vault backup: 2025-12-08 16:37:36

This commit is contained in:
2025-12-08 16:37:36 -05:00
parent cb49b3b7b6
commit 17f84d150c
43 changed files with 1168 additions and 266 deletions
+18 -23
View File
@@ -26,41 +26,37 @@ title: Distributed Antenna Systems (DAS) Takeoff
### FACR to Every Elevator Shaft
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO ELEV PIT = ...`
Match Fire Alarm takeoff Length and Count
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO ELEV PIT = ...`
* **Length** = _Match Fire Alarm takeoff Length_
* **Count** = _Match Fire Alarm takeoff Count_
### FACR to Every Staircase
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO STAIRWELL = ...`
Match Fire Alarm takeoff Length and Count
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO STAIRWELL = ...`
* **Length** = _Match Fire Alarm takeoff Length_
* **Count** = _Match Fire Alarm takeoff Count_
### Stairwell Riser Every 2 Floors
> [!info] Takeoff
> * `Area` = "Typical - Stairwells Building Even Levels"
>
> 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`STAIRWELL RISER EVERY 2 FLRS = ...`
> * **Count** = Each stairwell
1. * `Area` = "Typical - Stairwells Building Even Levels"
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`STAIRWELL RISER EVERY 2 FLRS = ...`
* **Count** = Each stairwell
### FACR to Electric Room
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO 2HR-RATED RM = ...`
Match Fire Alarm takeoff Length
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`FACR TO 2HR-RATED RM = ...`
* **Length** = _Match Fire Alarm takeoff Length_
### Electric Room Riser to Every Floor
`COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`2HR-RATED RM RISER TO EVERY FLR = ...`
Takeoff in every Electric Room
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`2HR-RATED RM RISER TO EVERY FLR = ...`
* **Count** = Each Electric Room
### Top 2H Rated Room To Roof
> [!info] Takeoff
> 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = ...`
> * **Length** = 15ft or height of ceiling on last building level
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`TOP 2HR RATED RM TO ROOF = ...`
* **Length** = Top level ceiling height to structure (minimum 15ft)
## Horizontal
@@ -68,6 +64,5 @@ Takeoff in every Electric Room
> Usually only for cellular DAS.
> Confirm takeoff requirement with [[pdi-estimating#Bid Estimating|Bid]].
> [!info] Takeoff
> 1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`CORRIDORS ...`
> * **Length** = Length measured for every corridor/garage
1. `COMMON ASSEMBLIES`/`FIRE ALARM & DAS SYSTEMS`/`DAS ASSEMBLIES`/`CORRIDORS ...`
* **Length** = Length measured for every corridor/garage