@@ -5,5 +5,7 @@ Also "single-point estimation" as opposed to the standard three-point.
"Traditional estimating methods" as referenced frequently in [[this notebook]]
are those [[construction-estimating]] methods that produce:
* an exhaustive and specific bill of material
* a single definitive final price for each bid item
* an *exhaustive* and *specific* bill of material
* a single, definitive final price for each bid item
Such methods lack the ability to intelligently express [[uncertainty]].