37 lines
1.3 KiB
Markdown
37 lines
1.3 KiB
Markdown
---
|
|
id: 2026-04-02T19:10:14-0400
|
|
aliases: []
|
|
title: 2026-04-02 19:10:14
|
|
tags:
|
|
- status/draft
|
|
dg-publish: true
|
|
date-created: 2026-04-02T19:10:14-04:00
|
|
daily: "[[2026-04-02]]"
|
|
---
|
|
# 2026-04-02 19:10:14
|
|
|
|
From a high-level, business proposition perspective
|
|
[[construction-estimating]] is identical in function to stock trading,
|
|
both typified by expert judgement under uncertainty
|
|
...
|
|
One significant difference despite their similarity
|
|
is that only in stock trading is it well understood
|
|
that individual loss is not only inevitable,
|
|
_it is how the strategy works._
|
|
If you're not losing sometimes
|
|
you're not assuming enough risk
|
|
and you're missing out on returns.
|
|
|
|
Similar sentiments expressed in the context of construction contracting
|
|
are not popular, and are frequently judged irresponsible.
|
|
|
|
I believe the tendency to set standards for estimates
|
|
beyond the optimal level of detail
|
|
stems from a named [[cognitive-bias]]
|
|
of [association](https://en.wikipedia.org/wiki/List_of_cognitive_biases#Association)
|
|
or [relevance fallacy](https://en.wikipedia.org/wiki/List_of_fallacies#Relevance_fallacies)
|
|
which leads otherwise rational estimators
|
|
to the erroneous belief that because construction is physically tangible,
|
|
risk control is more effective than in markets.
|
|
This may be related to [[2026-04-02_20-41-59#Decomposition Fallacy]].
|