# Sequence
## Electrical
### 1. Estimate preparation
2. Read about the project specifications and construction type
3. Locate Equipment Schedules
4. Device specs (Decora or Standard)
### 2. Takeoff
1. Takeoff all equipment that is not #12
2. Go by Drawing in chronological order
3. Takeoff Enlarged Drawings
4. Do final checklist in electrical takeoff notes
### 3. Extension (Review and Checking)
1. Count Car chargers and location
## Feeders
### 1. Estimate preparation
Read about the project specifications and construction type
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
* Deck thickness
* Wiring method
* Conductor material (Aluminum/Copper)
Locate:
* Riser Diagram
* Feeder Schedule (if present)
* Main Electrical rooms and panel locations
* Routing (if present)
### 2. Takeoff
* Choose a starting point on the riser
* Determine wire & Conduit makeup (3Ph/1Ph, AL/CU, Conduit)
* Measure off the length of the feed _ADDERS_
* Square corners, use corridors if possible
Bus Duct
### 3. Extension (Review and Checking)
## Fire Alarm - Riser
### 1. Estimate preparation
1. Initial the OneNote
2. Find Fire Alarm plans (If Applicable)
3. Locate Fire Command Center (FCC)
### 2. Takeoff
1. Use the FA Riser Script
2. Takeoff Devices
### 3. Extension (Review and Checking)
1. Sleeving for riser?
2. Are Two-Way/DAS Included?
## Fire Alarm - Devices
### 1. Estimate preparation
2. Read about the project specifications and construction type
3. Find FA drawings or where they are shown
### 2. Takeoff
1. Takeoff floor plans in order
2. Takeoff enlarged drawings
### 3. Extension (Review and Checking)
8. Fire Smoke Dampers (FSD's) FA or electrical?
9. Sleeving?
## Lighting
### 1. Estimate preparation
1. Read about the project specifications and construction type
2. In drawings, locate:
* Fixture Schedule
* Reflected Ceiling Plans
### 2. Takeoff
1. Takeoff floor plans in order
2. Takeoff enlarged drawings
### 3. Extension (Review and Checking)
1. Garage Homeruns
2. Luminaire in Amenity Areas
3. Ensure appropriate breakdowns
* Site lighting in System =="Site Misc. Fixtures"==
## Units
### 1. Estimate preparation
1. Locate Unit panels and relevant keynotes
* Bus amps
2. Read about the project specifications and construction type
* Wood or Metal studs
* Wiring Method
* NM or MC
* Wiring device plates
* Decora or Standard
* Wiring device specs
* are 15A devices allowed?
* Equipment (20A Kitchen and bath)
3. Fill out OneNote
### 2. Takeoff
1. Kitchen and Bath
2. General assemblies
3. Low Voltage
4. Lighting Control
5. Lighting Fixtures
Copy paste original takeoff and adjust to changes
### 3. Extension (Review and Checking)
1. Scroll through with Area selected and make sure there is takeoff for each unit type
## Telecom - Devices
### 1. Estimate preparation
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
* Cabling
* Conduit & Pathways
* Sleeving
2. Locate which plans the LV is taken off on
3. Locate LV Details
4. Read about the project specifications and construction type
5. Fill out OneNote
### 2. Takeoff
1. Takeoff devices as shown throughout the building
2. Takeoff Conduit Riser as needed
### 3. Extension (Review and Checking)
1. Sleeving
## Telecom - Riser
1. Service entrance conduit "Site Low Voltage Ductbank (SLVDB)"
2. Riser throughout building
3. Sleeving for riser
## Subfeeds
### 1. Estimate preparation
1. Read about the project specifications and construction type
* Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
* Deck Thickness
* Corridor Ceiling type
2. In the drawings, locate:
* Unit Panel Schedules
* Unit Load Calculations
* Riser Diagram
* Subfeed schedule (if present)
### 2. Takeoff
1. Determine wiring method
| Construction Type | Wiring Method | Subfeed Options |
| ----------------- | ------------- | --------------- |
| 1,2 | MC Cable | MC, PVC, EMT |
| 3,4,5 | NM Cable | SER, EMT |
%%
TODO: Create flow chart for wiring methods.
Some cases to mention:
* Deck thickness (minimum 3x conduit outer diameter)
* Renovations (may not be able to run in slab)
%%
2. Route subfeeds to the Meter Centers using appropriate adder lengths
> [!tip]
> Identify if and where typicals can be used
3. Assign material to lengths and apply Voltage drop if applicable
4. Pigtails and Wireway Troughs if applicable
### 3. Extension (Review and Checking)
1. Use the extension tab to determine the Correct Quantity
## Switchgear
### 1. Estimate preparation
1. Initial the OneNote
2. In the drawings, locate:
* Riser Diagrams
* House Panels
### 2. Takeoff
1. Copy over the Temporary assemblies from "Ben -1"
2. Build Items in Distribution:
* Panelboards
* Switchboards
* Transfer SWs
* Meter centers
* Generator
3. Takeoff Common Assemblies:
* XFMRs
* Disconnect Switches
* Bus Duct
4. Takeoff Items in Item Database:
* Wireway (Trough/Gutter)
5. Takeoff Temp Assemblies:
* CT Cabinet
* Meter
* Fire Pump
* Fire Pump Controller
* SPD/TVSS
When building panelboards/switchboards,
add terminations according to an example from the schedules.
Do not include feeder terminations.
Items to Avoid:
* Tap Boxes
* Bus Duct
* Vault Room
* Anything FPL
* Grounding
* Elevator Room
### 3. Extension (Review and Checking)
1. Generator
* Ensure takeoff is in the generator Area and System breakdowns
* Put location, quantity, and type on OneNote
## Low Voltage
### 1. Estimate preparation
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
* Cabling
* Conduit & Pathways
* Sleeving
2. In the drawings, locate:
* Floor plans where LV scope is shown
* LV Details
3. Read about the project specifications and construction type
4. Fill out OneNote
### 2. Takeoff
1. Takeoff devices as shown throughout the building
2. Takeoff riser conduit as needed
### 3. Extension (Review and Checking)
1. Sleeving for riser