id: 2026-02-26T10:06:19-0500
|
||
title: "2026-02-26 10:06:19"
|
||
tags:
|
||
- status/draft
|
||
- occupational/takeoff
|
||
date-created: 2026-02-26T10:06:19-05:00
|
||
daily: "[[2026-02-26]]"
|
||
---
|
||
# 2026-02-26 10:06:19
|
||
|
||
## Fire Alarm Wiring Methods
|
||
|
||
direction for [[fire-alarm-takeoff]]
|
||
as confirmed by [[joel-jansen]]:
|
||
|
||
> [!quote] Zane Meyers @ 09:35 to Joel Jansen via Teams regarding [[1990-k-street]]
|
||
> From our Pre-Takeoff email:
|
||
>
|
||
> > **Fire Alarm:** Devices PVC in-slab, Risers EMT.
|
||
>
|
||
> Still PVC for Retail shell and Amenity, Building areas with dropped ceilings?
|
||
|
||
### Regarding Retail
|
||
|
||
> [!quote] Joel Jansen @ ~10:00 (pp.)
|
||
> Use EMT for Retail shell spaces.
|
||
> Sometimes Free-Air may be acceptable, but assume not.
|
||
> Seek guidance where Retail space is significant.[^1]
|
||
|
||
[^1]: See [[belle-meade-plaza]] Retail Village for example.
|
||
|
||
### Regarding Amenity, Building
|
||
|
||
> [!quote] Joel Jansen @ ~10:00 (pp.)
|
||
> Confirmed, follow Pre-Takeoff email.
|
||
>
|
||
> In general,
|
||
> for [[pdi-building-types#High Rise|high-rise]] projects,
|
||
> assume Free-Air devices will not be allowed
|
||
> in other than [[units-takeoff|Units]].
|
||
|
||
I expressed that,
|
||
from a [[heuristics#Realism vs. Instrumentalism|realist]] perspective,
|
||
the `... DEVICES WITH WIRE - PVC` assemblies
|
||
are unsuitable for use in drop ceilings
|
||
since they don't provide a flex whip and box.
|
||
|
||
> [!quote] Joel Jansen @ ~10:00 (pp.)
|
||
> It is understood that the assemblies are not strictly suitable,
|
||
> their use is intended to be budgetary.
|