title: Risk Management for Construction Estimating
tags:
- authorship/original
- destiny/permanent
- status/incomplete
- topic/construction
- topic/estimating
- topic/risk
- type/cross-topic
---
# Risk Management for Construction Estimating
Cross-topic of [[risk-management]] and [[construction-estimating]].
## Estimating as Risk Mitigation
* reduce risk of wasted estimation effort due to bid loss
(prefer lower bid)
* reduce risk of project overrun
(prefer higher bid)
Estimating resources should be allocated
according to Return on Mitigation (RoM),
that is, their contribution to _cost certainty_.
$\text{Efficiency} = -1 \times \frac{d\sigma}{dt}$