Files
zmVault/2025-11-18.md
T

1.2 KiB

id, aliases, tags, title
id aliases tags title
authorship/original
destiny/permanent
status/draft
type/daily

2025-11-18

2025-11-18 16:33

%% Transcription of notes taken while reviewing Elliot St. with Joel Jansen. %%

Adorne USB Heating Designation was built with standard device. Subbed for Adorne.

Subbed standard duplex receptacles in guestrooms for Adorne.

Confirmed fixture branch length changes including Garage

Note: It is not usually necessary to count emergency fixtures separately.

Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).

Final Pricing adjustments: Warranty, CIP (see proposal)

Added putty pads.

Fire stopping budget = $25-35 per Unit.

Robotic Total Station hours: match Structural Foreman.

Equipment Cost \approx 1% for contracts 5-15 million dollars.

Mid Atlantic: 1 trip per month

Offsite Parking: see bid sheet

Project Executive time same as Oversight.

When calculating durations for indirect labor, round down.

  • Rough Foreman
  • Trim Foreman
  • Amenity Foreman

LV/FA Foreman: get hours from systems quote.

Fire Alarm, Two-Way Communication, DAS: Phase = "Fire Alarm"

Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.