41 lines
723 B
Markdown
41 lines
723 B
Markdown
---
|
|
id:
|
|
aliases: []
|
|
tags:
|
|
- occupational/systems/low-voltage
|
|
---
|
|
# Low Voltage
|
|
|
|
## Info
|
|
|
|
* Security/Intrusion Detection
|
|
* Access Control
|
|
* CCTV
|
|
* Audio-Visual
|
|
* Wi-Fi
|
|
|
|
Not to be confused with [[telecom]].
|
|
|
|
## Sequence
|
|
|
|
### 1. Estimate preparation
|
|
|
|
1. Locate Proposal/Scope of Work. Determine ownership and takeoff responsibility:
|
|
* Cabling
|
|
* Conduit & Pathways
|
|
* Sleeving
|
|
2. In the drawings, locate:
|
|
* Floor plans where LV scope is shown
|
|
* LV Details
|
|
3. Read about the project specifications and construction type
|
|
4. Fill out OneNote
|
|
|
|
### 2. Takeoff
|
|
|
|
1. Takeoff devices as shown throughout the building
|
|
2. Takeoff riser conduit as needed
|
|
|
|
### 3. Extension (Review and Checking)
|
|
|
|
1. Sleeving for riser
|