vault backup: 2025-07-22 16:59:59
This commit is contained in:
@@ -1,3 +1,51 @@
|
||||
# Construction Estimating
|
||||
|
||||
Construction estimating is a subset of cost estimation.
|
||||
Construction estimating is a subset of cost estimation.
|
||||
|
||||
## Purpose
|
||||
|
||||
The purpose of [[construction-estimating]] in practice
|
||||
is not to determine the cost of the scope,
|
||||
which would take far longer than allotted for bid,
|
||||
|
||||
### For the Solicitor
|
||||
|
||||
* Determine feasibility of functional requirements
|
||||
|
||||
> [!info] Type 2 Owners
|
||||
> For some owners, money is no object,
|
||||
> and standardization is far more important
|
||||
> than any potential construction savings.
|
||||
>
|
||||
> These owners can be expected to decline every [[value-engineering]] option offered
|
||||
> (see [[gold-plating]]).
|
||||
|
||||
### For the Contractor
|
||||
|
||||
* Make profit to meet growth target
|
||||
* Secure work for current and projected employees (fill backlog)
|
||||
|
||||
%% TODO: "Determine the sale price of a service" %%
|
||||
|
||||
> [!aside]
|
||||
> I take increasing issue with the common model
|
||||
> of measuring operational success by negative overrun,
|
||||
> as it is incompatible with the preferable target of estimate certainty.
|
||||
|
||||
#### The Role of the Estimator
|
||||
|
||||
The role of the estimator is to model the potential cost distribution of the project,
|
||||
taking actions to reduce the model's uncertainty.
|
||||
|
||||
The effect of estimating methods can be represented as $d\sigma$,
|
||||
thus efficiency is $\frac{d\sigma}{dt}$.
|
||||
|
||||
#### The Role of the Executive
|
||||
|
||||
The role of the executive is to allocate profit and contingency
|
||||
according to the potential cost distribution
|
||||
weighted by the organizational desire to win the project.
|
||||
|
||||
$$
|
||||
{E}[P]=
|
||||
$$
|
||||
|
||||
Reference in New Issue
Block a user