Files
zmVault/pdi-accubid-quoted-material.md
T
2026-03-25 15:26:47 -04:00

1017 B

id, aliases, title, tags, dg-publish
id aliases title tags dg-publish
PDI Accubid Closeout: Quoted Material
authorship/original
destiny/permanent
occupational/closeout
status/incomplete
type/guide
true

PDI Accubid Closeout: Quoted Material

Important

Quoted material costs must be ==pre-tax==.

Fixtures

  • Vendor <- "PDR - {Quote Type}" (e.g. "PDR - Spec/Equal", "PDR - VE")
  • Quote <- Per PDI Systems proposal
  • Notes <- Quote date

Tip

PDR fixture quotes are usually broken out by area type, buy it is not necessary to preserve this breakdown in the estimate. Use the sum total cost in a single Quoted Materials line item.

Switchgear

  • Vendor <- Per quote (or "PDI BUDGET" if not available)
  • Quote <- Per quote (or Bid Sheet Budget if not available)
  • Notes <- Quote Date

Generator

  • Vendor <- Per quote (or "PDI BUDGET" if not available)
  • Quote <- Per quote (or Bid Sheet Budget if not available)
  • Notes <- Quantity, Size in kW, Quote Date