This note details creation of fixture designations for use in fixtures-takeoff.
Name Format
There is no standard convention for fixture designation names in the conest-body-of-knowledge. The best any estimator can do is be internally consistent.
My own preference is similar to
A - Surface (Pendant) = 2.0hrs - #12 MC+LV 20ft,
described by the pseudo-regular-expression below:
<phase-abbr> - <assembly>(: <assembly-subtype>)?( \(<comment>\))?( = <fixture-labor>)? <wiring-method> <branch-length>ft
Phase Abbreviation (<phase-abbr>)
Assembly (<assembly>)
- "Surface" - Assembly includes a junction box
- "Recessed" - Assembly does not include a junction box
Assembly Subtype (<assembly-subtype>)
Comment (<comment>)
In contrast to Assembly Subtype,
Comment reflects a distinction between fixture types or use case
which does not affect the contents of the designation.
That is, Surface, Surface (Sconce), and Surface (Pendant)
Fixture Labor (<fixture-labor>)
| Fixture Type | Labor |
|---|---|
| Paddle Fan | 1.5 hr/ea. |
| Pendant | 1-4 hr/ea. |
| Tape | 0.5 hr/6ft |
| Site Poles | 1.5 hr/ea. |
| Festoon | 2.0 hr/ea. |
| All Others | 1.0 hr/ea. |
FIXTURES/FIXTURE LABOR/FIXTURE LABOR 1HR
Wiring Method (<wiring-method>)
Conduit/Cable Type
Wire Size
| Case | Wire Size |
|---|---|
| Site/Courtyard | #10 |
| Garage | #10 |
| NM Cable | #14* |
| All Others | #12 |
*Minimum #12 in kitchens and bathrooms.
Dimming Conductors
Branch Length (<branch-length>)
| Case | Standard Length |
|---|---|
| Site/Courtyard | 50ft |
| Garage | 50ft |
| BOH | 40ft |
| Corridors | 40ft |
| Interior Amenity | 40ft |
| Office/Retail | 50ft |
| Exterior Amenity | 50ft |
| Units | 20ft |
| Undercabinet Fixtures | 10ft |
| Stairwells | 20ft |
| Kitchen | ? |
Reduce as appropriate.
Order
Use empty designations to separate phases.
[!example]
# Stairwells BS - Surface = 1.0hrs - #12 EMT 20ft # Building ## Units - Key UK - Surface = 1.0hrs - #12 MC+LV 20ft UK - Surface = 1.5hrs - #12 MC+LV 20ft UK - Surface (Pendant) = 2.0hrs - #12 MC+LV 20ft UK - Surface (J-Box For Future Fixture) = 1.0hrs - #12 MC+LV 20ft UK - Recessed = 1.0hrs - #12 MC+LV 20ft _ ## Units - Residential UR - Surface (Tape) = 1.0hrs - #12 MC+LV 25ft UR - Surface (Wall) = 1.0hrs - #12 MC+LV 25ft ...
Content
Garage
Use ENT assemblies unless forbidden by spec.
| Case | Subassembly Path (FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/...) |
|---|---|
| Conventional Slab | .../GARAGE FIXTURE ENT W/#10 - STEEL OCT RING |
| Precast/I-Beam | .../GARAGE FIXTURE W/T ROD ENT W/#10 - STEEL OCT RING |
If PVC is required, use following assemblies:
| Case | Subassembly Path (FIXTURE ACCESSORIES/PVC/ENT ASSEMBLIES/...) |
|---|---|
| Ceiling | .../... - SLAB BOX / 45 DEG STUBBY |
| Wall | .../... - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP |
Surface Mount
[!info] Surface Mount Fixtures
- Wall Mount
- Wall Pack
- Sconce
- Swing Arm
- Pendant
- Linear
- Tape
- Track
| Wiring Method | Subassembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/SQ BOX, ROUND P RING & MNTG BRKT... |
| PVC in Ceiling | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
| PVC in Wall | PVC/ENT ASSEMBLIES/3/4" PVC W/ 3#12 - STL BOX/TILE RING |
| EMT | EMT ASSEMBLIES/... - SQ BOX & ROUND P RING |
Note
Use lighting control cable assemblies in Amenity areas
Tape Lighting
Also called "cove" or "strip" lighting, however those terms are less specific and potentially confusing.
Use item FIXTURE LABOR 1/2HR
and change Fct 1 to match the calculated labor
(1 hour per 12 feet).
Note
Tape lighting length is limited by the "max power length" of the model (usually measured in millimeters). Max power length is usually 5000-15000mm (~16-49ft) depending on luminous output and voltage.
A reasonable heuristics is
- 12V strips: 5m (16.4ft)
- 24V strips: 10m (32.8ft)
Separate these fixtures by labor, not length
*** Back of House ***
B - Surface (Tape) = 1.0hr (0-17ft) - #12 MC 40ft
_
*** Interior Amenity ***
IA - Surface (Tape) = 1.0hr (00-17ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 2.0hr (18-29ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 3.0hr (30-41ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 4.0hr (42-53ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 5.0hr (54-65ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 6.0hr (66-77ft) - #12 MC+LV 40ft
IA - Surface (Tape) = 7.0hr (78-89ft) - #12 MC+LV 40ft
Recessed
[!info] Recessed Fixtures
- recessed downlight
- recessed linear
- wall grazer
- troffer
| Wiring Method | Subassembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/HI HAT - ... |
| MC Cable | MC ASSEMBLIES/HI HAT - ... |
For crowded puck light areas: measure length between fixtures, round up to the nearest 5ft
Note
"HI HAT" refers to a recessed can fixture.
Undercabinet Fixtures
| Wiring Method | Subassembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/UNDER CABINET - ... |
| MC Cable | MC ASSEMBLIES/UNDER CABINET - ... |
Note
Takeoff 2 fixtures if jumping over oven
Paddle Fans
| Wiring Method | Subassembly Path |
|---|---|
| NM Cable | NM ASSEMBLIES/RND BOX BAR HNGR... |
| MC Cable | MC ASSEMBLIES/FAN RATED OCT BOX W/ BAR HNGR - ... |
| PVC | PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY |
Guardrail Fixtures
[!info] Designation Subassemblies
FIXTURE ACCESSORIES/COURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...
Stairwells & Elevators
[!info] Designation Subassemblies
PVC/ENT ASSEMBLIES/... - SLAB BOX / 45 DEG STUBBY
Facade
Phase= "Facade"
Length and Labor will be more than a normal fixture in BOH/Amenity
| Fixture Type | Labor |
|---|---|
| Non-Linear | 2hrs |
| Linear | See #Tape Lighting |
[!info] Designation Subassemblies
3/4" PVC W/ 3#10 - STL BOX & TILE RING / 45 DEG STUBBY/ ENT DROP
Length per Unit= Distance to panel
Porte Cochere (Drive up Area)
Create its own breakout in WBS, and phase in accubid
Site & Courtyard
Important
Coordinate with landscape drawings
Breakdowns
System= "FML - Site Fixtures Material & Labor"
Pole Lights
[!info] Designation Subassemblies
FIXTURE ACCESSORIES/SITE POLE ASSEMBLIES/...
Add subassemblies for stub-outs, pole, base, and grounding as appropriate.
Festoon Lighting
[!info] Also Known As
- string lighting
- market lighting
- catenary lighting
[!info] Designation Subassemblies
FIXTURE LABOR/FIXTURE LABOR 2HR
FESTOON & ROOF ASSEMBLIES/FESTOON CABLE HANGER & EYE BOLTS - LENGTH
- Length per Unit = Light string length
COURTYARDS & LANDSCAPE/ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ...
- Length per Unit = Distance to panel + 15ft
Other Fixture Types
| Fixture Type | Subassembly Path (FIXTURE ACCESSORIES/COURTYARDS & LANDSCAPE/...) |
|---|---|
| Step Light | .../STEP FIX, 3/4" CONDUIT - PVC40 - ... |
| Bollard | .../BOLLARD, 3/4" CONDUIT - PVC40 - ...* |
| Up-light | .../PERMA POST, 3/4" CONDUIT - PVC40 - ... |
| In-grade up-light | .../3/4" CONDUIT - PVC40, IMC Elbow, ... |
| Fixtures built into cabanas/pergolas | .../ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40 - ... |
| Handrail light | .../ALUM BOX W/ FLEX FIX, 3/4" CONDUIT - PVC40, IMC ELBOW - ... |
*If we don't own concrete, delete pre-cast bollard base from assembly
FAA Lighting
[!info] Designation Subassemblies
FIXTURE LABOR/FIXTURE LABOR 1HRFESTOON & ROOF ASSEMBLIES/Aircraft Warning, 3/4" Conduit GRC/PVC 2#10, 1#10G