75 lines
1.5 KiB
Markdown
75 lines
1.5 KiB
Markdown
---
|
|
id:
|
|
aliases: []
|
|
tags:
|
|
- systems/units
|
|
---
|
|
# Unit Takeoff
|
|
|
|
## Info
|
|
|
|
"Units" includes [[#hotel]] and [[#residential]] spaces.
|
|
|
|
> [!info] Americans with Disabilities Act (ADA) Terms
|
|
> * hearing impaired (HI or H.I.)
|
|
> * mobility features (MF or M.F.)
|
|
> * accessible (Acc.)
|
|
> * usually refers to mobility features.
|
|
|
|
### Hotel
|
|
|
|
> [!info] Also Known As
|
|
> * Guestrooms
|
|
> * Keys
|
|
|
|
> [!trivia]
|
|
> The term "key" as a synonym of "hotel room" is a synecdoche,
|
|
> referring to the unit's door key.
|
|
> In the pre-digital days of hotel management,
|
|
> one could count the rooms of a hotel
|
|
> by the keys behind the front desk.
|
|
|
|
### Residential
|
|
|
|
> [!info] Also Known As
|
|
> * Condos
|
|
> * Apartments
|
|
|
|
## Sequence
|
|
|
|
### 1. Estimate preparation
|
|
|
|
1. Locate Unit panels and relevant keynotes
|
|
* Bus amps
|
|
|
|
2. Read about the project specifications and construction type
|
|
* Wood or Metal studs
|
|
* wiring methods
|
|
* NM or MC
|
|
* Wiring device plates
|
|
* Decora or Standard
|
|
* Wiring device specs
|
|
* are 15A devices allowed?
|
|
* Equipment (20A Kitchen and bath)
|
|
|
|
3. Fill out OneNote
|
|
|
|
### 2. Takeoff
|
|
|
|
> [!tip] Preparing for Unit Takeoff
|
|
> Units generally have very little variation.
|
|
> It is usually best to copy-paste takeoffs
|
|
> rather than re-build them for each unit.
|
|
|
|
1. Kitchen and Bath
|
|
2. General assemblies
|
|
3. Low Voltage
|
|
4. Lighting Control
|
|
5. Lighting Fixtures
|
|
|
|
Copy paste original takeoff and adjust to changes
|
|
|
|
### 3. Extension (Review and Checking)
|
|
|
|
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|