Hampton Roads Navy - Norfolk: Director Review
estimating-director-review of hampton-roads-navy_norfolk lead by corwin-fluit, attended by christian-pereiro, joel-jansen, and myself.
Lighting Control
- Corridors: $10 per linear foot
- Amenity: $5 per square foot
Digital lighting control is required
- FALSE: Multiple occupancy sensors per zone necessitates digital control.
- FALSE: 0-10V dimming necessitates digital control.
- FALSE: 0-10V dimming + occupancy sensing necessitates digital control.
- TRUE: 0-10V dimming controlled by occupancy sensing necessitates digital control.
Systems refused to quote lighting control due to lack of detail, but sufficient detail was provided.
pdi-bid-estimating expected takeoff to include DLM devices and cabling.
Closeout
On Base - Newport News is not
Carried labor for lost time due to badging
Equipment
[!quote] Corwin Fluit 2026-02-10
AUGER ON BOBCAT (per pole)does not include cost for setting pole
Free Notes
Ops creates, approves the labor plan. This limits our ability to make interesting decisions: MC cable ILO PVC in-slab pushes the schedule out.
estimating-golf question, asked by Corwin: "Are the electric rooms stacked?"
Thoughts
Corwin
Corwin is a true estimator. I've met few people more willing to make calculations and give confident estimates in conversation.
He understands the necessity of accepting and accounting for risk.
He is as critical of overly-heavy estimates as light estimates. He specifically prefers accurate line item costs with a single contingency over inflated individual budgets.