1.0 KiB
1.0 KiB
title, tags
| title | tags | ||||
|---|---|---|---|---|---|
| Full Takeoff |
|
Full Takeoff
Info
Prerequisites
Sequence
[!important] Disclaimer These scripts are intended to cover all cases, but may not. Variations should be corrected.
Stage 1
Stage 2
- units-takeoff
- fixtures-takeoff
- lighting-controls-takeoff
- electrical-takeoff
- telecom-takeoff
- low-voltage-takeoff
- fire-alarm-takeoff
- two-way-takeoff
- distributed-antenna-systems-takeoff
- misc-budgets-takeoff
- temp-power-takeoff