Files
zmVault/traditional-estimating-methods.md
T

422 B

Traditional Estimating Methods

Also "single-point estimation" as opposed to the standard three-point.

"Traditional estimating methods" as referenced frequently in this notebook are those construction-estimating methods that produce:

  • an exhaustive and specific bill of material
  • a single, definitive final price for each bid item

Such methods lack the ability to intelligently express uncertainty.