aliases:
|
|
- Hilltop Gardens
|
|
title: Hilltop Gardens
|
|
tags:
|
|
- occupational
|
|
up: "[[conest-projects]]"
|
|
---
|
|
# Hilltop Gardens
|
|
|
|
[[pdi-building-types#Garden Style]]
|
|
|
|
6 buildings + clubhouse
|
|
3 building types
|
|
|
|
## TODO
|
|
|
|
* [x] [[feeders-takeoff]]
|
|
* [x] [[subfeeds-takeoff]]
|
|
* [x] [[switchgear-takeoff]]
|
|
* [x] Lighting Inverters
|
|
* [x] [[units-takeoff]]
|
|
* [x] [[fixtures-takeoff]]
|
|
* [x] Site Lighting
|
|
* [x] [[lighting-controls-takeoff]]
|
|
* [x] [[electrical-takeoff]]
|
|
* [x] Residential level 04 lighting inverter(s?) power
|
|
* [x] [[electrical-takeoff#Trash Chute]]
|
|
* [x] [[electrical-takeoff#Unit Condensing Units]]
|
|
* [-] Unit CU control wiring, conduit
|
|
* [x] EV Chargers
|
|
* [x] Pool bonding
|
|
* [x] [[lighting-controls-takeoff]]
|
|
* [x] Lighting controls in corridors
|
|
* [x] [[telecom-takeoff]]
|
|
* [x] SLVDB
|
|
* [x] Backbone
|
|
* [x] Homeruns
|
|
* [-] [[low-voltage-takeoff]]
|
|
* [x] [[fire-alarm-takeoff]]
|
|
* [x] [[two-way-takeoff]]
|
|
* [?] Stairwells? Elevator lobbies? Both? See [[2026-05-05_11-53-09]].
|
|
* [x] [[distributed-antenna-systems-takeoff]]
|
|
* [-] Corridor assemblies
|
|
* [-] [[lightning-protection-takeoff]]
|
|
* Not mentioned in drawings or proposal,
|
|
no cost included in Bid Sheet.
|
|
* [x] [[misc-budgets-takeoff]]
|
|
* [ ] [[temp-power-takeoff]]
|
|
|
|
## ConEst Questions
|
|
|
|
Questions for [[conest|ConEst]]:
|
|
|
|
### Area Breakdowns
|
|
|
|
Since residential building types have corridors
|
|
it will be necessary to create Areas for each level.
|
|
|
|
## Bid Questions
|
|
|
|
Questions for [[pdi-bid-estimating|Bid]]:
|
|
|
|
### Voltage Drop
|
|
|
|
VOLTAGE DROP CALCULATIONS ON ALL FEEDERS AND BRANCH CIRCUITS
|
|
HAVE BEEN PERFORMED IN ACCORDANCE WITH THE STATE OF FLORIDA 2023 FBC ENERGY CONSERVATION C405.5.3.
|
|
THE CONTRACTOR IS RESPONSIBLE TO BE FAMILIAR WITH THE 2020 FBC ENERGY CONSERVATION
|
|
AND SHALL UPSIZE THE CONDUCTORS FOR FEEDER AND BRANCH CIRCUITS
|
|
BASED ON THE ACTUAL ROUTING IN THE FIELD.
|
|
|
|
![[iecc_c405#C405.10 Voltage drop.]]
|
|
|
|
### Floor Boxes
|
|
|
|
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 25
|
|
> RECEPTACLES WHICH ARE SHOWN WALL MOUNTED ON THE ELECTRICAL DRAWINGS
|
|
> ON WALLS WHICH, ON THE ARCHITECTURAL DRAWINGS AND ELEVATIONS
|
|
> ARE SHOWN AS GLASS OR PARTITIONS,
|
|
> SHALL BE FLUSH FLOOR DUPLEX RECEPTACLES
|
|
> MOUNTED ADJACENT TO BASE OR WALLS.
|
|
|
|
### Wiring Method Selection
|
|
|
|
[[wiring-method-selection]]
|
|
|
|
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
|
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
|
|
> RACEWAYS IN SLAB-ON-GRADE OR BELOW GRADE SHALL BE SCHEDULE 40 PVC.
|
|
> TRANSITIONS FROM BELOW TO ABOVE GRADE
|
|
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
|
|
> OR APPROVED EQUIVALENT PROTECTION.
|
|
> MET FITTINGS SHALL BE MALLEABLE IRON OR STEEL.
|
|
> CONNECTORS SHALL BE INSULATED THROAT TYPE.
|
|
|
|
#### Cable Uses
|
|
|
|
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
|
> ALL WIRING SHALL BE INSTALLED IN LISTED METALLIC RACEWAYS.
|
|
|
|
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 27
|
|
> STEEL TYPE "MC" CABLE #12 AWG AND #10 AWG
|
|
> WITH A FULL-SIZED GROUNDING CONDUCTOR
|
|
> MAY BE USED WHERE PERMITTED
|
|
> BY BOTH THE N.E.C. AND LOCAL ORDINANCE,
|
|
> IN THE FOLLOWING APPLICATIONS:
|
|
> * A. IN WALLS FOR HORIZONTAL DEVICE CONNECTION ONLY.
|
|
> HOMERUNS TO PANELBOARDS SHALL BE EMT OR PVC (BELOW GRADE).
|
|
|
|
#### Rigid Elbows
|
|
|
|
Rigid elbows are required,
|
|
but neither proposal mentions them.
|
|
|
|
> [!cite] E.0.X.1 - "ELECTRICAL NOTES" Note 32
|
|
> TRANSITIONS FROM BELOW TO ABOVE GRADE
|
|
> SHALL BE WITH RIGID STEEL ELBOWS WITH P.V.C. JACKET
|
|
> OR APPROVED EQUIVALENT PROTECTION.
|
|
|
|
#### Fire Alarm Wiring Methods
|
|
|
|
### Differences in Scope Between Customers
|
|
|
|
2 Customers
|
|
KAST Construction
|
|
Hedrick Brothers Construction
|
|
Different scope
|
|
|
|
DAS Conduit in separate bid item
|
|
|
|
#### Awarded to Hedrick Brothers?
|
|
|
|
> [!quote] Nicole Bisbee 2026-03-23, BPM
|
|
> Per correspondence from KAST
|
|
> "Please note that KAST has **not** been awarded this project.
|
|
> It appears the project will be undertaken by Hedrick Brothers."
|
|
|
|
Most recent proposal to KAST is 2026-02-26.
|
|
Assuming this one can be ignored.
|
|
|
|
Confirmed by Joshua Komis 2026-04-20 via Microsoft Teams.
|
|
|
|
### AIC Ratings
|
|
|
|
> [!quote] E.4.X.1 "RISER NOTES" (B)
|
|
> ALL BREAKERS SHALL BE SERIES RATED AT 22K TO THE MAIN BREAKER.
|
|
> MAIN BREAKER AIC RATING IS 65K.
|
|
> UNIT APARTMENT PANELBOARD MAIN BREAKER AIC RATING 10K.
|
|
> SEE ATTACHED DETAIL ON SHEET E-6.4 FOR FURTHER DETAILS.
|
|
|
|
### Lighting Inverters
|
|
|
|
> [!quote] E.2.1.1 "KEY NOTES" 2
|
|
> LIGHTING CIRCUIT TO BE ROUTED THROUGH INVERTER.
|
|
|
|
## Problems to Solve
|
|
|
|
ADA units likely exist, but are not shown on floor plans.
|