139 lines
4.4 KiB
Markdown
139 lines
4.4 KiB
Markdown
---
|
||
id: 2026-03-10T13:51:32-0400
|
||
title: 2026-03-10 13:51:32
|
||
tags:
|
||
- status/draft
|
||
date-created: 2026-03-10T13:51:32-04:00
|
||
daily: "[[2026-03-10]]"
|
||
---
|
||
# 2026-03-10 13:51:32
|
||
|
||
## Charlotte South End Hotel Spec Interpretation
|
||
|
||
Spec interpretation notes for [[charlotte-south-end-hotel]]
|
||
with clarification by [[joel-jansen]]:
|
||
|
||
### EMT Fittings
|
||
|
||
> [!quote] Spec 260510 2.4(E)
|
||
> EMT - Electrical metallic tubing, "thin wall" zinc coated steel, enameled interior, ANSI C80.3, UL-797,
|
||
> assembled using concrete tight and rain tight gland-ring compression threaded type fittings
|
||
> except where alternate type fittings are allowable by the NEC
|
||
> and authorities have jusrisdiction \[sic\].
|
||
|
||
> [!quote] Spec 260510 2.4(N)(2)
|
||
> EMT connectors - Provide gland ring compression threaded fittings, except-
|
||
> * a. Concrete tight double set screw type connectors
|
||
> are acceptable in 2 1/2-inch and larger sizes
|
||
> in dry locations only.
|
||
|
||
> [!quote] Joel Jansen 2026-03-10 (pp.)
|
||
> Takeoff as specified
|
||
|
||
### Liquid-Tight Conduit
|
||
|
||
> [!quote] Spec 260510 2.4(G)
|
||
> Liquid-tight flexible metallic raceway
|
||
> shall be similar to standard flexible steel conduit
|
||
> except encased in liquid tight neoprene outer jacket.
|
||
|
||
No definition is provided for a liquid-tight flexible non-metallic raceway
|
||
|
||
> [!quote] Spec 260510 2.4(G)(7) (text decoration added)
|
||
> Provide _liquid-tight flexible conduit_
|
||
> for each motor and rotating device for power and control, ~~computer room~~[^1]
|
||
> and for other equipment requiring adjustments or removal for service
|
||
> in mechanical rooms or where subject to moisture or weather.
|
||
|
||
> [!quote] Joel Jansen 2026-03-10 (pp.)
|
||
> Assume LFMC.
|
||
|
||
[^1]: I feel fairly confident this is erroneous.
|
||
|
||
### Voltage Drop
|
||
|
||
> [!quote] Spec 260510 2.2(C)(4) (text decoration added)
|
||
> Sizing of conductors and conduits
|
||
> shall be solely the responsibility of the Contractor
|
||
> and shall be based on the NEC, [[nfpa-70_310_conductors_for_general_wiring|Article 310]].
|
||
> Ampacity shall be equal to, or greater than, the required load specified.
|
||
> ==Voltage drop shall be no greater than that allowed by the NEC.==
|
||
|
||
> [!quote] Dwg. E00-00 "GENERAL PRICING NOTES" Note 9
|
||
> PROVIDE ALLOWANCE TO UPSIZE FEEDERS/BRANCH CIRCUITS
|
||
> (OVER 100 FEET FOR 120/208V, OVER 200 FEET FOR 277/480V)
|
||
> FOR A MAXIMUM OF 3% VOLTAGE DROP.
|
||
|
||
### Lighting Control
|
||
|
||
#### Corridors
|
||
|
||
Corridors may or may not have included digital control
|
||
|
||
> [!quote] LEED Checklist, item "Interior Lighting" (Project Manual p. 23)
|
||
> Option 1: **Lighting Control:**
|
||
> Provide adjustable lighting controls
|
||
> for **90% of individual occupant spaces**
|
||
> with at least 3 lighting levels or scenes (on, off, mid-level).
|
||
> Provide control for **all shared multi-occupant spaces**.
|
||
|
||
Checklist assumes this point.
|
||
|
||
***
|
||
|
||
> [!quote] Typical Unit Corridor Occupancy Sensor Callout (Ref dwg. E03-06 thru E03-14)
|
||
> OCCUPANCY SENSORS TO DIM CORRIDOR LTG TO 50% WHEN NO OCCUPANCY
|
||
|
||
> [!quote] Dwg. E06-01 "LIGHTING CONTROL NARRATIVE"
|
||
> **SPACE TYPE** Corridor is shown only with captive key card control
|
||
|
||
#### Units
|
||
|
||
> [!quote] LD03-XX Typical Master Switch Callout
|
||
> MASTER - TO CONTROL ENTRY AND ROOM ONLY.
|
||
> ELECTRICAL ENGINEER TO SPECIFY ENERGY CODE COMPLIANT “MASTER OFF”
|
||
> FOR THE REQUIRED GUESTROOM LOADS.
|
||
> GMLD RECOMMENDS LUTRON’S "CODE-SMART" SYSTEM
|
||
> ...
|
||
|
||
Lighting control quote does not include master switches
|
||
|
||
> [!quote] PDR Lutron Lighting Control Quote 2025-12-10
|
||
> (13) Pre-Assembled Processor Panel,
|
||
> (14) Athena Centralized Din Lighting Control Panel,
|
||
> (14) DALI ESN Panel,
|
||
> (14) QS Sensor Module,
|
||
> (4) Touchscreen,
|
||
> (112) QS Wired Keypads,
|
||
> (2) Partition Sensor,
|
||
> (31) Wired Occupancy Sensor,
|
||
> (2) 5 Contact Closure Inputs and 5 Relay Outputs
|
||
|
||
These are captured as a budget
|
||
|
||
> [!quote] 2025.12.09 - Charlotte South End Hotel - Bid Sheet v16-4-2, "Add-On Items"
|
||
> master switch in guestrooms - TBD | $ 72,023
|
||
|
||
***
|
||
|
||
> [!quote] Proposal 2025-12-12, Pricing Summary
|
||
> Lighting Controls – Lutron (turnkey) $ 850,000
|
||
|
||
Assuming that this line includes master switches
|
||
based on sum of quote and switch allowance
|
||
|
||
> [!quote] PDR Lutron Lighting Control Quote 2025-12-10, Pricing Summary –Turnkey
|
||
> Lighting Control: Lutron $ 738,400.00
|
||
|
||
### EV Chargers
|
||
|
||
> [!quote] Proposal 2025-12-12, Alternates
|
||
> Add: (21) EV-Capable and (3) EV-Installed per Building Connected $ 38,000
|
||
|
||
Panel LG's schedule (E06-13)
|
||
shows (10) 40A/2P circuits
|
||
with description "EV CHARGER".
|
||
|
||
These circuits are not shown on the electrical set,
|
||
nor are any chargers besides.
|