id: 2025-11-13T08:19:00-0500
|
|
title: 2025-11-13 08:19:??
|
|
tags:
|
|
- occupational
|
|
- topic/estimating
|
|
daily: "[[2025-11-13]]"
|
|
---
|
|
# 2025-11-13 08:19:??
|
|
|
|
I'm still working on articulating
|
|
my main difficulty in the transition
|
|
from Ace to PDI estimating.
|
|
|
|
At a high level,
|
|
it's that our process is built on _instrumental_ methods,
|
|
but that it is frequently judged from a _realist_ perspective.
|
|
See [[heuristics#Realism vs. Instrumentalism]].
|
|
|
|
There may be a more accurate way to state this.
|
|
[[2025-11-10_11-14-00]] may be an example of a similar issue,
|
|
where instrumental methods are presented as if they were realist,
|
|
causing confusion when the methods are,
|
|
as judged from a realist perspective, wrong.
|