \_\_)
|
||
|
||
- Measure from the Fire Command room to all electrical rooms
|
||
|
||
- Horizontal and vertical components
|
||
|
||
- Use Typicals for the vertical riser. (Use 10' Riser assembly)
|
||
|
||
>
|
||
>
|
||
> ANNUNCIATORS (CA.28.27.2/3)
|
||
|
||
- Usually at the entrance, if needed to locate, search for RAN, FAA, or
|
||
FAAP (Fire Alarm Annunciator, Fire Alarm Annunciator Panel)
|
||
|
||
- Use Remote Serial Annunciator, LCD Display - PVC
|
||
|
||
- Measure from the Fire Command Room to FAA or Lobby
|
||
|
||
###
|
||
|
||
### [!!!SLEEVES!!!]{.mark}
|
||
|
||
FIRE ALARM SLEEVING (ALWAYS CONCRETE & VERFIY ROMEX)
|
||
|
||
- ID.31. 2(PVC) or 7(NM)
|
||
|
||
- Typical for every floor count = \# of electrical rooms
|
||
|
||
{width="4.25in" height="1.55in"}
|
||
|
||
\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^
|
||
|
||
|
||
|
||
**Two-Way Stuff (CA.28.29. 3/7) (PROPOSAL \"STAND ALONE SYSTEMS\")**
|
||
|
||
- Length based from FCR
|
||
|
||
- To Elevator Lobbies & Stairwells\* (Whichever is longer)
|
||
|
||
[Horizontal]{.underline} = Take off once \| [Vertical]{.underline} =
|
||
Typical on all floors (Count 1 Length 15)
|
||
|
||
|
||
|
||
Find the Fire Control Room or FCC = Fire Command Center
|
||
|
||
- Put in High Rise Head End Assembly
|
||
|
||
- Measure from furthest end of FACR to furthest end of stairwell to find
|
||
length for \"FACR TO STAIRWELLS - 1\" CONDUIT - PVC\"
|
||
|
||
- This is for the Flow/Tamper modules
|
||
|
||
- Measure the same as stairwells for the elevator shaft for \"FACR TO
|
||
ELEV SHAFT - 1 1/2\" CONDUIT - PVC40\"
|
||
|
||
- This is for the elevator pit, input adders to run to pit usually 1
|
||
adder length 15.
|
||
|
||
|
||
|
||
Find the Elevator Control Room (Typically on roof) - Place count in FACR
|
||
|
||
- Average of 15\' per level, if 10 levels, utilize 115\' and add the
|
||
horizontal run of the Elev. Shaft measurement. If 105\'...use 215 to
|
||
include an adder of 10
|
||
|
||
- Add comment in take-off \"Control room on roof\"
|
||
|
||
- Use EMT if on Roof (for exposed vertical)
|
||
|
||
|
||
|
||
Generator Room
|
||
|
||
- Place count for \"GENERATOR ROOM - 1 CR, 2 MOD, SMOKE DET,
|
||
SPEAKER/STROBE = 60\' EMT\"
|
||
|
||
|
||
|
||
Fire Pump Room
|
||
|
||
- Place count for \"FIRE PUMP ROOM - 3 MOD, SMOKE DET, = 80\' EMT
|
||
|
||
|
||
|
||
There should be Terminal Cabinets on each level (to signal back to the
|
||
control room)
|
||
|
||
- Measure from Fire Command room to all electrical rooms. Use PVC for
|
||
first floor Horizontal.
|
||
|
||
- ACE D ACCESORY CABINET ENCLOSURE - (2) 2\" EMT 10\' RISER (Utilize if
|
||
EMT OH is required, otherwise PVC), Use EMT for Mid-Atlantic. Use EMT
|
||
for 2nd floor and above, do a typical for all floors.
|
||
|
||
|
||
|
||
Elevator Shafts
|
||
|
||
- Utilize \"ELEV SHAFT - 1 HEAT & 1 SMOKE = 50\' EMT\" for each shaft
|
||
|
||
|
||
|
||
Annunciators
|
||
|
||
- Usually at the entrance, if need to locate, search for ANN, RAN, FAA,
|
||
or FAAP (Fire Alarm Annunciator, Fire Alarm Annunciator Panel)
|
||
|
||
- Use Remote Serial Annunciator, LCD Display - PVC
|
||
|
||
- Measure from Fire Command Room to FAA
|
||
|
||
|
||
|
||
DAS (Below was for Raceway only)
|
||
|
||
Utilize the same length of the FACR to Elev Control Room for DAS \"FACR
|
||
TO ROOF = 2\" PVC40 W/ PVC WEATHERHEAD\"
|
||
|
||
- Place count in FACR
|
||
|
||
Utilize the same length of the FACR TO ELEV SHAFT for DAS \"FACR TO ELEV
|
||
PIT = 2\" PVC40
|
||
|
||
Utilize the same length of the FACR TO STAIRWELLS for DAS \"FACR TO
|
||
STAIRWELL = 2\" PVC40
|
||
|
||
|
||
|
||
You can create a typical for every floor to input this riser
|
||
assembly...This is for EVERY ELECTRICAL ROOM
|
||
|
||
\"2HR-RATED RM RISER TO EVERY FLR = 2\" PVC40 (15\') W/ 16X16X6 BOX\",
|
||
Use EMT for Mid-Atlantic
|
||
|
||
|
||
|
||
You can create a typical for every *OTHER* floor to input this riser
|
||
assembly...(input in the Stairwell Area). This is for EVERY STAIRWELL
|
||
|
||
\"STAIRWELL RISER EVERY 2 FLRS = 1 1/2\" PVC40 (20\') W/ 16X16X6 BOX\"
|
||
|
||
|
||
|
||
Measure from FACR to where the Electrical rooms will be on every floor.
|
||
(If garage levels in HR don\'t show TC, run to residential, same for RM
|
||
RISER TO EVERY FLR)
|
||
|
||
\"FACR TO 2HR-RATED RM = 2\" PVC40\"
|
||
|
||
|
||
|
||
CELLULAR DAS
|
||
|
||
Utilize CORRIDORS assembly and choose correct means and method. HR
|
||
utilize DECK if possible.
|
||
|
||
|
||
|
||
SLEEVING for DAS and FA
|
||
|
||
\- Anything that goes up the building needs sleeves. This will usually
|
||
be found where typicals were made.
|
||
|
||
Ex: DAS stairwell risers, elevator control room, cabinet enclosures
|
||
(electrical rooms)
|
||
|
||
|
||
|
||
## (DAS)
|
||
|
||
Monday, December 30, 2024
|
||
|
||
11:51 AM
|
||
|
||
### Raceways & Conduit
|
||
|
||
### OneNote
|
||
|
||
- PDI Proposal
|
||
|
||
- \"Stand Alone System\"
|
||
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| **DAS CHECKLIST** | **INSTRUCTIONS** | **ASSEMBLY** | **LOCATION** |
|
||
+:=================:+:================:+:==================:+:============:+
|
||
| Confirm with | Follow Conduit | | CA.26.31. |
|
||
| system Conduit | for Feeders | | |
|
||
| Requirement: | | | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| FACR to Roof = | Find Building | FACR TO ROOF = 2\" | CA.26.31.3 |
|
||
| 2\" Weather head | elevation on | EMT W/ RMC | |
|
||
| | Architectural | WEATHERHEAD & IMC | |
|
||
| | drawings | STUB | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| FACR to Every | Use length from | FACR TO ELEV PIT = | CA.26.31.5 |
|
||
| Elev. Shaft = 2\" | Fire Alarm | 2\" PVC40 | |
|
||
| | takeoff | | |
|
||
| | | [\* SAME COUNT as | |
|
||
| | | FA\*]{.mark} | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| FACR to Every | Use length from | FACR TO STAIRWELL | CA.26.31.8 |
|
||
| Staircase = | Fire Alarm | = 2\" PVC40 | |
|
||
| 2\" | takeoff | | |
|
||
| | | [\* SAME COUNT as | |
|
||
| | | FA\*]{.mark} | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| Stairwell Riser | Create a | STAIRWELL RISER | CA.26.31.12 |
|
||
| Every 2 Floors = | Stairwell | EVERY 2 FLRS = 1 | |
|
||
| 1 1/2\" w/ J-Box | typical | 1/2\" EMT (20\') | |
|
||
| | | W/ 16X16X6 BOX | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| FACR to Elec Rm = | Use length from | FACR TO 2HR-RATED | CA.26.31.14 |
|
||
| 2\" | Fire Alarm | RM = 2\" PVC40 | |
|
||
| | takeoff | | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| Elec Rm Riser to | Put assembly in | 2HR-RATED RM RISER | CA.26.31.18 |
|
||
| Every Floor = 2\" | every Electric | TO EVERY FLR = 2\" | |
|
||
| w/ J-Box | Room | EMT (15\') W/ | |
|
||
| | | 16X16X6 BOX | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| Horizontal - | Length for every | CORRIDORS EMT OH = | CA.26.31.23 |
|
||
| 1-1/2 through | corridor/garage | 1 1/2\" EMT W/ | |
|
||
| corridors | | 16X16X6 BOX EVERY | CA.26.31.21 |
|
||
| w/16x16x6 J-Box | | 80\' | |
|
||
| | | | |
|
||
| | | CORRIDORS DECK = 1 | |
|
||
| | | 1/2\" PVC40, | |
|
||
| | | STUBBY, FLEX W/ | |
|
||
| | | 16X16X6 BOX EVERY | |
|
||
| | | 80\' | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
| Sleeving Riser | Use for DAS | CAST-IN DEVICE CP | ID.31.2 |
|
||
| for DAS | Riser Conduit | 680-P 2\" | |
|
||
+-------------------+------------------+--------------------+--------------+
|
||
|
||
{width="8.325in" height="2.775in"}
|
||
|
||
|
||
|
||
THESE ARE CELLULAR
|
||
|
||
|
||
|
||
## (DAS/TWO-WAY COMMUNICATIONS)
|
||
|
||
**[Two-Way AKA \"Area of Refuge\"]{.mark}**
|
||
|
||
Wednesday, August 2, 2023
|
||
|
||
1:50 PM
|
||
|
||
|
||
|
||
### General Concept
|
||
|
||
- Length Based
|
||
|
||
- From FCR
|
||
|
||
- Elevator Lobbies\*\*\*
|
||
|
||
- Stairwells
|
||
|
||
**Two-Way Stuff (CA.28.29.) (PROPOSAL \"STAND ALONE SYSTEMS\")**
|
||
|
||
- Length based from FCR
|
||
|
||
- To Elevator Lobbies & Stairwells\* (Whichever is longer)
|
||
|
||
[Horizontal]{.underline} = Take off once \| [Vertical]{.underline} =
|
||
Typical on all floors (Count 1 Length 15)
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
DAS CA.27.31 (Below was for Raceway only) (PROPOSAL \"STAND ALONE
|
||
SYSTEMS\")
|
||
|
||
Utilize the same length of the FACR to Elev Control Room for DAS \"FACR
|
||
TO ROOF = 2\" PVC40 W/ PVC WEATHERHEAD\"
|
||
|
||
- Place count in FACR
|
||
|
||
Utilize the same length of the FACR TO ELEV SHAFT for DAS \"FACR TO ELEV
|
||
PIT = 2\" PVC40 [\* SAME COUNT as FA\*]{.mark}
|
||
|
||
Utilize the same length of the FACR TO STAIRWELLS for DAS \"FACR TO
|
||
STAIRWELL = 2\" PVC40 [\* SAME COUNT as FA\*]{.mark}
|
||
|
||
|
||
|
||
You can create a typical for every floor to input this riser
|
||
assembly...This is for EVERY ELECTRICAL ROOM
|
||
|
||
\"2HR-RATED RM RISER TO EVERY FLR = 2\" PVC40 (15\') W/ 16X16X6 BOX\",
|
||
Use EMT for Mid-Atlantic
|
||
|
||
|
||
|
||
You can create a typical for every *OTHER* floor to input this riser
|
||
assembly...(input in the Stairwell Area). This is for EVERY STAIRWELL
|
||
|
||
\"STAIRWELL RISER EVERY 2 FLRS = 1 1/2\" PVC40 (20\') W/ 16X16X6 BOX\"
|
||
|
||
|
||
|
||
Measure from FACR to where the Electrical rooms will be on every floor.
|
||
(If garage levels in HR don\'t show TC, run to residential, same for RM
|
||
RISER TO EVERY FLR)
|
||
|
||
\"FACR TO 2HR-RATED RM = 2\" PVC40\"
|
||
|
||
|
||
|
||
CELLULAR DAS
|
||
|
||
Utilize CORRIDORS assembly and choose correct means and method. HR
|
||
utilize DECK if possible.
|
||
|
||
> -Every 80\'
|
||
|
||
### Accubid Material
|
||
|
||
- CA\>26\>29 (Taken Off Once)
|
||
|
||
- \-\-\-\-\-\-\-\-\--\> Horizontal Material (\_\_\_)
|
||
|
||
- CA\>26\>29 (Typical All Floors)
|
||
|
||
- \-\-\-\-\-\-\-\-\--\> Vertical Material (\_\_\_)
|
||
|
||
|
||
|
||
- From FCR to Elevator Lobby and/or Stairwells
|
||
|
||
- Horizontal
|
||
|
||
- 1\"
|
||
|
||
- PVC vs EMT
|
||
|
||
- Go between two elevators
|
||
|
||
- Look for the device/symbol
|
||
|
||
- Might look like triangle don't confuse for telecom
|
||
|
||
- Use 1 adder of 15\'
|
||
|
||
- Riser
|
||
|
||
- Create typ for all levels
|
||
|
||
- Can use FA ones
|
||
|
||
- Don't link
|
||
|
||
- Add 15\' as length
|
||
|
||
|
||
|
||
## (FA DESIGN BUILD SYSTEM)
|
||
|
||
Friday, December 1, 2023
|
||
|
||
8:41 AM
|
||
|
||
|
||
|
||
|
||
|
||
**Initiating**
|
||
|
||
- Pull Stations
|
||
|
||
- Every exit on 1st floor
|
||
|
||
- Stairwell every level
|
||
|
||
- Smoke Detector
|
||
|
||
- Every level stairwell
|
||
|
||
- Flow-Tamper
|
||
|
||
- Every level stairwell
|
||
|
||
- If wood frame, take off as EMT
|
||
|
||
- No free air FT
|
||
|
||
- Relay Control
|
||
|
||
- FSD symbol
|
||
|
||
- Take off both FA and Electrical
|
||
|
||
- Misc Assemblies
|
||
|
||
- 5 is corridor
|
||
|
||
- 7 is garage
|
||
|
||
|
||
|
||
**Indicating**
|
||
|
||
- Indoor speak strobe - PVC with ENT
|
||
|
||
- Every 75 ft
|
||
|
||
- Can measure with circles on bluebeam
|
||
|
||
- In elevator lobby
|
||
|
||
- When on first floor and garage levels
|
||
|
||
- Throw in all BOH rooms
|
||
|
||
- Magnetic Door Holders
|
||
|
||
- Look for double doors
|
||
|
||
- Typ in elevator lobby and/or corridor
|
||
|
||
- Add mechanical connection
|
||
|
||
- Common Assemblies
|
||
|
||
- Mechanical connections up to 100A
|
||
|
||
- PVC AL Flex
|
||
|
||
- 20 A
|
||
|
||
|
||
|
||
**Riser**
|
||
|
||
- Visit \"(FA RISER)\" Page in my notes
|
||
|
||
|
||
|
||
|
||
|
||
## (ELECTRICAL)
|
||
|
||
Friday, May 26, 2023
|
||
|
||
9:35 AM
|
||
|
||
|
||
|
||
**Mechanical Connections**
|
||
|
||
- Search for Panel
|
||
|
||
- 1,2 Circuits = 1 Phase
|
||
|
||
- 3,3,3 Circuits = 3 Phase
|
||
|
||
- Go by Wire Size then Amps
|
||
|
||
## [Measured Mechanical Connections *[ADDERS]{.underline}*]{.mark}
|
||
|
||
**[Wood Frame buildings]{.mark}**
|
||
|
||
- SS=Set Screw - Cheaper.
|
||
|
||
- COMP=Compression - \$\$ - Labor Intensive & Water Tight.
|
||
|
||
- Conduit section of the Specs under
|
||
[Execution/Installation]{.underline}
|
||
|
||
**EPO**
|
||
|
||
Electric Power Off Button
|
||
|
||
CA\>33\>15/16
|
||
|
||
SHUNT TRIP
|
||
|
||
**Measured Mechanical Connections *[ADDERS]{.underline}***
|
||
|
||
|
||
|
||
**Roof Rec.**
|
||
|
||
- CA.14.27.17/20
|
||
|
||
**EMT HOMERUNS**
|
||
|
||
CA 44.4.16/27
|
||
|
||
**A-Bid Mech. Con.**
|
||
|
||
- Max 100A.
|
||
|
||
- Measure all over (100A.)
|
||
|
||
**Elevator Assembly**
|
||
|
||
- CA.22
|
||
|
||
- Bottom = 7-9
|
||
|
||
- Top = 2-5
|
||
|
||
**Measurements**
|
||
|
||
- Measure device furthest from electrical room
|
||
|
||
- Multiply length by \# of Devices
|
||
|
||
- Ex// (100\' 1 count)x6 = 600\' 6 count
|
||
|
||
**NM Floor Boxes**
|
||
|
||
- CA.15.28.9
|
||
|
||
**Fire Pumps**
|
||
|
||
- ALWAYS COPPER \$\$\$
|
||
|
||
**VAV Boxes**
|
||
|
||
- \*Mechanical Drawings\*
|
||
|
||
- Taken off as electrical
|
||
|
||
|
||
|
||
### Building
|
||
|
||
- Al Flex / 20A #12
|
||
|
||
- MC Flush Metal Studs
|
||
|
||
**Surge Suppression Receptacles**
|
||
|
||
- ID.14.11.16.2
|
||
|
||
- Protects TVs from lighting
|
||
|
||
**Stairwell Circuits**
|
||
|
||
- Stairwells far from elec. Rooms
|
||
|
||
- Up-Up SlabDeck Homeruns
|
||
|
||
**Pool Panel**
|
||
|
||
- Nothing in Pool Taken off
|
||
|
||
**Cable Trays 4 wires**
|
||
|
||
- CA.46.2
|
||
|
||
**Exhaust Fan**
|
||
|
||
- 20A Mech. Con.
|
||
|
||
- Garage or roof 30A CarFlex
|
||
|
||
**Tri Power Pop-Up Rec.**
|
||
|
||
- Google Item \#
|
||
|
||
- Add as much info as possible
|
||
|
||
**Deck Thickness**
|
||
|
||
- Typical Floor Structural Drawings
|
||
|
||
- Ex// 8\" Deck
|
||
|
||
**Final Sequence of Events**
|
||
|
||
1. Trash Shoot
|
||
|
||
2. CU
|
||
|
||
3. Slab Deck
|
||
|
||
4. Temporary Power
|
||
|
||
**4.1 Temp Power**
|
||
|
||
{width="3.4583333333333335in"
|
||
height="1.3833333333333333in"}
|
||
|
||
3. **Slab Deck**
|
||
|
||
- ID.37.16.1
|
||
|
||
- 2 Typicals
|
||
|
||
- \'All Building\'
|
||
|
||
- 1 every level (Not Roof)
|
||
|
||
- HD 1 Per Section
|
||
|
||
- \'All Garage\'
|
||
|
||
- 1 every level
|
||
|
||
4. **Temporary Power & Lighting**
|
||
|
||
- ID.28.
|
||
|
||
- 3/4/5 (A-bid\>\>)
|
||
|
||
- 8/9
|
||
|
||
- Total GSF - Garage GSF = Building Size
|
||
|
||
- Garage SF = Temp lighting Garage
|
||
|
||
- Enter in count
|
||
|
||
1. **Trash shoot**
|
||
|
||
- Check elevations for floor height
|
||
|
||
- Un check Link \'Enable Livecount\'
|
||
|
||
- CA.32(Misc. Ass.). 2
|
||
|
||
- 100\' Horizontal
|
||
|
||
- Ex// 51 floors of shoot\>10\' elevation\>510 length
|
||
|
||
2. **CU/IP**
|
||
|
||
- OneNote
|
||
|
||
>
|
||
>
|
||
> -Units CU
|
||
>
|
||
>
|
||
>
|
||
> -Mechanical Connection
|
||
|
||
{width="0.48333333333333334in"
|
||
height="0.3416666666666667in"}{width="0.425in"
|
||
height="0.375in"}{width="2.875in"
|
||
height="0.8666666666666667in"}
|
||
|
||
**4.2 Temp Lighting (Bldg.) (Garage)**
|
||
|
||
ID.28.1 - Gardens Take off 1 Tpole per 150\' per building
|
||
|
||
{width="3.091666666666667in"
|
||
height="1.1166666666666667in"}{width="3.091666666666667in"
|
||
height="1.1166666666666667in"}
|
||
|
||
5. **Irrigation pumps**
|
||
|
||
- SYSTEM: MISC - Site Miscellaneous
|
||
|
||
- \(3\) 3Phase 30A 200\' Mech. Con.
|
||
|
||
{width="2.691666666666667in"
|
||
height="0.9916666666666667in"}{width="23.841666666666665in"
|
||
height="0.6in"}
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
## (ELECTRICAL 2.0)
|
||
|
||
Wednesday, April 3, 2024
|
||
|
||
9:40 AM
|
||
|
||
|
||
|
||
- LT
|
||
|
||
- Liquid tight metallic conduit
|
||
|
||
- Article 350 in the NEC
|
||
|
||
- A metal conduit surrounded by a layer of flexible tubing
|
||
|
||
- Carflex
|
||
|
||
- Liquid tight non-metallic conduit
|
||
|
||
- Just the tubing, NO metal conduit inside
|
||
|
||
- Carflex is a brand
|
||
|
||
- Article 356 in the NEC
|
||
|
||
- Per 356.12 can only run a max of 6ft UNLESS
|
||
|
||
- Secured by straps or is supported
|
||
|
||
- Think durablocks
|
||
|
||
- In our CU assemblies
|
||
|
||
- Car flex is supported so we are good
|
||
|
||
- The carflex is only 8ft anyways the main run is PVC
|
||
|
||
- In our Mechanical Connections assemblies
|
||
|
||
- Runs are mostly PVC w/ minimal carflex
|
||
|
||
- So we are GOOD TO USE CARFLEX ON ROOF
|
||
|
||
**Power to Irrigation pump**
|
||
|
||
- We usually own
|
||
|
||
- 30A 3Phase (CarFlex)
|
||
|
||
**MECHANICAL CONNECTIONS**
|
||
|
||
- \_\_\_ - AL FLEX (Dry Areas) \"Can\'t get wet\" [\$]{.mark}
|
||
|
||
- \_\_\_ - LT FLEX (Indoors) \"Can get wet\" [\$\$]{.mark}
|
||
|
||
- \_\_\_ - CARFLEX (Outside) \"Waterproof\" [\$\$\$]{.mark}
|
||
|
||
**When roof is bland**
|
||
|
||
- Check mechanical drawings
|
||
|
||
**SITE**
|
||
|
||
- If adding pedestal for receptacles, use WP rec and remove box and
|
||
plate then add the guard and post WP pedastal
|
||
|
||
- ID. 38.2.5
|
||
|
||
- KEEP SITE AS SITE MISC NOT ELECTRICAL
|
||
|
||
- When in doubt make lengths 200\'
|
||
|
||
**Corridor Rec.**
|
||
|
||
- Can be daisy-chained vertically through floors
|
||
|
||
- Use the PVC Device to run through floors
|
||
|
||
- Shown Below:
|
||
|
||
{width="3.4833333333333334in" height="2.325in"}
|
||
|
||
|
||
|
||
**Grill connection**
|
||
|
||
- = taken off as EPO
|
||
|
||
- CA.32.15/16
|
||
|
||
**EMT HOMERUNS (CA.7.2-5.\_)**
|
||
|
||
#12 -\> 20A
|
||
|
||
#10- \> 30A
|
||
|
||
#8 -\> 40A
|
||
|
||
#6 -\> 50A
|
||
|
||
|
||
|
||
**POKE THRU FLOORBOXES**
|
||
|
||
- Takeoff a regular floorbox like normal
|
||
|
||
- Open up assembly
|
||
|
||
- Delete the first 3 lines
|
||
|
||
- Then add ID.14.19.1.33
|
||
|
||
- Rename to poke thru floorbox
|
||
|
||
|
||
|
||
|
||
|
||
{width="5.0in" height="0.45in"}
|
||
|
||
|
||
|
||
|
||
|
||
{width="5.0in" height="1.875in"}
|
||
|
||
**ROOF Rec. Window Cleaning**
|
||
|
||
ROOFTOP WP TWISTLOCK REC. (CA.16.11.5/6
|
||
|
||
|
||
|
||
{width="5.008333333333334in" height="3.875in"}
|
||
|
||
## (ELECTRICAL 3.0)
|
||
|
||
Tuesday, December 17, 2024
|
||
|
||
10:52 AM
|
||
|
||
|
||
|
||
**\"Power Receptacle\" Three Pronged L6-30, L5-30**
|
||
|
||
- Use CA.16.11.2/3
|
||
|
||
- \"Specialty receptacles\" - Sometimes have locks
|
||
|
||
|
||
|
||
{width="5.0in" height="0.375in"}
|
||
|
||
|
||
|
||
{width="3.8666666666666667in"
|
||
height="1.6583333333333334in"}
|
||
|
||
|
||
|
||
## (GARAGE)
|
||
|
||
Thursday, December 28, 2023
|
||
|
||
12:51 PM
|
||
|
||
**Garage OneNote**
|
||
|
||
- Flat or I-Beam(T-Rod)?
|
||
|
||
- Elevations (Arch.)
|
||
|
||
- Precast or Poured?
|
||
|
||
- Arch. First pages
|
||
|
||
**Garage Door Opener**
|
||
|
||
- CA: 32.19
|
||
|
||
### Garage/Roof
|
||
|
||
- Tends to be: CAR FLEX / 30A & #10
|
||
|
||
**Car Lift**
|
||
|
||
- 60A mechanical Connections
|
||
|
||
**EV Chargers**
|
||
|
||
- System: Renewable Energy
|
||
|
||
- CA.18.5 Wall/Floor/Dual
|
||
|
||
- Dual = two circuits
|
||
|
||
- Ex// (1,3)
|
||
|
||
**CO System**
|
||
|
||
- A-Bid - System - LV - CO System
|
||
|
||
- Devices CA: 28.20.3
|
||
|
||
- Connections CA: 28.20.6
|
||
|
||
- 1 connection per 3 fans
|
||
|
||
**Receptacles 20A**
|
||
|
||
- Garage = (PVC)
|
||
|
||
- Surface
|
||
|
||
- \'DON'T USE FLUSH\'
|
||
|
||
|
||
|
||
**Set Screw(1.1.8) -\> Compression (1.1.9...)**
|
||
|
||
- Car Chargers
|
||
|
||
{width="4.416666666666667in" height="2.05in"}
|
||
|
||
|
||
|
||
## (CONDENSING UNITS)
|
||
|
||
## MINIMUM #10
|
||
|
||
## CORRIDOR
|
||
|
||
**[Romex CU:]{.underline}** ROMEX CANNOT BE OUTSIED \*\*\*EMT/PVC\*\*\*
|
||
|
||
**[Con.U PHASE:]{.underline}** CORRIDOR
|
||
|
||
Monday, June 19, 2023
|
||
|
||
11:10 AM
|
||
|
||
|
||
|
||
- CREATE A CU MATRIX USING THE UNIT MATRIX FLOOR BREAKDOWN
|
||
|
||
|
||
|
||
Examples: 1 has different breakout same level, the other one just by
|
||
levels no breakouts for each level.
|
||
|
||
|
||
|
||
{width="8.416666666666666in" height="2.375in"}
|
||
|
||
|
||
|
||
{width="6.658333333333333in" height="1.75in"}
|
||
|
||
|
||
|
||
- TO CALCULATE HORIZONTAL LENGTHS, GO TO ACCUBID AND COPY ALL UNIT
|
||
SUBFEEDS INTO AN EXCEL BLANK PG.
|
||
|
||
|
||
|
||
EX//
|
||
|
||
{width="4.616666666666666in"
|
||
height="2.341666666666667in"}
|
||
|
||
|
||
|
||
- GET THE TOTAL LENGTH OF ALL SUBFEED AND IN EXCEL AT THE BOTTOM RIGHT
|
||
GET THE AVERAGE, THEN ROUND UP. TYPE IT INTO HORIZ LENGTH.
|
||
|
||
- FOR THE VERTICAL LENGHTS, START AT THE LAST LEVEL WITH AN AVERAGE OF
|
||
20, THEN ADD 10 MORE TO EACH FLOOR GOING DOWN, EX. BLDG HAS 7 FLOORS,
|
||
START WITH 20 AT LEVEL 7 THEN ADD 10 AT LEVEL 6 TO GIVE IT A TOTAL OF
|
||
30, THEN 5TH FLOOR AT 10 TO GIVE IT 40 AND SO FORTH.
|
||
|
||
|
||
|
||
------------------------------------------------------------------------
|
||
Level 04 Area 1 Building 150 50
|
||
---------------------------------------- ---------------- --------------
|
||
Level 04 Area 2 Building 150 50
|
||
|
||
Level 04 Area 3 Building 150 50
|
||
|
||
Level 04 Area 4 Building 150 50
|
||
|
||
Level 04 Area 5 Building 150 50
|
||
|
||
Level 05 Area 1 Building 150 40
|
||
|
||
Level 05 Area 2 Building 150 40
|
||
|
||
Level 05 Area 3 Building 150 40
|
||
|
||
Level 05 Area 4 Building 150 40
|
||
|
||
Level 05 Area 5 Building 150 40
|
||
|
||
Level 06 Area 1 Building 150 30
|
||
|
||
Level 06 Area 2 Building 150 30
|
||
|
||
Level 06 Area 3 Building 150 30
|
||
|
||
Level 06 Area 4 Building 150 30
|
||
|
||
Level 06 Area 5 Building 150 30
|
||
|
||
Level 07 Area 1 Building 150 20
|
||
|
||
Level 07 Area 2 Building 150 20
|
||
|
||
Level 07 Area 3 Building 150 20
|
||
|
||
Level 07 Area 4 Building 150 20
|
||
|
||
Level 07 Area 5 Building 150 20
|
||
------------------------------------------------------------------------
|
||
|
||
>
|
||
|
||
- TOTAL LENGTH HAS A FORMULA TO ADD HORIZ AND VERT TOTAL
|
||
|
||
|
||
|
||
- FOR THE QTY OF THE CABLE SIZE OF EACH CU, GO TO EACH UNIT PANEL
|
||
SCHEDULE IN ELECTRICALS LOOK FOR CU AND THE AMP.
|
||
|
||
|
||
|
||
- {width="4.833333333333333in" height="0.425in"}
|
||
|
||
-
|
||
|
||
- THEN ON UNIT MATRIX ADD A SECTION FOR CONDENSING UNITS
|
||
|
||
|
||
|
||
{width="12.216666666666667in"
|
||
height="0.5416666666666666in"}
|
||
|
||
|
||
|
||
EX ABOVE, A1 HAS A CU OF SIZE #10 AND B1 HAS A SIZE OF #8, THEN ADD HOW
|
||
MANY OF EACH YOU HAVE IN EACH FLOOR AND AREA.
|
||
|
||
{width="11.633333333333333in"
|
||
height="0.4666666666666667in"}
|
||
|
||
|
||
|
||
EX. ABOVE THERE\'S JUST 1 #10 AND 3 #8, TYPE THAT INTO THE CU MATRIX
|
||
|
||
|
||
|
||
{width="1.3416666666666666in"
|
||
height="0.5666666666666667in"}
|
||
|
||
|
||
|
||
|
||
|
||
CARLENE NOTES
|
||
|
||
|
||
|
||
ROOF
|
||
|
||
|
||
|
||
|
||
|
||
- CA.18.3. (2-6) ASSEMBLY FOR ROOF:
|
||
|
||
|
||
|
||
{width="4.083333333333333in"
|
||
height="1.2166666666666666in"}
|
||
|
||
|
||
|
||
- COUNT CU PER SECTION OF THE BLDG AND THE ASSOCIATED AMP (CHECK UNIT
|
||
PANELS AND UNIT MATRIX)
|
||
|
||
- ENTER THE COUNTS
|
||
|
||
{width="9.133333333333333in"
|
||
height="2.6666666666666665in"}
|
||
|
||
- ADD FREE STANDING STRUT SUPPORTS FOR EVERY \~25 CU. USE CA 22.3.6 TAKE
|
||
TOTAL CU COUNT, DIVIDE BY 25, THEN ROUND UP. EX. 310 TOTAL CU/25=12.4
|
||
ROUND UP TO 13
|
||
|
||
|
||
|
||
PER FLOOR
|
||
|
||
|
||
|
||
- CALCULATE THE HORIZONTAL AND VERTICAL LENGTHS OF CONDUIT PER FLOOR
|
||
|
||
- ASSIGN THE QTY IN THE COUNT AND THE QTY LENGTH IN THE LENGTH
|
||
|
||
|
||
|
||
USE CA.17.2. ASSEMBLIES
|
||
|
||
|
||
|
||
EX.
|
||
|
||
|
||
|
||
> 3 CU WITH #8, WITH A LENGTH (HORIZ + VERT) OF 180\' EACH
|
||
>
|
||
> {width="9.975in" height="2.6333333333333333in"}
|
||
|
||
**[#4 CU Homerun:]{.underline}** Change wire from #6 to #4
|
||
|
||
**[Wacky Garden CU:]{.underline}** Marlowe Crown Point
|
||
|
||
**CU #WIRE SIZES#**
|
||
|
||
If there is a mix of #10 & #8 \-\--\> Run both #10 & #8
|
||
|
||
|
||
|
||
## MINIMUM #10
|
||
|
||
## CORRIDOR
|
||
|
||
##
|
||
|
||
## Sleeves = BOH
|
||
|
||
#12 -\> 20A
|
||
|
||
#10- \> 30A
|
||
|
||
#8 -\> 40A
|
||
|
||
#6 -\> 50A
|
||
|
||
|
||
|
||
{width="4.85in" height="3.658333333333333in"}
|
||
|
||
|
||
|
||
## (CO DETECTION)
|
||
|
||
Tuesday, June 15, 2021
|
||
|
||
9:25 AM
|
||
|
||
{width="2.2583333333333333in"
|
||
height="1.5083333333333333in"}
|
||
|
||
COMMON ASSEMBLIES -\> LOW VOLTAGE SYSTEMS -\> CO DETECTION -\>
|
||
|
||
Typically use #3 3/4\" Conduit with EMT Drop 100\' for the CO devices
|
||
|
||
Typically use #6 for the VFD/Fan
|
||
|
||
These will be allocated in the LV-CO System System in accubid
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
{width="2.558333333333333in"
|
||
height="1.95in"}{width="1.6916666666666667in"
|
||
height="1.25in"}{width="5.8in"
|
||
height="0.4666666666666667in"}
|
||
|
||
|
||
|
||
You will need to run conduit/power from VFD to panel. You can take this
|
||
off in Elec. (Mech Conn)
|
||
|
||
|
||
|
||
Another example... \"1\" is the CO Device, the other is the fan
|
||
|
||
{width="3.425in" height="3.825in"}
|
||
|
||
|
||
|
||
Detail of CO Control Panel
|
||
|
||
{width="3.3833333333333333in" height="2.25in"}
|
||
|
||
|
||
|
||
|
||
|
||
## (GARDEN STYLE CU)
|
||
|
||
Wednesday, March 20, 2024
|
||
|
||
3:17 PM
|
||
|
||
|
||
|
||
{width="4.508333333333334in"
|
||
height="2.183333333333333in"}
|
||
|
||
- The Assembly for the CU itself covers the PVC Flex to the disconnect.
|
||
|
||
- Then run Romex from the disconnect to the unit.
|
||
|
||
|
||
|
||
- For mechanical check house schedules for the #Wire Size
|
||
|
||
|
||
|
||
JOB EX//: MARLOWE CROWN POINT/THE SWITCH
|
||
|
||
|
||
|
||
{width="3.5in" height="1.125in"}
|
||
|
||
|
||
|
||
## (SITE)
|
||
|
||
Monday, February 26, 2024
|
||
|
||
10:32 AM
|
||
|
||
|
||
|
||
**EV Chargers**
|
||
|
||
- A-BID: EV Chargers that are [NOT garage are SITE]{.underline}
|
||
|
||
- System: Renewable Energy
|
||
|
||
- CA.17.5 Wall/Floor/Dual
|
||
|
||
- Dual = two circuits
|
||
|
||
- Ex// 2,6
|
||
|
||
**Exterior Mech. Con.**
|
||
|
||
- ALL 30A
|
||
|
||
- ALL CARFLEX
|
||
|
||
|
||
|
||
## (HOME RUNS)
|
||
|
||
Monday, August 12, 2024
|
||
|
||
7:35 AM
|
||
|
||
**[General Rule of thumb]{.underline}**
|
||
|
||
**Multiple Home runs**
|
||
|
||
- It can be in the same conduit if going to the same panel
|
||
|
||
- (Emergency/Normal)
|
||
|
||
-----------------------------------------------------------------------
|
||
\<100\' #12
|
||
----------------------------------------- -----------------------------
|
||
100\'-200\' #10
|
||
|
||
200\'-300\' #8
|
||
-----------------------------------------------------------------------
|
||
|
||
|
||
|
||
|
||
|
||
{width="6.5in"
|
||
height="3.816666666666667in"}{width="1.9in"
|
||
height="0.6333333333333333in"}
|
||
|
||
## (SUBFEEDS)
|
||
|
||
### Wire Thickness
|
||
|
||
- 1/3 \" Outside Diameter
|
||
|
||
- Ex// 8\" = 8/3 = 2.6667 = up to 2\"
|
||
|
||
### Linking Sub-Feeds
|
||
|
||
- Plans & Specs
|
||
|
||
- Go off of WIRE SIZE
|
||
|
||
- \*Unless CU
|
||
|
||
Monday, June 19, 2023
|
||
|
||
11:08 AM
|
||
|
||
{width="1.9833333333333334in"
|
||
height="0.7583333333333333in"}
|
||
|
||
### SubFeed General Steps
|
||
|
||
1. Determine Method
|
||
|
||
2. Determine Sizing
|
||
|
||
3. What needs to be added (Pigtails, Stubby)
|
||
|
||
4. Voltage Drop Calculator **(DO WE OWN VD?)**
|
||
|
||
{width="3.0in"
|
||
height="1.675in"}{width="0.4083333333333333in"
|
||
height="0.38333333333333336in"}{width="0.45in"
|
||
height="0.3333333333333333in"}{width="3.6in"
|
||
height="2.5166666666666666in"}
|
||
|
||
### FINAL CHECKLIST
|
||
|
||
- Wire (Aluminum/Copper)
|
||
|
||
- Material (PVC/MC/EMT/SER)
|
||
|
||
- Pigtails
|
||
|
||
- Wire Troughs
|
||
|
||
- Sleeving
|
||
|
||
### Construction Type: (Location)
|
||
|
||
1. Electrical \^\^Arch.First-5-Pages.Construction-Type
|
||
|
||
2. Structural
|
||
|
||
3. Project Manuel
|
||
|
||
{width="4.658333333333333in"
|
||
height="0.7916666666666666in"}{width="0.45in"
|
||
height="0.3in"}{width="0.35in"
|
||
height="0.30833333333333335in"}
|
||
|
||
### High Rise Sub-Feeds
|
||
|
||
- When between \$\$\$MC/\$PVC -\> \$PVC
|
||
|
||
- (As of Right now)
|
||
|
||
- EMT = \$\$\$\$\$\$/ \'Last Resort\'
|
||
|
||
{width="4.741666666666666in"
|
||
height="0.8416666666666667in"}
|
||
|
||
### Voltage Drop
|
||
|
||
- VD = (Amps\*Length\'\*Ohms)/Phase
|
||
|
||
- Determined by Demand Load
|
||
|
||
{width="2.933333333333333in"
|
||
height="1.0in"}{width="5.333333333333333in"
|
||
height="1.5333333333333334in"}
|
||
|
||
Amps : Use minimum from \"Unit Load Calculations\"
|
||
|
||
|
||
|
||
- \"Prefab Unti Takeoff\"
|
||
|
||
- 17min = Voltage Drop Calc
|
||
|
||
### [Base on LOAD CALCULATIONS]{.mark}
|
||
|
||
|
||
|
||
[COPPER]{.mark}
|
||
|
||
[VRS.]{.mark}
|
||
|
||
[ALUMINUM!!!!!!!!!!!]{.mark}
|
||
|
||
### OneNote
|
||
|
||
- UNIT KEY NOTES
|
||
|
||
- Project Manuel: -\> Raceways & Boxes
|
||
|
||
- Conduit = PVC
|
||
|
||
- Cable = MC/SER
|
||
|
||
## (UNIT SF ROUTING)
|
||
|
||
**\*\*\*SINGLE PHASE\*\*\***
|
||
|
||
### Tips & Tricks
|
||
|
||
- Hot Keys:
|
||
|
||
- O: Turn Drawing 90\*
|
||
|
||
- P: Polar (Only 90\* cuts)
|
||
|
||
- H: Enable Crosshair +
|
||
|
||
- N: Start new Measurement
|
||
|
||
- S: Stop
|
||
|
||
- Crtl: 90\*
|
||
|
||
- Don\'t Believe PDI Proposal
|
||
|
||
Wednesday, March 22, 2023
|
||
|
||
8:00 AM
|
||
|
||
|
||
|
||
Don\'t Forget Adders
|
||
|
||
### SubFeed Categories
|
||
|
||
1. MC (Cables) - Feeding Wires through the ceiling
|
||
|
||
2. SER (Romex Cables) -
|
||
\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^\^
|
||
|
||
3. PVC (Conduit) - Feeding wires through the concrete floors
|
||
|
||
[Manually Input Adders]{.mark}
|
||
|
||
### When Completely Lost
|
||
|
||
- Look Through Enlarged Drawings
|
||
|
||
- Check Unit Panels
|
||
|
||
- Check Panel Schedules
|
||
|
||
- Look Through Riser Drawings
|
||
|
||
### General
|
||
|
||
- Corner Every Turn
|
||
|
||
- AVOID: Stairwells, Columns, Elevators, & Trash shoots
|
||
|
||
- \$\$\$ Copper
|
||
|
||
- MC/SER/PVC/EMT = Follow Corridors
|
||
|
||
- Even if a unit has homeruns still need subfeeds
|
||
|
||
ADDER LENGTHS\*\*\* (Assuming 10\' Elevations)
|
||
|
||
MC/SER (Cable)
|
||
|
||
PVC/(Conduit)
|
||
|
||
EMT/(Conduit)
|
||
|
||
-----------------------------------------------------------------------
|
||
[ULC]{.underline} [MeCe]{.underline}
|
||
-------------------------------------- --------------------------------
|
||
50
|
||
|
||
40
|
||
|
||
30
|
||
|
||
20\-\-\-\-\-\-- Meter Center
|
||
|
||
20
|
||
|
||
30
|
||
|
||
40
|
||
-----------------------------------------------------------------------
|
||
|
||
-----------------------------------------------------------------------
|
||
[ULC]{.underline} [MeCe]{.underline}
|
||
-------------------------------------- --------------------------------
|
||
40/30
|
||
|
||
30/20
|
||
|
||
20/10
|
||
|
||
10\-\-\-\-\-\-- Meter Center
|
||
|
||
10
|
||
|
||
20
|
||
|
||
30
|
||
-----------------------------------------------------------------------
|
||
|
||
### Step by Step
|
||
|
||
1. Locate:
|
||
|
||
a. Unit Load Centers on floor plans (If not Provided)
|
||
|
||
2. Locate:
|
||
|
||
a. Electrical room -\> Meter Center
|
||
|
||
3. Recognize:
|
||
|
||
a. potential for typicals throughout steps 1&2
|
||
|
||
4. Use:
|
||
|
||
a. Riser Diagram to determine the Length of adders for the floor(s)
|
||
before measurements.
|
||
|
||
5. Create new measurement and go from ULCs -\> MC
|
||
|
||
a. ADD ADDERS AFTER CREATION
|
||
|
||
6. Move/Copy if applicable
|
||
|
||
-----------------------------------------------------------------------
|
||
[ULC]{.underline} [MeCe]{.underline}
|
||
-------------------------------------- --------------------------------
|
||
40
|
||
|
||
30
|
||
|
||
20
|
||
|
||
10\-\-\-\-\-\-- Meter Center
|
||
|
||
10
|
||
|
||
20
|
||
|
||
30
|
||
-----------------------------------------------------------------------
|
||
|
||
### Smerf Tubes
|
||
|
||
- Emerson lakes (2024 Florida)
|
||
|
||
TELECOM NOT SUBFEEDS
|
||
|
||
- Blue ENT
|
||
|
||
|
||
|
||
### MC
|
||
|
||
### PVC
|
||
|
||
Additional Wire length to put into the pieces connecting ULC, and Meter
|
||
center
|
||
|
||
PVC can be 20\' OH in scenarios like below
|
||
|
||
{width="4.791666666666667in"
|
||
height="3.3333333333333335in"}{width="2.558333333333333in"
|
||
height="3.425in"}
|
||
|
||
In this case they wouldn\'t want to run two floors worth of Subfeeds in
|
||
one floor
|
||
|
||
|
||
|
||
n
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
### Fill out OneNote for Subfeeds
|
||
|
||
- [Item Database]{.underline} \> 6.19.1/6 \>???
|
||
|
||
- [Structural]{.underline} \> Deck Thickness
|
||
|
||
- Ex// 6\" Deck 1,1/2\" PVC Won\'t Fit
|
||
|
||
- [Project Manuel]{.underline}
|
||
|
||
- Raceways / Conduit (Section 26)
|
||
|
||
- PVC Allowed?
|
||
|
||
- Req. Eng. Approval? (Prob. No)
|
||
|
||
- Cable
|
||
|
||
- \"Sometimes can\'t use MC Blah\"
|
||
|
||
- Riser Diagram
|
||
|
||
### [UNIT Amps]{.mark}
|
||
|
||
- [BASED OFF OF LOAD CALC.]{.mark}
|
||
|
||
## (SF LINKING)
|
||
|
||
### Meter Center Trough
|
||
|
||
- Only PVC
|
||
|
||
- Helps connect wire to the Meter Center
|
||
|
||
### Voltage Drop Calculator (IF WE OWN VD)
|
||
|
||
[Excel Link on OneNote]{.underline}
|
||
|
||
> Voltage (Panel)
|
||
>
|
||
> Voltage Drop (%)
|
||
>
|
||
> Phase (Single)
|
||
>
|
||
> Material (ex// Al Standed)
|
||
>
|
||
> Wire Size (#)
|
||
>
|
||
> AMPS (80% of Feeder Breakers or Demand Load)
|
||
>
|
||
> Number of Parallels (Prob. 0)
|
||
|
||
Thursday, April 6, 2023
|
||
|
||
7:10 AM
|
||
|
||
### Key Documents
|
||
|
||
- Electrical
|
||
|
||
- Project Manuel
|
||
|
||
### Voltage Drop
|
||
|
||
- \"Longer wire runs the less conductivity it has\"
|
||
|
||
- When in doubt 3%
|
||
|
||
- Riser Diagram, Electrical Notes, and Wire Specs. Project Manuel
|
||
|
||
- Max \# size is Capped
|
||
|
||
### Aluminum to Copper
|
||
|
||
Amp to Amps
|
||
|
||
### Pig-Tails Pigtails
|
||
|
||
- \"Helps Wire into Unit Load Center\"
|
||
|
||
- Bigger Panels don\'t NEED Pigtails
|
||
|
||
- (Could be 1 per conductor)
|
||
|
||
- \*Only if 3/0+
|
||
|
||
- ID: 4.8.12(7-15)
|
||
|
||
- Ex//
|
||
|
||
- PVC = 3/0+ , 3 Pig-Tails
|
||
|
||
- MC = 3/0+ , 3 Pig-Tails
|
||
|
||
### General Notes
|
||
|
||
- MC = Not Allowed Exposed Areas
|
||
|
||
- PVC = Preferred Method
|
||
|
||
[WIRE SIZE]{.mark}
|
||
|
||
[PLANS & SPECS]{.mark}
|
||
|
||
{width="6.566666666666666in" height="1.8in"}
|
||
|
||
### Wood Frame Subfeeds
|
||
|
||
Meter center on the outside of the building on the side then SER can be
|
||
used.
|
||
|
||
|
||
|
||
|
||
|
||
### Meter Center Troughs (PVC)
|
||
|
||
- Accubid System Electrical
|
||
|
||
- A-Bid Subfeeds \^
|
||
|
||
- Only if we own VOLTAGE DROP
|
||
|
||
- Typical in A-Bid every level w/ meter center
|
||
|
||
- ID: 16.27.2
|
||
|
||
> **Accubid Linking**
|
||
>
|
||
> -SF are Single phase and Stranded
|
||
>
|
||
>
|
||
|
||
- Do not go up a size if not shown on a plans and specs feeder schedule
|
||
and we do not own VD
|
||
|
||
|
||
|
||
### Sub Feed Calculator
|
||
|
||
- Only if we [own VOLTAGE DROP]{.underline}
|
||
|
||
|
||
|
||
{width="5.0in"
|
||
height="3.2083333333333335in"}{width="7.608333333333333in"
|
||
height="4.616666666666666in"}
|
||
|
||
## (SF DIAGRAMS)
|
||
|
||
Friday, May 12, 2023
|
||
|
||
10:46 AM
|
||
|
||
|
||
|
||
{width="5.275in"
|
||
height="2.783333333333333in"}{width="5.366666666666666in"
|
||
height="1.4166666666666667in"}
|
||
|
||
|
||
|
||
## (DESIGN BUILD SUBFEEDS)
|
||
|
||
Friday, July 19, 2024
|
||
|
||
8:02 AM
|
||
|
||
|
||
|
||
**ALUMINUM**
|
||
|
||
{width="5.75in" height="7.25in"}
|
||
|
||
|
||
|
||
## (HOTEL SUBFEEDS)
|
||
|
||
1685 COLLINS HOTEL
|
||
|
||
- **Network\>Egnyte\>Shared\>Trimble\>Accubid\>Bid**
|
||
|
||
Thursday, September 7, 2023
|
||
|
||
10:53 AM
|
||
|
||
|
||
|
||
**Hotel subfeeds from scratch**
|
||
|
||
[Sub feeds]{.underline}
|
||
|
||
- No Unit Panels?
|
||
|
||
- PDI Unit Subfeeds
|
||
|
||
- #12 up to 100\' #10 up to 200\'
|
||
|
||
- 1 (3) Circuit takeoff for guestroom
|
||
|
||
- 1 (1) Circuit takeoff for AHU
|
||
|
||
>
|
||
|
||
- For Takeoff
|
||
|
||
- Make a temp assembly
|
||
|
||
- Common Assemblies
|
||
|
||
- Mech Connections up to 100A
|
||
|
||
- AL flex
|
||
|
||
- Go to any length based one (30 down)
|
||
|
||
- Delete anything past 7 in assembly
|
||
|
||
- 6 and 7 is where you modify your wires
|
||
|
||
- ADD ANOTHER MECH CONNECTION AND REPEAT SO YOU GET BOTH PANELS
|
||
|
||
- Top assembly is gen circuits
|
||
|
||
- Bottom assembly is FCU/AHU
|
||
|
||
- Go back to CA 26.31.11 - Add stairwell riser
|
||
|
||
- Delete everything in DAS assembly except the BOX & \"16x 16x...\"
|
||
|
||
- Make \"16x 16x...\" Fct.1 = 1 & Fct.2 = 10
|
||
|
||
**Hotel Notes**
|
||
|
||
[MULTI CONDUCTOR HOMERUNS]{.underline} Build in \"[TEMP
|
||
ASSEMBLIES]{.underline}\"ex//
|
||
|
||
- No Unit Panels?
|
||
|
||
- \"Circuit Homeruns\" =\" Multi Conductor Homeruns\"
|
||
|
||
- \$\$\$ Special Order \$\$\$
|
||
|
||
- How many Homeruns?
|
||
|
||
- How many circuits are being run in each HR?
|
||
|
||
- Are we running \'In Deck\' or \'Over Head\'? - Electrical
|
||
Notes\>Legends\>EMT or PVC?
|
||
|
||
|
||
|
||
- Multiple Circuits in HR Share a Neutral = [#Black wires]{.mark} + \#
|
||
Green Wires
|
||
|
||
- Formula: **\[Home Run\]** = [{#Black Wires}]{.mark} + {#Green Wires}
|
||
|
||
>
|
||
|
||
- Formula: [{#Black Wires}]{.mark} = [(# Circuits)\*2 + 1]{.mark}
|
||
|
||
- Formula: {#Green Wires} = (1Green \* (# circuits))
|
||
|
||
>
|
||
|
||
- Formula: **\[Home Run\]** = [{(# Circuits)\*2 + 1}]{.mark} + {(1Green
|
||
\* (# circuits))}
|
||
|
||
>
|
||
|
||
- Ex\^\^// 4 circuits 20A
|
||
|
||
- [{(4)\*2+1}]{.mark} + {1\*(4)} = 13 total
|
||
|
||
- SF
|
||
|
||
- Under 100\' = #10 Assembly
|
||
|
||
- Over 100\' = #12 Assembly
|
||
|
||
{width="1.475in" height="0.9083333333333333in"}
|
||
|
||
|
||
|
||
{width="1.7666666666666666in" height="1.0in"}
|
||
|
||
**Hotel Notes**
|
||
|
||
[Sub feeds]{.underline}
|
||
|
||
- No Unit Panels?
|
||
|
||
- \"Circuit Homeruns\" =\" Multi Conductor Homeruns\"
|
||
|
||
- \$\$\$ Special Order \$\$\$
|
||
|
||
- How many Homeruns?
|
||
|
||
- How many circuits are being run in each HR?
|
||
|
||
- Are we running \'In Deck\' or \'Over Head\'? - Electrical
|
||
Notes\>Legends\>EMT or PVC?
|
||
|
||
|
||
|
||
- Multiple Circuits in HR Share a Neutral
|
||
|
||
- Formula: \[ { (# Circuits)\*2 + 1} = {Black Wires} + Green \]
|
||
|
||
- Ex\^\^//
|
||
|
||
- (4 Circuits)2 + 1 = 9black + 1green = 10total
|
||
|
||
- SF
|
||
|
||
- Under 100\' = #10 Assembly
|
||
|
||
- Over 100\' = #12 Assembly
|
||
|
||
{width="7.05in" height="2.3833333333333333in"}
|
||
|
||
|
||
|
||
## LAST CHECK
|
||
|
||
Friday, December 15, 2023
|
||
|
||
10:09 AM
|
||
|
||
If you got to the Extension tab in Accubid, right click on screen and
|
||
select Group. Then select Phase
|
||
|
||
|
||
|
||
{width="5.875in"
|
||
height="3.8333333333333335in"}
|
||
|
||
|
||
|
||
This shows up then\...
|
||
|
||
|
||
|
||
{width="6.308333333333334in"
|
||
height="1.2166666666666666in"}
|
||
|
||
|
||
|
||
double click in Sub Feeders
|
||
|
||
|
||
|
||
{width="5.866666666666666in"
|
||
height="4.291666666666667in"}
|
||
|
||
|
||
|
||
|
||
|
||
you will then see all items in subfeeds
|
||
|
||
|
||
|
||
for MC subfeeds, you will see CONN FLEX DC SQUEEZE STRAIGHT
|
||
|
||
|
||
|
||
there are 2 in each assembly
|
||
|
||
|
||
|
||
{width="5.0in"
|
||
height="1.9083333333333334in"}
|
||
|
||
|
||
|
||
|
||
|
||
just add the different sizes together and divide by 2 and you will have
|
||
the total number of subfeeds
|
||
|
||
|
||
|
||
|
||
|
||
**MTS/ATS**
|
||
|
||
- Mechanical/Automatic Transfer SW
|
||
|
||
- Build in *DISTRIBUTION*
|
||
|
||
- Label: \"#Amps ATS\" (ex// 300A ATS)
|
||
|
||
> *15.Transfer SW*
|
||
|
||
i. *1 or 3 Phase*
|
||
|
||
ii. *Amps*
|
||
|
||
iii. *Finish*
|
||
|
||
- Three Connections:
|
||
|
||
- Generator
|
||
|
||
- Panel
|
||
|
||
- Panel
|
||
|
||
## (SWITCH GEAR)
|
||
|
||
**Transformers XFMRs**
|
||
|
||
- *CA\>31 Distribution\>3. Transformers*
|
||
|
||
- Big XFMR\>Item Database
|
||
|
||
- Pad mount = Floor
|
||
|
||
- Round to nearest Amperage
|
||
|
||
**Panels**
|
||
|
||
1. Check Panel Schedules and Find a Busy example for each Amps.
|
||
|
||
2. Create a Table in notes following the structure below
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
3. Build in *Distribution*
|
||
|
||
1. *Distribution Panels* 300A-\>400A
|
||
|
||
<!-- -->
|
||
|
||
3. *Based on Amps. (Click okay)* 100A-\>4W
|
||
|
||
4. *Connections (1p/3phase) Count = QTY.* 150A-\>225A
|
||
|
||
i. (CA.29.14)
|
||
|
||
|
||
|
||
*\*\*\*KEYNOTE\*\*\**
|
||
|
||
- Double Tub = Two Cages
|
||
|
||
Monday, March 27, 2023
|
||
|
||
11:06 AM
|
||
|
||
**Accubid**
|
||
|
||
- Area: By Level
|
||
|
||
- Phase & System: SWG
|
||
|
||
{width="3.7916666666666665in"
|
||
height="0.95in"}{width="2.25in" height="1.275in"}
|
||
|
||
**Set-Up**
|
||
|
||
- Livecount -\> Riser Diagram
|
||
|
||
- Blue Beam -\> Schedules/Panels
|
||
|
||
- Accubid -\> \"Ben - Test\"
|
||
|
||
- Copy Paste all Temp. Assemblies
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
**Wireway/Troughs/Gutter**
|
||
|
||
- System -\> Electrical
|
||
|
||
- Phase -\> BOH
|
||
|
||
- ID.16.27.3
|
||
|
||
- Wireway-Chase Nipple-Panel
|
||
|
||
**Meter Centers**
|
||
|
||
- Built-in *Distribution*
|
||
|
||
- 3.12.(Amps)
|
||
|
||
- **Count Meter Stacks**
|
||
|
||
- Add in Factor 1
|
||
|
||
- Delete Zero Values
|
||
|
||
{width="0.575in"
|
||
height="0.6833333333333333in"}{width="1.4166666666666667in"
|
||
height="1.0083333333333333in"}
|
||
|
||
**Switch Board(s)**
|
||
|
||
- Split = 2+ Sections-\>
|
||
|
||
- Ranges: 1-8
|
||
|
||
- Build in *Distribution*
|
||
|
||
- Label: (#Amps \"SWG\" - #Sections)
|
||
|
||
- Switchgear & Meter Centers
|
||
|
||
i. Amps
|
||
|
||
ii. Section(s)
|
||
|
||
iii. Connections
|
||
|
||
1. On Riser or SWBD Panel
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
{width="0.7833333333333333in"
|
||
height="0.5083333333333333in"}{width="0.4083333333333333in"
|
||
height="0.25in"}
|
||
|
||
**Utility Meter**
|
||
|
||
- Temp. Assembly
|
||
|
||
2. Meter
|
||
|
||
**SPDs**
|
||
|
||
- Surge Protective device
|
||
|
||
- Shown on SWBDs
|
||
|
||
- TEMPORARY ITEMS
|
||
|
||
- CA.29.14.
|
||
|
||
- Add #250 and #1
|
||
|
||
- Delete additional Wires
|
||
|
||
- Change Fct. 1
|
||
|
||
- #250 (8)
|
||
|
||
- #1 (2)
|
||
|
||
**\*\*\*Generator (System& Area GEN)\*\*\***
|
||
|
||
- ID.16.13. Type
|
||
|
||
- Add hours in Factor
|
||
|
||
- Installation (Change Count to the KWA)
|
||
|
||
**Fire Pump Controller & FP**
|
||
|
||
- Temp. Assembly
|
||
|
||
3. Fire Pump Controller
|
||
|
||
4. Fire Pump
|
||
|
||
{width="0.6833333333333333in"
|
||
height="0.7833333333333333in"}
|
||
|
||
**Disconnects**
|
||
|
||
- Disconnects: CA.31.5
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
Generator Set Up
|
||
|
||
{width="3.05in" height="1.5083333333333333in"}
|
||
|
||
|
||
|
||
## (SWITCH GEAR 2.0)
|
||
|
||
**MTS/ATS 1200A+**
|
||
|
||
- Take off 1200A MTS/ATS
|
||
|
||
- Add
|
||
|
||
- CA.30.14.AMPS
|
||
|
||
- Multiply the Factor 1 by 3
|
||
|
||
- Delete 1200A
|
||
|
||
**Missing Panel or SWB?**
|
||
|
||
- Follow the feeder to the other SWG Panel
|
||
|
||
- That doesn\'t work?
|
||
|
||
- Use the feeder size to decide the amps
|
||
|
||
**Transformers 300KVA+**
|
||
|
||
- *ID\>Distribution\>Transformers*
|
||
|
||
- Pad mount = Floor
|
||
|
||
- Round to nearest Amperage
|
||
|
||
Monday, March 27, 2023
|
||
|
||
11:06 AM
|
||
|
||
**Items to AVOID**
|
||
|
||
- TAP BOX
|
||
|
||
- BUS DUCT
|
||
|
||
- VAULT ROOM
|
||
|
||
- ANYTHING FPL
|
||
|
||
- GROUNDING
|
||
|
||
- ELEVATOR ROOM
|
||
|
||
**Docking Station = Panel**
|
||
|
||
**Disconnects 1200A+**
|
||
|
||
- Take off a piece of SWG that matches the Amps
|
||
|
||
- Don\'t add terminations
|
||
|
||
**Disconnects**
|
||
|
||
- Taken off in SWG
|
||
|
||
- CA.29.5
|
||
|
||
- (3 200/200) = 3Phase 200A
|
||
|
||
- Outside/Garage = NEMA 3R
|
||
|
||
- Materials deleted out in the back end
|
||
|
||
**CT Cabinet & C.T. Cabinet**
|
||
|
||
Temp. Assembly -\> CT Cabinet
|
||
|
||
{width="0.21666666666666667in"
|
||
height="0.9666666666666667in"}{width="1.0416666666666667in"
|
||
height="0.175in"}{width="0.21666666666666667in"
|
||
height="0.9083333333333333in"}
|
||
|
||
**SWG 1200A+**
|
||
|
||
- Take off a piece of SWG that matches the Amps
|
||
|
||
- Don\'t add terminations
|
||
|
||
{width="0.16666666666666666in"
|
||
height="0.9in"}{width="0.16666666666666666in"
|
||
height="0.48333333333333334in"}{width="0.5083333333333333in"
|
||
height="0.16666666666666666in"}
|
||
|
||
**Calc. KVA for XFMR**
|
||
|
||
-
|
||
|
||
-
|
||
|
||
{width="1.05in"
|
||
height="0.16666666666666666in"}{width="6.525in"
|
||
height="2.125in"}
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
\>EX//\
|
||
(120/208V)
|
||
|
||
I = 120, V = 208, KVA = 45
|
||
|
||
> **SWG 6,000A+**
|
||
|
||
a. 6,000A SWG (T.O. 4K + 2K SWG) You can add the 4000A section + a
|
||
2000A section or you can look at the difference in labor between a
|
||
2000 and 4000A and then add an item that is just distribution labor
|
||
and put that item into the assembly. Either method works.
|
||
|
||
|
||
|
||
1. Meter Center: Distribution: use the average count of individual
|
||
meters for all meter centers and create it based on Distribution
|
||
Panel. EX. 85 METERS, CHOOSE 8 METER STACK CHANGE FACTOR TO 10,
|
||
CHOOSE METER STACK 5 ONE FACTOR AND ERASE ALL OTHER STACKS. FOR THE
|
||
TERMS PICK AVERAGE OF UNIT PANELS, EX. 125A THEN FACTOR AS MANY
|
||
UNITS ON THAT METER CENTER, EX ABOVE 85.
|
||
|
||
a. Located in Switchgear & Meter Centers\>Meter Centers\>(Pick the
|
||
Appropriate Metering Section)
|
||
|
||
b. In Measure Takeoff with the Average meters, using the meter
|
||
stacks, get to the average count of the meter stack
|
||
|
||
c. Erase the stacks that it\'s not used.
|
||
|
||
d. 11-30-21. Be sure to add the terminations from the Load Center
|
||
to the Meters. Sub feeds only cover the side of the panel. When
|
||
doing this, just use an average number of amp size.
|
||
|
||
e. Make sure you go to Distribution Accessories: Terminations -
|
||
Power\> Wire Size (Based on Avg Subfeed Wire Size.)
|
||
|
||
<!-- -->
|
||
|
||
1. **Generator**
|
||
|
||
a. \- Class 12 = 12 Electric?
|
||
|
||
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
|
||
|
||
## (SWITCH GEAR 3.0)
|
||
|
||
Tuesday, May 7, 2024
|
||
|
||
7:20 AM
|
||
|
||
|
||
|
||
|
||
|
||
**Metering Cabinet**
|
||
|
||
- Determine how many meters inside
|
||
|
||
- Find what powers it
|
||
|
||
- If no feeder shown, look at the nearby gear and see if it is three
|
||
phase or single phase
|
||
|
||
- If single phase keep single phase
|
||
|
||
- If three phase keep three phase
|
||
|
||
- Take off as a 200A panel (labor purposes)
|
||
|
||
- Add terminations based on the number of meters
|
||
|
||
- Run about 20ft or so per termination
|
||
|
||
- Run #12 for each
|
||
|
||
- Again single vs three phase as shown above
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
|
||
|
||
## SWG Script
|
||
|
||
{width="6.8in" height="6.416666666666667in"}
|
||
|
||
Thursday, October 12, 2023
|
||
|
||
10:26 AM
|
||
|
||
|
||
|
||
|
||
|
||
Switchgear (Hanover Autry as Example)
|
||
|
||
- Found in Riser
|
||
|
||
- Accubid setup: For Generator (Area: Generator, Bldg, Gen., Bldg)
|
||
|
||
- Create Distribution - \"Building\" -\> Then Look up the kind of
|
||
generator being used (ex. \"Gen 500kW Diesel\")
|
||
|
||
- 17.(1-4).\_\_\_ \--\> OK \--\> Add Generator Set Up + a
|
||
Termination
|
||
|
||
- Convert kW to amps for the termination
|
||
|
||
- Other equipment \"Area\" will be wherever it is located and the System
|
||
will be Switchgear
|
||
|
||
- Disconnect -\> CA.27.5.\_\_ \--\> NEMA1 is interior, NEMA 3R is
|
||
exterior
|
||
|
||
- Can copy FP Controller and SPD from the ASSEMBLIES job in accubid
|
||
|
||
- TVSS aka Source Protection Device (SPD)
|
||
|
||
- ATS -\> Transfer switch -\> 3PH (based on schedule). If it is not
|
||
found on the schedule, use the one closest to
|
||
it (Create-\>18.(1-2).\_\_)
|
||
|
||
- Switchgear -\> Create -\> 3.2.\_\_
|
||
|
||
- Make sure to pay attention to the wires for the panel (3 or 4), as
|
||
well as the \# of circuits in the panel (Ex. 42 or 84).
|
||
|
||
- Then add the terminations needed. (EX. In a 200A 42ckt PNL with
|
||
multiple circuits of 20/30/60A, I would add 20/35/60A Terminations.
|
||
Again, based on the schedule and will need to look at the phase that
|
||
is needed.
|
||
|
||
- When adding the terminations, take a roundabout average so this
|
||
could be used in the future on this project
|
||
|
||
- Transformer \--\> 27.3.\_\_
|
||
|
||
- Will need to pick the last one dependent on what the riser calls for
|
||
on the particular transformer. Seems like we will typically pick the
|
||
Pad Mount, but make sure moving forward on other projects
|
||
|
||
- Double check on how to find the \"Meter Base\"
|
||
|
||
- Meter Center -\> Dist. -\> 2.12.\_\_
|
||
|
||
- Figure out the meter stack being used and then delete the others.
|
||
|
||
- Then add the terminations (Single Phase) needed via the USF
|
||
|
||
- Does not need to be exactly based on the amount of USF but an
|
||
average.
|
||
|
||
- Wireway -\> ID.16.27.3
|
||
|
||
|
||
|
||
### [POWER TERMINATIONS ONLY FOR BRANCH CIRCUITS]{.mark}
|
||
|
||
|
||
|
||
|
||
|
||
{width="1.8333333333333333in" height="1.1in"}
|
||
|
||
## (FEEDERS)
|
||
|
||
**\*1685 Collins Hotel\***
|
||
|
||
### Grounding
|
||
|
||
- Accubid: In Feeders Area
|
||
|
||
- Drawing: Measure on site
|
||
|
||
<!-- -->
|
||
|
||
- \"Around the main electrical rooms to stacked\"
|
||
|
||
<!-- -->
|
||
|
||
- Adder: \# of Levels x \# of Stacked Electrical Rooms
|
||
|
||
- Takeoff:
|
||
|
||
- CA.10. Grounding
|
||
|
||
- 11 (Conduit)
|
||
|
||
- 3/0
|
||
|
||
- 30/31 (Details 4 Grounding Bar)
|
||
|
||
- Qty = 1
|
||
|
||
- 33
|
||
|
||
### TRANSFORMER \"XFMR\"
|
||
|
||
- Flex going into and out of
|
||
|
||
- Usually can be schedule-based
|
||
|
||
- Add EMT If in same room
|
||
|
||
Friday, May 26, 2023
|
||
|
||
8:53 AM
|
||
|
||
### BUILDINGS OVER 20 Floors
|
||
|
||
- Cable Support: Based on Code
|
||
|
||
- Link in the project OneNote
|
||
|
||
- \# Sets = \# of Supports
|
||
|
||
- ID.1.35.2
|
||
|
||
### [Cable Support(2.0)]{.mark}
|
||
|
||
{width="3.35in"
|
||
height="0.9916666666666667in"}{width="1.6583333333333334in"
|
||
height="2.7416666666666667in"}
|
||
|
||
### Takeoff
|
||
|
||
- Measurement & Count on Riser
|
||
|
||
- Label: Transformer-\> XFMR
|
||
|
||
- \"XFMR to MSBH1\"
|
||
|
||
{width="1.0583333333333333in" height="1.15in"}
|
||
|
||
### Sleeving (Excel)
|
||
|
||
- Second Floor and Above
|
||
|
||
- Same Floor no Sleeve
|
||
|
||
- Takeoff:
|
||
|
||
- ID.31 Hilti
|
||
|
||
- P = Plastic =\> Concrete
|
||
|
||
- M = Metal =\> Wood Frame
|
||
|
||
- Milan Calculator
|
||
|
||
- Round 1\" to 2\"
|
||
|
||
- Sleeve for empty conduit? YES
|
||
|
||
- Sleeving for Bus Duct? NO
|
||
|
||
- Sleeving for MC Feeders? NO
|
||
|
||
### Manuel Disconnect
|
||
|
||
- CA.29.5
|
||
|
||
- 3(200/200) = 3Phase 200A
|
||
|
||
### Underground Assemblies
|
||
|
||
- w/
|
||
|
||
- s/ w/ Strut
|
||
|
||
### Fire Pump
|
||
|
||
- Always Has Ground
|
||
|
||
- FP Controller to Pump in electrical
|
||
|
||
- CA.23.PVC/EMT
|
||
|
||
### Generator
|
||
|
||
- Accubid: Area & System = Generator
|
||
|
||
- Phase: BOH/Site/Garage
|
||
|
||
- Build. Add termination. On Riser. Adder of 10
|
||
|
||
>
|
||
|
||
- Generator to ATS
|
||
|
||
- CA.22.12
|
||
|
||
### Feeders
|
||
|
||
- Accubid: All Feeders & Building
|
||
|
||
- Stacked Electrical room = 10\' Adder
|
||
|
||
- Feeding Panel in Same Electrical Room\> USE 30\' EMT
|
||
|
||
### Disconnects
|
||
|
||
- Count: 2 (1 Before, 1 After)
|
||
|
||
### FPL Vault
|
||
|
||
- Feeds from here are secondaries
|
||
|
||
- 1900 Biscayne
|
||
|
||
### Chase Nipple
|
||
|
||
- Build in \"Feeder Conduit and Wire\"
|
||
|
||
- Feeders, use Amps to find Conduit Size
|
||
|
||
### Solar Panels
|
||
|
||
- Photovoltaic (PV)
|
||
|
||
- Conduit from MER to roof
|
||
|
||
### Example
|
||
|
||
- 5 Sets of [4]{.underline} #600 \> 3Phase (3Hot + Neutral)
|
||
|
||
- 5 Sets of [3]{.underline} #600 \> 1Phase
|
||
|
||
{width="4.1in"
|
||
height="1.65in"}{width="1.1916666666666667in"
|
||
height="1.1in"}
|
||
|
||
### Emergency
|
||
|
||
- MI Cable vs 2HR rated
|
||
|
||
- (mineral insulated cable)
|
||
|
||
### WHEN IN DOUBT 2% Voltage Drop
|
||
|
||
### Voltage Drop
|
||
|
||
- VD = (Amps\*Length\'\*Ohms)/Phase
|
||
|
||
|
||
|
||
## (FEEDERS 2.1)
|
||
|
||
|
||
|
||
**How to Make A Feeder**
|
||
|
||
|
||
|
||
- (Accubid) Takeoff: Feeder conduit and wire
|
||
|
||
|
||
|
||
- Find the size & Type of the conduit ( ex: 2\" PVC UG)
|
||
|
||
- Parallel runs are \# OF SETS
|
||
|
||
- Link length
|
||
|
||
- Closeout assembly
|
||
|
||
|
||
|
||
- Click on it again
|
||
|
||
- Add Wire (For AL use \"XHHW Wire AL\" (7))
|
||
|
||
- Conductors (Black & White) \*ONLY LENGTH\*
|
||
|
||
- Refer to table
|
||
|
||
- Ground (Green) \*ONLY LENGTH\*
|
||
|
||
- = FACTOR 1: 1 Conductor
|
||
|
||
|
||
|
||
- Add Power Termination for Wire size **(ID17.6.)**
|
||
|
||
- Count: (# of sets) x (# of Wires) x (2)
|
||
|
||
- For Ground, White, and black
|
||
|
||
- Finish and Name
|
||
|
||
Friday, September 1, 2023
|
||
|
||
7:09 AM
|
||
|
||
|
||
|
||
### BREAKDOWN of Feeder Wire Makeup
|
||
|
||
------------------------------------------------------------------------
|
||
3 - Phase 1 - Phase
|
||
------------- ----------------------------- -------------- -------------
|
||
Makeup Conductors 4 3
|
||
|
||
Ground 1 1
|
||
|
||
Wire White (Neutral) 1 1
|
||
|
||
Black (Power/Phases) 3 2
|
||
------------------------------------------------------------------------
|
||
|
||
|
||
|
||
### Extra items
|
||
|
||
- \*SPACERS (4 x 3\") -SEPARATE PAGE-
|
||
|
||
|
||
|
||
1. SPACERS IN PVC FEEDERS ID(1.20.8)
|
||
|
||
a. Spacers were added in all PVC UG feeders -- the spacers you use
|
||
1 for every 2 conduits but make it a length-based item and make
|
||
the factor 2 column 8. This will divide the length of the feeder
|
||
by 8 bc you need spacers every 8'.
|
||
|
||
i. Ex//
|
||
|
||
ii. {width="6.975in" height="3.45in"}
|
||
|
||
### POWER TERMINATION CALCULATIONS
|
||
|
||
{width="8.633333333333333in"
|
||
height="6.091666666666667in"}
|
||
|
||
### Feeder Info
|
||
|
||
- [The count:]{.underline} in Feeders is the extra feet of wire used
|
||
inside the panel to get to the termination
|
||
|
||
- [EMT Vertical Feeders:]{.underline} don\'t need Strut because the
|
||
sleeves hold the conduit
|
||
|
||
|
||
|
||
{width="0.2in" height="3.066666666666667in"}
|
||
|
||
## (FEEDERS 2.0)
|
||
|
||
**Conduit Specs**
|
||
|
||
- \*\*\*FLORIDA\*\*\*
|
||
|
||
- Typically PVC
|
||
|
||
- Possible Options
|
||
|
||
- PVC
|
||
|
||
- PVC UG EMT OH
|
||
|
||
- MC
|
||
|
||
- ...
|
||
|
||
**Set-Up:**
|
||
|
||
Friday, September 1, 2023
|
||
|
||
7:09 AM
|
||
|
||
**Wiring Specs**
|
||
|
||
- Aluminum vs. Copper
|
||
|
||
- \"Feeder Schedule\"
|
||
|
||
- Proposal -\> Distribution & Feeders
|
||
|
||
- Can be sized in Copper and sold in Aluminum (Base off Amps)
|
||
|
||
{width="1.6583333333333334in"
|
||
height="2.7416666666666667in"}{width="1.1916666666666667in"
|
||
height="1.1in"}
|
||
|
||
House Panels (Corridor, BOH, Amenity)
|
||
|
||
|
||
|
||
Meter Center (Power for SFs)
|
||
|
||
|
||
|
||
Emergency Equipment (Stuff powered by Generator)
|
||
|
||
|
||
|
||
**MEDIUM VOLTAGE**
|
||
|
||
- Not gone over
|
||
|
||
- Primaries from the utility company
|
||
|
||
- Normally excluded
|
||
|
||
-----------------------------------------------------------------------
|
||
NG G
|
||
-------------------------------------- --------------------------------
|
||
3PH + 1 Neutral 1PH + 0 Neutral
|
||
|
||
BOH (Distribution) Residential
|
||
-----------------------------------------------------------------------
|
||
|
||
|
||
|
||
{width="11.383333333333333in"
|
||
height="3.7583333333333333in"}
|
||
|
||
|
||
|
||
**[Cable Support (Conduit)]{.mark}**
|
||
|
||
- Based on the **height of the building** not the length of your feeder
|
||
|
||
- Use whenever over 85\'
|
||
|
||
- Use the conduit chart
|
||
|
||
- Linked in the one note feeder section (Below)
|
||
|
||
- In general info
|
||
|
||
- Go off of wire size
|
||
|
||
- Count = number of sets x the number of times it surpasses the height
|
||
listed in the chart
|
||
|
||
- Ex: 3 sets x every time height passes 100\'
|
||
|
||
- Verify total number of wires in feeder (hots + neutral + ground)
|
||
|
||
- ID.1.37
|
||
|
||
- 2 or 4
|
||
|
||
|
||
|
||
## (FEED BACK)
|
||
|
||
Thursday, March 14, 2024
|
||
|
||
3:16 PM
|
||
|
||
Extra Information FEEDS
|
||
|
||
- Feeders are Length and Count based. The count is 10\' of wire make up.
|
||
This is included to make sure the wire can reach the termination
|
||
inside the panel.
|
||
|
||
- Hilti can support EMT Vertical sleeves
|
||
|
||
>
|
||
|
||
ROUTING FOR GARAGE FEEDS
|
||
|
||
- All buildings have a Garage as the first floor. I just wanted to
|
||
double-check the routing of the feeders that go up multiple
|
||
floors -- routing looks good to me. Squared off and don't have any
|
||
ramps. I am going to add some trapeze systems for these to help
|
||
support them going through the garage. I use Common Assemblies #59,
|
||
then I typically always use ½" bc its normally for larger conduits,
|
||
then I do the 8' o/c spacing the support every 8'. Then use from
|
||
concrete or steel depending on the structure. Then it gives you sizing
|
||
which I can show you at a later date in more detail how to calculate.
|
||
|
||
**Feedback for Feeders**
|
||
|
||
Missed terminations on secondaries
|
||
|
||
Wrong calc of terminations when building feeders (sets x #conductors x
|
||
2), missed on all feeders.
|
||
|
||
Wrong manhole, always note said \"coordinate w/ civil\" need to check.
|
||
Used 5x9x6\', drwgs calls for 8x16x10\', also missed 2 on takeoff
|
||
|
||
Going forward check for overall drawings to do the measurements ilo
|
||
connecting sections
|
||
|
||
|
||
|
||
## (PRIMARIES)
|
||
|
||
Primaries
|
||
|
||
- Utility to Utility
|
||
|
||
- Need to determine the amount of conduit, sizing, and spacing
|
||
|
||
- Default would be 3\" spacers (already in assembly) but look for a
|
||
detail
|
||
|
||
- Common assemblies. Empty Conduit. PVC. 15-28
|
||
|
||
- Count the number of conduits
|
||
|
||
- Aka the number of sets
|
||
|
||
- Count the number of rows
|
||
|
||
- **ROWS X NUMBER OF SETS = COUNT/TAKEOFF IN ACCUBID**
|
||
|
||
- If not in default, you will have to build from scratch in Feeder
|
||
Conduit and Wire
|
||
|
||
|
||
|
||
EX:
|
||
|
||
|
||
|
||
{width="4.833333333333333in"
|
||
height="2.95in"}
|
||
|
||
|
||
|
||
\(3\) 6\" conduit
|
||
|
||
\(2\) rows
|
||
|
||
|
||
|
||
6 Sets of 6\" PVC
|
||
|
||
Wednesday, October 18, 2023
|
||
|
||
11:55 AM
|
||
|
||
### SINGLE PHASE
|
||
|
||
|
||
|
||
### Utility to XFMR = Primary
|
||
|
||
### Utility to Utility = Secondary
|
||
|
||
|
||
|
||
Primaries (Utility Base) (At least one Spare)
|
||
|
||
1. NEC only starts at Secondaries
|
||
|
||
2. Utility Drawings (Civil)
|
||
|
||
3. Redundant systems \"Double Feed\"
|
||
|
||
|
||
|
||
## (SECONDARIES)
|
||
|
||
Wednesday, December 13, 2023
|
||
|
||
9:36 AM
|
||
|
||
**Secondaries \*3 PHASE\***
|
||
|
||
### Drawing = Riser
|
||
|
||
### Accubid: \^Site+ & System-Secondaries/Primaries
|
||
|
||
### Located: In the Proposal (Berried 3\'-6\' underground)
|
||
|
||
### Adders: 15\'
|
||
|
||
### Trace: Secondaries
|
||
|
||
### NO GROUND (Utility Company has their own Ground system)
|
||
|
||
### -From Utility Transformer
|
||
|
||
### No xfmr assembly needed for Utility Company xfmr
|
||
|
||
### Utility=Site=Secondary=Something from outside= 3Phase
|
||
|
||
{width="6.758333333333334in"
|
||
height="5.55in"}
|
||
|
||
**TEXAS**
|
||
|
||
### Adders: 40\'
|
||
|
||
**\$\$\$ Concrete encased \$\$\$**
|
||
|
||
### Cost Driver
|
||
|
||
### Protect Secondaries to power building
|
||
|
||
###
|
||
|
||
**Cable Trey for Sec.**
|
||
|
||
### Use an OH assembly
|
||
|
||
###
|
||
|
||
|
||
|
||
## (PULL BOXES)
|
||
|
||
Tuesday, November 19, 2024
|
||
|
||
7:19 AM
|
||
|
||
{width="3.283333333333333in"
|
||
height="2.7083333333333335in"}
|
||
|
||
**How to calculate pull boxes.**
|
||
|
||
|
||
|
||
Try always use standard box sizes (4\", 6\", 8\", 10\", 12\", 16\",
|
||
20\", 24\" all by the same size HxW), then the large has to be 8 times
|
||
the size of the conduit if goes straight or 6 times if goes angle.
|
||
|
||
|
||
|
||
|
||
|
||
{width="6.416666666666667in" height="2.6in"}
|
||
|
||
|
||
|
||
Example:
|
||
|
||
for a run of (4)4\"
|
||
|
||
|
||
|
||
With a separation of 3\" in between both sides, it will be 3+4+3+4+3 =
|
||
17 but since the next standard is 20\" you will use 20\"x20\"
|
||
|
||
and large will be:
|
||
|
||
if straight 4\" times 8, so: 20x20x32
|
||
|
||
if angle 4\" times 6, so 20x20x24
|
||
|
||
**PULL BOX**
|
||
|
||
SITE: ID.21.3
|
||
|
||
- These are larger boxes
|
||
|
||
- Typically measured using feet
|
||
|
||
INDOOR: ID.6.24
|
||
|
||
|
||
|
||
|
||
|
||
> {width="6.108333333333333in"
|
||
> height="8.133333333333333in"}
|
||
|
||
## Note Pull Box
|
||
|
||
Tuesday, November 19, 2024
|
||
|
||
10:38 AM
|
||
|
||
|
||
|
||
## (BUS DUCT)
|
||
|
||
COPPER:\
|
||
|
||
|
||
{width="4.941666666666666in"
|
||
height="0.5666666666666667in"}
|
||
|
||
Thursday, March 16, 2023
|
||
|
||
3:52 PM
|
||
|
||
|
||
|
||
> BUS DUCT - (Includes Tap Box)
|
||
>
|
||
> CA.31.10.Size
|
||
>
|
||
> Fill in Fct1 fields accordingly:
|
||
>
|
||
>
|
||
>
|
||
> {width="7.016666666666667in" height="3.225in"}
|
||
>
|
||
>
|
||
>
|
||
>
|
||
>
|
||
>
|
||
>
|
||
> BUS STUBS/STABS:
|
||
|
||
- If Vault is directly below - Use 1\' and delete Curb
|
||
|
||
- Secondaries (if coming out of FPL Vault)
|
||
|
||
- Use Bus Duct assembly
|
||
|
||
- Remove #2-7 from assembly, leaving only Bus duct, spring hanger, and
|
||
monolithic curb
|
||
|
||
>
|
||
>
|
||
> {width="7.058333333333334in"
|
||
> height="2.658333333333333in"}
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
These come in Pairs
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
Spring hangers: Hold the weight of the busduct. 1+ Floors
|
||
|
||
|
||
|
||
Monolithic Curb: Used for exposed Busduct (Not fed directly into gear)
|
||
|
||
|
||
|
||
|
||
|
||
## (LOW VOLTAGE)
|
||
|
||
### GENERAL
|
||
|
||
- Based off of Labor
|
||
|
||
- Include: Camera, Speakers, Wi-Fi
|
||
|
||
>
|
||
|
||
- Accubid: Systems are Important
|
||
|
||
|
||
|
||
- Speakers \> Drop Ceiling \> J-Hooks
|
||
|
||
|
||
|
||
- No Low Voltage Riser Takeoff
|
||
|
||
### Pathways & Raceways
|
||
|
||
- Almost always taken off on every job
|
||
|
||
- Check [Proposal]{.underline} to see if [Free wire]{.underline} was
|
||
[qualified]{.underline}
|
||
|
||
- Include
|
||
|
||
- Jhooks w/ Stub ups
|
||
|
||
- Conduit to device plate
|
||
|
||
### Access Control
|
||
|
||
- Card Readers
|
||
|
||
- Takeoff Individually
|
||
|
||
- Find Average
|
||
|
||
<!-- -->
|
||
|
||
- Door Contact
|
||
|
||
- Avoid
|
||
|
||
- Electrical Hinge
|
||
|
||
- Do not takeoff
|
||
|
||
Thursday, May 25, 2023
|
||
|
||
11:10 AM
|
||
|
||
|
||
|
||
### Audio Visual
|
||
|
||
- Anything Entertainment related.
|
||
|
||
- Speakers (For Music)
|
||
|
||
- TV (In Amenity/Lobby Areas)
|
||
|
||
>
|
||
|
||
|
||
|
||
**Pre-Wire WAP (Wifi) (CA.27.6.40)**
|
||
|
||
- Common Assemblies -\> Telecom -\> Screwless -\>
|
||
|
||
- 1D CAT6 + Spare (Best Practices), Free Wire Assy 200\'
|
||
|
||
- Choose your cat cable
|
||
|
||
>
|
||
|
||
- Put under LV-WAP system
|
||
|
||
### Stub Up Assemblies
|
||
|
||
- Run when Free Air is Qualified on Proposal
|
||
|
||
<!-- -->
|
||
|
||
- CA.27.8.6/7
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
- Parts: 1 Box, EMT Stubby, 2 J-Hooks
|
||
|
||
|
||
|
||
- CA.22.7
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
- Parts: 2 Boxes, EMT Stub, 1 J-hook/per 6\'
|
||
|
||
### Pull Boxes
|
||
|
||
- ID. 6. Boxes and Cabinets, 24. Junction Boxes & Industrial Cabinets
|
||
|
||
- Determine Nema rating needed
|
||
|
||
- Use Screw Cover
|
||
|
||
{width="2.975in" height="0.5in"}
|
||
|
||
### Unit Security
|
||
|
||
- Typically Pad Lock
|
||
|
||
- Aka Battery Mounted
|
||
|
||
- Aka no Rough-in
|
||
|
||
- Aka don\'t take off
|
||
|
||
**Conduit WAP**
|
||
|
||
- Length can counted together to MDF
|
||
|
||
- As opposed to individual homeruns back to MDF\>
|
||
|
||
{width="3.9166666666666665in" height="0.25in"}
|
||
|
||
|
||
|
||
{width="2.425in" height="3.875in"}
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
## (LV CARD READER)
|
||
|
||
### Single Door
|
||
|
||
Thursday, January 2, 2025
|
||
|
||
10:13 AM
|
||
|
||
{width="7.791666666666667in"
|
||
height="5.708333333333333in"}
|
||
|
||
> {width="7.175in" height="5.533333333333333in"}
|
||
|
||
1. CONDUIT BACK TO MDF/IDF
|
||
|
||
2. GANG Box for Power Supply
|
||
|
||
3. EMT from box to Door and LV Box
|
||
|
||
4. LV Box
|
||
|
||
### Double Door
|
||
|
||
- Almost the same thing as Single door
|
||
|
||
- +10\' of 3. \"EMT from box to Door and LV Box\"
|
||
|
||
- +1 4. \"LV Box\"
|
||
|
||
|
||
|
||
## (LV ONENOTE/PROPOSAL)
|
||
|
||
Thursday, January 2, 2025
|
||
|
||
9:48 AM
|
||
|
||
### Raceway Qualifications
|
||
|
||
{width="7.75in" height="3.0083333333333333in"}
|
||
|
||
- Check to see if this note is qualified on the proposal
|
||
|
||
- This is the green light to run EMT stub-up Assemblies with J-hooks
|
||
|
||
|
||
|
||
### WAP Prewire
|
||
|
||
{width="8.066666666666666in"
|
||
height="0.4083333333333333in"}
|
||
|
||
- This is to make sure to add Cat6 Cable to the WAP assemblies.
|
||
|
||
- Make sure to takeoff the CAT6 Separately in telecom (Ex// FSD)
|
||
|
||
>
|
||
|
||
|
||
|
||
{width="5.3in" height="5.125in"}
|
||
|
||
## (LV UNITS DETAILS)
|
||
|
||
Thursday, January 2, 2025
|
||
|
||
9:59 AM
|
||
|
||
|
||
|
||
{width="3.4916666666666667in" height="4.2in"}
|
||
|
||
|
||
|
||
### WAP Detail
|
||
|
||
- Deep Gang Box
|
||
|
||
- Leviton QuickPort In-Wall Bracket
|
||
|
||
- Leviton QuickPort Connector
|
||
|
||
>
|
||
|
||
- Ben - Test 1 (HEATING ASSEMBLY)
|
||
|
||
### MSDE Rec. Detail
|
||
|
||
>
|
||
|
||
- Ben - Test 1 (HEATING ASSEMBLY)
|
||
|
||
|
||
|
||
## (LIGHTING PROTECTION)
|
||
|
||
Thursday, January 2, 2025
|
||
|
||
10:30 AM
|
||
|
||
|
||
|
||
### Driving Enclosure
|
||
|
||
- Lighting Controller for LEDs
|
||
|
||
- Controls power to the lights
|
||
|
||
|
||
|
||
|
||
|
||
**Lightning Protection**
|
||
|
||
- PVC EC
|
||
|
||
- 1 1/4\"
|
||
|
||
- LPT - Lightning Protection
|
||
|
||
- Put a count on every corner of the building
|
||
|
||
- Length is height of building
|
||
|
||
- EX: 4 corners with a height of 100\' would be a 4 count of 400
|
||
|
||
|
||
|
||
|
||
|
||
## (TELECOM)
|
||
|
||
**TELECOM BACKBOARD**
|
||
|
||
- ID.12.17.6
|
||
|
||
- A-Bid: Telecom Backbone
|
||
|
||
### Site Low Voltage Duct Bank
|
||
|
||
-----------------------------------------------------------------------
|
||
JOB: PRESENT PROJECT
|
||
----------------------- -----------------------------------------------
|
||
DWG: DWG, YOUR WORKING ON
|
||
|
||
AREA: SITE
|
||
|
||
PHASE: SITE
|
||
|
||
SYSTEM: LVD-LOW VOLTAGE DUCTBANK
|
||
|
||
BID ITEM: 1-SITE
|
||
|
||
LAB FACTOR: STANDARD
|
||
-----------------------------------------------------------------------
|
||
|
||
|
||
|
||
- (4)4\" Conduits (Assumed if not shown)
|
||
|
||
- Stubbed 5\' outside of building footprint
|
||
|
||
- *Garden -* Outside of every building
|
||
|
||
Wednesday, September 13, 2023
|
||
|
||
8:48 AM
|
||
|
||
**SLEEVING**
|
||
|
||
- PVC
|
||
|
||
- EMT
|
||
|
||
- ETC...
|
||
|
||
**Corridor Conduit**
|
||
|
||
- EMPTY CONDUIT : MSDE TO IDF
|
||
|
||
- \"Average of subfeeds\"
|
||
|
||
- Add Conduit to Riser
|
||
|
||
>
|
||
|
||
- Choose Material
|
||
|
||
- Choose size
|
||
|
||
- Strut mount
|
||
|
||
**How to do Empty Conduit**
|
||
|
||
- FEEDER CONDUIT AND WIRE
|
||
|
||
- Choose Material
|
||
|
||
- Choose size
|
||
|
||
- Strut mount
|
||
|
||
**[\"Site\" LV Duct Bank]{.mark}**
|
||
|
||
- [Conduit from outside of building to MDF]{.mark}
|
||
|
||
- [SITE\^]{.mark}
|
||
|
||
- [System: Site Low Voltage Duct Bank]{.mark}
|
||
|
||
{width="2.8916666666666666in"
|
||
height="1.0916666666666666in"}
|
||
|
||
**Cable Spec**
|
||
|
||
- Cat \#
|
||
|
||
**SITE**
|
||
|
||
- All Conduit Exterior of the building is SITE
|
||
|
||
- Ex// EV Chargers, Irrigation pumps
|
||
|
||
**Pull boxes on Telecom Site**
|
||
|
||
- \"Tel Pullbox\" in Item Database
|
||
|
||
**Text Box:**
|
||
|
||
- Find IT room
|
||
|
||
- Telecom Riser Accubid
|
||
|
||
- Area: Lvl
|
||
|
||
- Phase: BOH
|
||
|
||
- System Telecom Backbone
|
||
|
||
**STUB UPS**
|
||
|
||
- CA. Telecom. 8. 6 or 7
|
||
|
||
- Take off by counts on Drawings
|
||
|
||
- 3/4\" or 1\" EMT Stub Up (Use 1\" if not specified)
|
||
|
||
- Unless plans state conduit home runs
|
||
|
||
- Already at 10\'
|
||
|
||
- Use 9 and 10 if over 10\'
|
||
|
||
- Count all telecom located in a wall
|
||
|
||
- Don't need for floorboxes
|
||
|
||
- Don't need to link
|
||
|
||
- Doesn't matter what wall type
|
||
|
||
- If more than 3 wires use 1\" conduit
|
||
|
||
**Micro Duct \| Inner Duct\*\* USE GP (CA.27.10.11-14)**
|
||
|
||
- For Future use (ex// Fiber)
|
||
|
||
- \"Average of subfeeds\"
|
||
|
||
- Run in Corridors
|
||
|
||
- One Line Item per Area per level
|
||
|
||
>
|
||
|
||
- Ex// Level 2 Area A got 20 Units
|
||
|
||
- Subfeed Average is 100\'
|
||
|
||
- Level 2 Area A Micro Duct = 2000\' Length and 20 Count
|
||
|
||
Telecom Backbone **[Riser]{.underline}**:
|
||
|
||
- Going forward for the riser backbone. It\'s better to utilize **[a
|
||
Typical and put 15']{.underline}** of the conduit riser on each floor
|
||
bc currently it has the entire riser on the mezzanine level. So when
|
||
Ops goes to release the conduit from the CBOM they are going to have
|
||
it all on the mezzanine level and not on every level where it\'s
|
||
needed
|
||
|
||
|
||
|
||
**Telecom Vault**
|
||
|
||
- Temp. Item
|
||
|
||
- \$1000, 12 Hours, Sort Code 200
|
||
|
||
>
|
||
|
||
|
||
|
||
## (TELECOM 2.0)
|
||
|
||
Thursday, September 19, 2024
|
||
|
||
11:27 AM
|
||
|
||
|
||
|
||
|
||
|
||
edit: for faceplate should say MOD instead of G
|
||
|
||
Mackenzie Wookey9/19/2024 10:11 AM
|
||
|
||
TELECOM RECEPTACLES
|
||
|
||
- Blue = Data
|
||
|
||
- White = Voice
|
||
|
||
- Quad Shield Cable = TV
|
||
|
||
- Mod Outlet = clippy things on back
|
||
|
||
- Module, F Connector SCTE Compliant = twist connector for coax (tv)
|
||
|
||
- F Connector RG-6 = Tube that connects to f connector
|
||
|
||
- Faceplate - look for G to determine number of ports
|
||
|
||
- Rest is rough in material
|
||
|
||
|
||
|
||
IF YOU NEED TO CHANGE THE NUMBER OF PORTS
|
||
|
||
- Delete the data, voice, or tv you don't need
|
||
|
||
- TV connectors too
|
||
|
||
- Bump up the mod outlet to the number of ports
|
||
|
||
- Make sure the face plate has the correct mod
|
||
|
||
- Modify the fct 1 of your cbl to have the correct cnt
|
||
|
||
- Ex: if you had 200\' each of data, voice, and tv
|
||
|
||
- You want 3 data ports instead
|
||
|
||
- Make the fct 1 of the blu cbl 600 to account for the loss in length
|
||
from the voice and tv
|
||
|
||
- Want to keep the same total length as og assembly (600)
|
||
|
||
|
||
|
||
|
||
|
||
MOD OUTLET
|
||
|
||
{width="1.9833333333333334in"
|
||
height="1.9833333333333334in"}
|
||
|
||
|
||
|
||
|
||
|
||
MODULE F CONNECTOR
|
||
|
||
{width="1.9833333333333334in"
|
||
height="1.9833333333333334in"}
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
F CONNECTOR RG-6
|
||
|
||
{width="1.9833333333333334in"
|
||
height="2.1333333333333333in"}
|
||
|
||
{width="0.925in" height="0.9166666666666666in"}
|
||
|
||
- 2 port can be the 1D/1V. Does not have to be counted multiple times.
|
||
If it's calling it for the TV location, the 1D/1CATV works.
|
||
|
||
- 4 port can be the above assembly with a two (2) count
|
||
|
||
|
||
|
||
|
||
|
||
(HOTEL NOTES)
|
||
|
||
Wednesday, February 8, 2023
|
||
|
||
3:38 PM
|
||
|
||
### Example Projects
|
||
|
||
1. The Dunes at Fort Lauderdale
|
||
|
||
<!-- -->
|
||
|
||
2. Seminole Casino Hotel
|
||
|
||
### UNITS
|
||
|
||
a. All Unit Rec. = 20A
|
||
|
||
### SubFeeds
|
||
|
||
1. Multi conductors
|
||
|
||
|
||
|
||
### Combination CO/ Smoke Detector
|
||
|
||
- Taken off as FA only HOTELS
|
||
|
||
- USE FA SMOKE DETECTORS
|
||
|
||
|
||
|
||
### PVC FIRE ALARM AS WELL
|
||
|
||
|
||
|
||
|
||
|
||
## (Stadiums/Entertainment/Data Centers)
|
||
|
||
Thursday, December 5, 2024
|
||
|
||
1:29 PM
|
||
|
||
## Stadiums/Entertainment/Data Centers
|
||
|
||
|
||
|
||
**LIGHTING CIRCUITS**
|
||
|
||
- Check the Voltage on the lighting panels
|
||
|
||
- 277 Volts up to 30 lights on 1 circuit
|
||
|
||
- 120 volts up to 15-18 lights on 1 circuit
|
||
|
||
|
||
|
||
\*double check home runs by going by drawing and
|
||
|
||
**\"DEEP BOXES\"**
|
||
|
||
- These are for all electrical Devices and Fixtures
|
||
|
||
- I.E. Switches, Receptacles., ...
|
||
|
||
>
|
||
|
||
- Replace \"4x 1 1/2\" SQ BOX 1/2\"-3/4\" COMB KO\" (ID: 6.3.1.2)
|
||
|
||
>
|
||
|
||
- W/
|
||
|
||
>
|
||
|
||
- \"4x 2 1/8\" SQ BOX 1/2\" - 3/4\" COMBO KO\" (ID: 6.3.1.9)
|
||
|
||
|
||
|
||
>
|
||
|
||
|
||
|
||
**\"PLASTIC BUSHING TO METAL BUSHING\"**
|
||
|
||
- These are for all electrical Devices
|
||
|
||
- I.E. Switches, Receptacles., ...
|
||
|
||
>
|
||
|
||
- Replace \"4x 1 1/2\" SQ BOX 1/2\"-3/4\" COMB KO\" (ID: 6.3.1.2)
|
||
|
||
>
|
||
|
||
- W/
|
||
|
||
>
|
||
|
||
- \"4x 2 1/8\" SQ BOX 1/2\" - 3/4\" COMBO KO\" (ID: 6.3.1.9)
|
||
|
||
|
||
|
||
|
||
|
||
## (CALCULATIONS)
|
||
|
||
Monday, November 4, 2024
|
||
|
||
6:26 AM
|
||
|
||
### Fuel Test (GEN)
|
||
|
||
- Half load = 12 Hours
|
||
|
||
- Half load = 24 Hours
|
||
|
||
|
||
|
||
(Tank/2)(36 Total Hours)(\$ per gallon)
|
||
|
||
### Box Size Calculations
|
||
|
||
- Largest Raceway x 8 = 8 Minimum Box Length
|
||
|
||
- (Longest Raceway x 6) + \# of sets = Box Width
|
||
|
||
>
|
||
|
||
EX// 4x4 SLVD
|
||
|
||
|
||
|
||
> (4)(8) = 32 Length
|
||
>
|
||
> (4)(6)+4+4+4 = 36 Width
|
||
>
|
||
>
|
||
>
|
||
> 36 x 32 Box
|
||
|
||
|
||
|
||
### Lighting Protection (High Rise)
|
||
|
||
- Empty Conduit
|
||
|
||
- Size
|
||
|
||
- Lengths
|
||
|
||
|
||
|
||
Sum(\"Height of every Corner\")
|
||
|
||
|
||
|
||
|
||
|
||
## PDI BEST PRACTICES PAGE
|
||
|
||
Monday, June 17, 2024
|
||
|
||
3:56 PM
|
||
|
||
|
||
|
||
**[Feeders]{.underline}**
|
||
|
||
- AL.
|
||
|
||
- PVC if allowed
|
||
|
||
**[Units]{.underline}**
|
||
|
||
- Decora Backsplash in kitchen
|
||
|
||
- 1 GFI per circuit, Ideally No GFIs
|
||
|
||
>
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
## (PRE-FAB)
|
||
|
||
**Romex**
|
||
|
||
- Prefab NOT Romex
|
||
|
||
Wednesday, August 2, 2023
|
||
|
||
2:08 PM
|
||
|
||
|
||
|
||
### Take off Unit as Conventional
|
||
|
||
### Save a Copy \"Save Job as\"
|
||
|
||
a. Save as *Job Name - Prefab*
|
||
|
||
### Fixtures
|
||
|
||
a. Only change \"MC\"
|
||
|
||
b. Recreate w/ PF
|
||
|
||
i. Delete everything but \"Fixture Labor\"
|
||
|
||
### Go into Unit
|
||
|
||
### Substitute to common assembly #47
|
||
|
||
### Kitchen Island Ass./Balcony Rec. Left out
|
||
|
||
### Custom SW
|
||
|
||
### To correct Gang/Decora or Toggle
|
||
|
||
### Prefab Version Gang\^
|
||
|
||
### \*\*\*Decora/Standard\*\*\*
|
||
|
||
### \*\*\*Gangs: 1G,2G,3G... \*\*\*
|