34 lines
954 B
Markdown
34 lines
954 B
Markdown
---
|
|
id: 2026-05-20T13:10:36-0400
|
|
title: 2026-05-20 13:10:36
|
|
tags: []
|
|
daily: "[[2026-05-20]]"
|
|
---
|
|
# 2026-05-20 13:10:36
|
|
|
|
Direction from [[josh-ford]]
|
|
relevant to [[electrical-takeoff]]
|
|
on [[303-mariposa-residence]]
|
|
with application elsewhere as well.
|
|
|
|
## Heating Designations vs. Temporary Assemblies
|
|
|
|
Reiterating direction expressed [[2025-05-11]],
|
|
we are to prefer length-based assemblies for equipment connections,
|
|
preferring temp assemblies over heating designations.
|
|
|
|
## "1/2in Conduit"
|
|
|
|
> [!quote] Electrical.pdf, E2.11
|
|
> PROVIDE EQUIPMENT WITH 1/2"C - 2#8 AWG & #10 GND.
|
|
|
|
Josh repeated my understanding that this verbiage is common
|
|
even when cable type wiring methods are allowed.
|
|
Assuming the inclusion is deliberate,
|
|
it could be interpreted in our favor as
|
|
"if you choose to or must use conduit, use this size."
|
|
|
|
We very rarely use 1/2in conduit, using 3/4in instead.
|
|
the cost difference is quite small,
|
|
especially when considering bulk savings.
|