77 lines
1.8 KiB
Markdown
77 lines
1.8 KiB
Markdown
---
|
|
id:
|
|
aliases:
|
|
- das
|
|
tags:
|
|
- occupational/systems/standalone-systems
|
|
---
|
|
# Distributed Antenna Systems (DAS)
|
|
|
|
## Info
|
|
|
|
### Emergency Responder Radio Communication Systems (ERRCS)
|
|
|
|
Relevant Standard: NFPA 1225
|
|
|
|
### Cellular Systems
|
|
|
|
Less common than ERRCS are "cellular DAS" systems
|
|
|
|
## Sequence
|
|
|
|
### 1. Estimate preparation
|
|
|
|
Complete [[fire-alarm]] preparation and takeoff.
|
|
|
|
### 2. Takeoff
|
|
|
|
#### FACR to Every Elev. Shaft
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO ELEV PIT = ...`
|
|
|
|
Match Fire Alarm takeoff Length and Count
|
|
|
|
#### FACR to Every Staircase
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO STAIRWELL = ...`
|
|
|
|
Match Fire Alarm takeoff Length and Count
|
|
|
|
#### Stairwell Riser Every 2 Floors
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`STAIRWELL RISER EVERY 2 FLRS = 1 1/2" EMT (20') W/ 16X16X6 BOX`
|
|
|
|
Create a Stairwell typical on every other floor
|
|
|
|
#### FACR to Electric Room
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO 2HR-RATED RM = 2" PVC40`
|
|
|
|
Match Fire Alarm takeoff Length
|
|
|
|
#### Electric Room Riser to Every Floor
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`2HR-RATED RM RISER TO EVERY FLR = 2" EMT (15') W/ 16X16X6 BOX`
|
|
|
|
Takeoff in every Electric Room
|
|
|
|
#### Top 2H Rated Room To Roof
|
|
|
|
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = 2" EMT W/ RMC WEATHERHEAD & IMC STUB`
|
|
|
|
Use 15' or Height of ceiling on last building level
|
|
|
|
#### Horizontal
|
|
|
|
CORRIDORS EMT OH = 1 1/2" EMT W/ 16X16X6 BOX EVERY 80'
|
|
CA.28.31.23
|
|
|
|
CORRIDORS DECK = 1 1/2" PVC40, STUBBY, FLEX W/ 16X16X6 BOX EVERY 80'
|
|
CA.28.31.21
|
|
|
|
1-1/2 through corridors w/ 16x16x6 J-Box
|
|
|
|
Length for every corridor/garage
|
|
|
|
### 3. Extension (Review and Checking)
|