Files
zmVault/uncertainty-in-construction-estimating.md
T

49 lines
1.2 KiB
Markdown

---
title: Uncertainty in Construction Estimating
tags:
- topic/estimating
- topic/risk
- type/cross-topic
---
# Uncertainty in Construction Estimating
Cross-topic of [[uncertainty]] and [[construction-estimating]].
This note is intended to be purely descriptive.
See [[actuarial-science-for-construction-estimating]]
and [[risk-management-for-construction-estimating]]
for strategy based on such uncertainty.
%%
## TALK
What do I mean that project cost is uncertain until the last invoice?
What distributions exist
which are known,
which can never be known and must be estimated?
[[bid-price-modeling]]
***
With perfect information all outcomes are certain.
There exists some distribution representing the range of possible costs for a project.
The remaining uncertainty represents ignorance of information an estimator can not feasibly obtain.
***
Suppose the estimator has spent years on the bid,
running simulations, consulting experts, etc.
Suppose the estimator has received a message from a time traveler
which details significant news events and commodity markets
for the duration of the project.
Suppose the estimator is prescient and has observed the final cost of the project
as reported in the winning contractor's historicals.
%%