Files
zmVault/timestamped/2025-11-13_13-25-27.md
T

1.4 KiB

tags, title
tags title
destiny/fleeting
occupational
status/complete
type/minutes
ConEst Training Agenda

2025-11-13 13:25:27

ConEst Training Agenda

%% Agenda I hastily assembled for training a project engineer on conest processes. %%

Day 1

%% Started ~13:45 %%

2100 Crystal Drive

%% 2100-crystal-drive %%

Deliverables
  • WBS Area Breakouts
  • Unit Matrix
  • accubid/LiveCount setup
Sequence
  1. Find BPM

    • State, building type
  2. Copy and rename ConEst project folder template

  3. Back to BPM

    • Download documents
  4. Workout Areas

    • Area Breakout
  5. Copy and setup WBS

  6. Create TrimbleConnect project

  7. Create accubid Job

    • Paste Areas
  8. Unit Matrix

    • look in electrical, arch; compare.
    • paste to Accubid Typicals

Day 2

Sequence

  1. Trainee to repeat process from #Day 1 on #Howard University East Towers.

  2. Trainer to pick up with #Finish TrimbleConnect Setup, then back to trainee to finish Howard University.

  3. Trainer to explain OneNote

Howard University East Towers

%% howard-university-east-towers %%

Deliverables
  • WBS Area Breakouts
  • Unit Matrix
  • Accubid/LiveCount setup

Revisit 2100 Crystal Drive

Finish TrimbleConnect Setup
  • Back to TrimbleConnect
    • split and add Drawings