226 lines
6.5 KiB
Markdown
226 lines
6.5 KiB
Markdown
---
|
|
id: 2026-03-09T15:50:49-0400
|
|
title: 2026-03-09 15:50:49
|
|
tags:
|
|
- status/draft
|
|
daily: "[[2026-03-09]]"
|
|
up: "[[conest-pre-takeoff-email-template]]"
|
|
date-created: 2026-03-09T15:50:49-04:00
|
|
---
|
|
# 2026-03-09 15:50:49
|
|
|
|
## Pre-Takeoff Confirmation --- Charlotte South End Hotel
|
|
|
|
%%
|
|
Implementation of [[conest-pre-takeoff-email-template]]
|
|
for [[charlotte-south-end-hotel]]
|
|
%%
|
|
|
|
Hello Team,
|
|
|
|
Below is a comprehensive list of means & methods
|
|
for **Charlotte South End Hotel**.
|
|
Please confirm you have received this email
|
|
and respond with any questions or comments.
|
|
|
|
* **Delivery Method:** Plans & Specs
|
|
* **Document Stage:** Issue for Permit
|
|
* **Drawings Date:** 2026-02-27
|
|
* **Project Manual Date:** 2026-02-27
|
|
* **Proposal Date:** 2025-12-12
|
|
* **Takeoff Request Stage:** Full Takeoff
|
|
|
|
### Project Specification Callouts
|
|
|
|
* **Conduit:**
|
|
* EMT Fittings: _---Spec 260510 2.4(N)(2) (p. 2226)_
|
|
* Smaller than trade size 2-1/2": Compression
|
|
* Trade size 2-1/2" and larger: Set-screw
|
|
|
|
* **Wire:**
|
|
* Material: Aluminum 1 AWG and larger _---Spec 260510 2.2(C)(1) (p. 2224)_
|
|
* Acceptable Manufacturers: _---Spec 260510 2.2(D) (p. 2224)_
|
|
* Encore Wire
|
|
* General Cable
|
|
* Okonite
|
|
* Paranite
|
|
* Pirelli
|
|
* Senator
|
|
* Southwire
|
|
|
|
* **MC Cable:**
|
|
* Application: "dry locations only where approved by code authority."
|
|
_---Spec 260510 2.4(N)(8) (p. 2227)_
|
|
|
|
* Acceptable Manufacturers: _---Spec 260510 2.2(E) (p. 2224)_
|
|
* Alflex
|
|
* AFC
|
|
* America Metal Moulding
|
|
* Encore Wire
|
|
* Southwire
|
|
|
|
* **Steel Box Depth:** Not specified _---Spec 260510 2.12(A) (p. 2231)_
|
|
|
|
* **Floor Boxes:** _---Spec 260510 2.12(E) (p. 2231)_
|
|
* Box Material:
|
|
* Slab on grade: Cast iron
|
|
* Slabs above grade: Stamped steel
|
|
|
|
* Cover Material: Not specified.
|
|
|
|
* **Wiring Devices:**
|
|
* All Areas:
|
|
* Current rating: 20A _---Spec 260510 2.16(B)(1) (p. 2231)_
|
|
* Standard/Decora: Decora _---Spec 260510 2.16(D) (p. 2231)_
|
|
|
|
* **Switchboards:**
|
|
* Bus Material: "aluminum or copper, tin or silver plated" _---Spec 262000 2.6(C)(4) (p. 2297)_
|
|
* OCPD Interrupting Current Ratings: Not specified.
|
|
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
|
|
* Eaton
|
|
* ABB/GE
|
|
* Schneider Electric
|
|
* Siemens
|
|
|
|
* **Panelboards:**
|
|
* Bus Material: "silver plated copper or electro-tin plated aluminum"
|
|
_---Spec 262000 2.8(E) (p. 2303)_
|
|
|
|
* Breaker Types: Bolt-on _---Spec 262000 2.9(C) (p. 2303)_
|
|
|
|
* OCPD Interrupting Current Ratings:
|
|
* Distribution Panelboards: Not specified.
|
|
* Lighting and Appliance Panelboards: Not less than 10kAIC
|
|
_---Spec 262000 2.10(A)(3) (p. 2304)_
|
|
|
|
* Acceptable Manufacturers: _---Spec 262000 2.17(C) (p. 2307)_
|
|
* Eaton
|
|
* ABB/GE
|
|
* Schneider Electric
|
|
* Siemens
|
|
|
|
* **Transformers:**
|
|
* Winding Material:
|
|
"Transformer windings shall be manufacturer's standard design,
|
|
copper or aluminum conductor. Bussing shall be copper."
|
|
_---Spec 262002.5(L) (p. 2296)_
|
|
|
|
* K-Rating: Only as shown (None shown)
|
|
_---Spec 262002.5(K) (p. 2295)_
|
|
|
|
* Acceptable Manufacturers: _---Spec 262000 2.17(D) (p. 2307)_
|
|
* Eaton
|
|
* ABB/GE
|
|
* Heavy Duty
|
|
* MGM
|
|
* Siemens
|
|
* Schneider Electric
|
|
* United Power Corp
|
|
|
|
* **Generator:** (1) 500kW Diesel _---Dwg. E05-12_
|
|
* Enclosure Specs: Not specified.
|
|
* Remote Tank: None shown or specified.
|
|
* Tank Size: 12hrs at full load _---Spec 263213 2.7(C) (p. 2326)_
|
|
* Load Banks: None shown or specified.
|
|
* Acceptable Manufacturers: _---Spec 263213 2.1(A) (p. 2323)_
|
|
* Caterpillar Tractor Co.
|
|
* Cummins/Power Generation
|
|
* Kohler Power Systems (MTU Engine Only)
|
|
* MTU On-Site Energy
|
|
|
|
### Project Drawing/Detail Callouts
|
|
|
|
* Describe conflicts between drawings / proposal:
|
|
%% "Plans show CU feeders, proposal calls for aluminum", Specification grade devices, etc. %%
|
|
|
|
* Cost drivers in details not shown elsewhere on plans:
|
|
|
|
### PDI System Execution Plan
|
|
|
|
* **Primaries:** Conduit only; wiring, duct bank by others.
|
|
|
|
* **Secondaries:** Aluminum bus duct. _---Spec 262000 2.11(D) (p. 2305)_
|
|
%% PVC UG, GRC Stub-ups, AL %%
|
|
|
|
* **Feeders:**
|
|
PVC UG, EMT OH.
|
|
Size and material per E05-10 schedule
|
|
(AL 100A and larger,
|
|
==transformer primaries and secondaries all copper==).
|
|
Voltage drop not considered
|
|
(allowance per E00-00, "GENERAL PRICING NOTES").
|
|
%% PVC UG, EMT OH, AL over 100A, 2% VD %%
|
|
%% Emergency Feeds MI Cable %%
|
|
|
|
* **Unit Subfeeds:**
|
|
#12 Multi-Circuit MC OH.
|
|
Voltage drop not considered
|
|
(allowance per E00-00, "GENERAL PRICING NOTES").
|
|
%% MC OH AL, VD per Chart on E5.01 %%
|
|
%% [[2026-03-10_13-51-32#Voltage Drop]] %%
|
|
|
|
* **Units:**
|
|
* VFCU HVAC
|
|
* 20A Decora Switches
|
|
* 20A Decora Receptacles
|
|
* Master Switch control
|
|
* Floor boxes (0--1 per K, QQ unit; 2 per 2B, 3B unit)
|
|
%% 15A Decora, Disposals, T-stat, Floor Boxes, Shade Control, Doorbells, Dimmer Switches, etc. %%
|
|
|
|
* **Telecom:**
|
|
Rough-in only, system alternate.
|
|
Free-air where allowed by code.
|
|
EMT Risers.
|
|
|
|
* **EV Chargers:** Excluded (alternate).
|
|
%% (42) Conduit only, (56) Conduit & Wire, (20) Conduit, Wire & Equipment %%
|
|
%% [[2026-03-10_13-51-32#EV Chargers]] %%
|
|
|
|
* **Fire Alarm:**
|
|
Free-air where allowed by code.
|
|
EMT Risers.
|
|
|
|
* **DAS:**
|
|
Rough-in only, per PDI DAS Design.
|
|
|
|
* **Low Voltage:**
|
|
Free-air where allowed by code.
|
|
Stub-ups to accessible ceilings.
|
|
_---Proposal 2025-12-12 Ex. B Notes_
|
|
|
|
### Lighting Control
|
|
|
|
%% [[2026-03-10_13-51-32#Lighting Control]] %%
|
|
|
|
* **Applicable Code:**
|
|
2024 North Carolina Energy Conservation Code
|
|
(2021 IECC with NC Amendments)
|
|
_---Dwg. G00-11_
|
|
|
|
* **Basis of Takeoff:** Central dimming system per P&S, PDR quote.
|
|
|
|
* **By Area:**
|
|
* Units: Master Switch, Digital Standalone Control, 0-10V dimming.
|
|
* Amenity: Digital Central Control, 0-10V dimming.
|
|
* Corridors: 0-10V dimming per 2021 IECC and LEED checklist.
|
|
* BOH: Line voltage control.
|
|
* Garage: Line voltage control (integral dimming occupancy sensors).
|
|
%% Assign Method to Areas: Line Voltage, Low-Voltage Stand Alone or Centralized System %%
|
|
|
|
### Tasks/Quotes Needed for WBS
|
|
|
|
%%
|
|
Only tasks that are not already open.
|
|
%%
|
|
|
|
* DAS Public Safety Raceway Design
|
|
%% Necessary because we own DAS pathways but not the system %%
|
|
|
|
%%
|
|
* Electrical Constructability Review
|
|
* Electrical VDC
|
|
* Coordination Study
|
|
%%
|
|
|
|
Thank you,
|