I suspect that in general of [[conest]],
|
|
our assemblies are not intended to have fluff built in,
|
|
or that our preferred methods
|
|
are intended to include more material than necessary.
|
|
We prefer to tolerate the uncertainty, to retain the risk,
|
|
weighing it less than that of committing additional resources
|
|
to mitigation (estimating).
|
|
|
|
[[hubbard_2020_failure#Simple Risk Management]]
|
|
is perhaps the single most important section of Hubbard's
|
|
for breaking free of the confines of [[orthodox-construction-estimating]].
|
|
|
|
> It might seem that some extremely obvious risks
|
|
> can be managed without much of an assessment effort
|
|
> (e.g., implementing full backup and recovery
|
|
> at a data center that doesn't have it,
|
|
> installing security systems at a major jewelry store, etc.).
|
|
> But in most environments, there are numerous risks,
|
|
> each with one or more potential risk mitigation strategies
|
|
> and a limited number of resources.
|
|
> We have to assess not only the initial risks
|
|
> ==but also how much the risk would change==
|
|
> ==if various precautions were taken.==
|
|
|
|
Detailed takeoff is poor risk mitigation.
|