# Traditional Estimating Methods
|
|
|
|
Also "single-point estimation"
|
|
as opposed to the standard three-point.
|
|
|
|
"Traditional estimating methods"
|
|
as referenced frequently in [[this notebook]]
|
|
are those [[construction-estimating]] methods that produce:
|
|
|
|
* an _exhaustive_ and _specific_ bill of material
|
|
* a single, definitive final price for each bid item
|
|
|
|
Such methods lack the ability to intelligently express [[uncertainty]].
|