# 2025-11-18
## 2025-11-18 16:33
%%
Transcription of notes
taken while reviewing Elliot St. with Joel Jansen.
%%
Adorne USB Heating Designation was built with standard device.
Subbed for Adorne.
Subbed standard duplex receptacles in guestrooms for Adorne.
Confirmed fixture branch length changes
including Garage
Note: It is not usually necessary to count emergency fixtures separately.
Use minimum 1 hour for tape lights, except in units (minimum 0.5hr).
Final Pricing adjustments:
Warranty,
CIP (see proposal)
Added putty pads.
Fire stopping budget = $25-35 per Unit.
Robotic Total Station hours: match Structural Foreman.
Equipment Cost $\approx$ 1% for contracts 5-15 million dollars.
Mid Atlantic: 1 trip per month
Offsite Parking: see bid sheet
Project Executive time same as Oversight.
When calculating durations for indirect labor, round down.
* Rough Foreman
* Trim Foreman
* Amenity Foreman
LV/FA Foreman: get hours from systems quote.
Fire Alarm, Two-Way Communication, DAS: `Phase` = "Fire Alarm"
Erroneously used WP GFI's in bathrooms, subbed for Kitchen/Bath assembly.
+7 -1
View File
@@ -141,11 +141,15 @@ Vertical:
### Smoke Detectors
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`SMOKE DETECTOR W/ BASE - ...`
_Design Build:_
Count every stairwell at every level.
### Pull Stations
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INITIATING DEVICES WITH WIRE - ...`/`PULL STATION - ...`
_Design Build:_
Count every stairwell at every level
and every exterior exit.
@@ -165,7 +169,9 @@ _Design Build:_
Count 2 for every set of double doors.
(Typical of elevator lobbies and corridors)
### Speaker Strobes
### Horns, Speakers, and Strobes
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`INDOOR HORN STROBE - ...`
_Design Build:_
* Count every 75 ft,
+20 -21
View File
@@ -2,46 +2,45 @@
id:
aliases: []
tags:
- authorship/other-for-now
- destiny/permanent
- occupational
- status/incomplete
- type/guide
- authorship/other-for-now
title: PDI Labor Plan
---
# PDI Labor Plan
1. Fill out project basics
2. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
2. Check that everything is sorted into correct `Phase` and `Area` (Extension: Phase - Area)
3. Move everything in BUILDING FA systems into FA phase
* Create a Phase named: "Fire Alarm"
* Check system and Bid Item
* Create `Phase` = "Fire Alarm"
* Check `System` and `Bid Item`
* Scroll through each and select all line items `FA - ...`
* Change Breakdown to "Fire Alarm" phase
* Set `Phase` = "Fire Alarm"
4. Separate all Phases into their proper corresponding "Labor Factor"
4. Separate all Phases into their proper corresponding `Labor Factor`
* Check Phase box
* Start scrolling through beginning with N/A
* Change breakdown of everything in each phase to the proper labor factor
* Scroll through each `Phase`
* Change breakdown of everything in each phase to the proper `Labor Factor`
* Do not move Temp Power (buckets) or site
5. Use the Accubid Extension tab to fill out the "Unit Lbr Calc" tab in the labor plan
6. Select the "Phase / Sort Code" extension view
6. Select extension view "Phase / Sort Code"
7. Open "UNIT RESIDENTIAL" and "Building - Corridors" phases
7. Open `Phase` "UNIT RESIDENTIAL" and "Building - Corridors"
8. Go into each Sort code to find the count for each unit item
| Code | Description |
| Code | Description |
| ---- | -------------------- |
| 200 | rough |
| 300 | trim |
| 400 | rough wire and cable |
| 200 | rough |
| 300 | trim |
| 400 | rough wire and cable |
9. Some items will autofill when you fill out the "Accubid Extension Totals" table on the right
@@ -50,14 +49,14 @@ title: PDI Labor Plan
10. Fill out the "Labor for Concrete Slab/Deck Labor" table on the labor sheet calc tab
* For the floor counts, if there are multiple buildings, add their total level count together
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
* 2 buildings that each have 10 floors, input 20 for "number of floors - building
* Add any useful description to the naming
* Can change "Other" to something more prevalent on the project
* Can change "Other" to something more prevalent on the project
* "pour section rate" refers to the size of each slab that will be poured (sometimes will be shown on the structural plans)
* "pour section rate" refers to the size of each slab that will be poured
* sometimes will be shown on the structural plans
* "Number of days per…" is found by multiplying "Pour Section Qty" by 4 or 5
* "Number of days per..." equals "Pour Section Qty" times 4 or 5
11. Check that everything is sorted into correct Phase and Area (Extension: Phase - Area)
11. Check that everything is sorted into correct `Phase` and `Area` (Extension: "Phase - Area")
+7
View File
@@ -38,6 +38,10 @@ Size and quantity per proposal > drawings > assume (4) 4"C
_Garden Style:_ Outside of every building
> [!important] Long-Radius Elbows
> Note requirements for long-radius elbows,
> substitute items as necessary.
### Telecom Vaults
"Quazite Box"
@@ -117,3 +121,6 @@ As shown on plans. Ignore floor boxes, other electrical scope.
* .../`BOH / AMENITY ASSEMBLIES`
* .../`SCREWLESS DECORA COVERS UNITS / BOH`
* .../`ROUGH IN ASSY`
If system is included, take off _both_ rough-in and device assemblies
in amenity areas.
+11 -1
View File
@@ -98,8 +98,16 @@ Eaton 35M2W
### Telecom Homeruns
#### Residential
Included in MSDE.
#### Key
`COMMON ASSEMBLIES`/`TELECOM SYSTEMS`/`BOH AMENITY ASSEMBLIES`/...
Adjust cable length as needed.
### Fire Alarm Devices
#### Residential
@@ -116,4 +124,6 @@ For ADA units:
##### Additional Signaling Devices
==use free air devices==
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`INDICATING DEVICES WITH WIRE - ...`/`UNIT HORN/STROBE - ...`
#### Key