Pre-Takeoff Research

Pre-Takeoff Research

[!important] Requirement Precedence In case of conflict: Requirements of the plans and specs are superseded by the terms of our proposal, which are superseded by specific direction from the bid team.

Seek to use the cheapest method, as determined by Senior Construction Estimator and Database Administrator, as allowed for the situation.

Voltage Drop

Unless explicitly stated in the plans or specs, conductors are to be sized according to the relevant schedule, without respect for voltage drop.

Subfeeds

  1. Read about the project specifications and construction type
  • Delivery Method: (Plans & Specs, Design Build, Design Assist, Preliminary Budget)
  • Corridor Ceiling type
  1. In the drawings, locate:
  • Unit Panel Schedules
  • Unit Load Calculations
  • Riser Diagram
  • Subfeed schedule (if present)

Emergency Systems

  1. Find Fire Alarm plans (if present)
  2. Locate the following rooms:
    • Fire Command Center (FCC)
    • Generator Room
    • Fire Pump Room
    • Elevator Control Rooms
    • Elevator Shafts
    • Stairwells