vault backup: 2025-07-24 16:44:33
This commit is contained in:
@@ -0,0 +1,71 @@
|
||||
---
|
||||
id:
|
||||
aliases: []
|
||||
tags:
|
||||
- systems/units
|
||||
---
|
||||
# Unit Takeoff
|
||||
|
||||
## Info
|
||||
|
||||
"Units" includes [hotel](#hotel) and [residential](#residential) spaces.
|
||||
|
||||
> [!tip] Preparing for Unit Takeoff
|
||||
> Units generally have very little variation.
|
||||
> It is usually best to copy-paste takeoffs
|
||||
> rather than re-build them for each unit.
|
||||
|
||||
> [!info] Americans with Disabilities Act (ADA) Terms
|
||||
> * hearing impaired (HI or H.I.)
|
||||
> * mobility features (MF or M.F.)
|
||||
> * accessible (Acc.)
|
||||
> * usually refers to mobility features.
|
||||
|
||||
### Hotel
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Guestrooms
|
||||
> * Keys
|
||||
|
||||
> [!trivia]
|
||||
> The origin of the term "key" as a synonym of "hotel room"
|
||||
> ...
|
||||
> %% TODO: %%
|
||||
|
||||
### Residential
|
||||
|
||||
> [!info] Also Known As
|
||||
> * Condos
|
||||
|
||||
## Sequence
|
||||
|
||||
### 1. Estimate preparation
|
||||
|
||||
1. Locate Unit panels and relevant keynotes
|
||||
* Bus amps
|
||||
|
||||
2. Read about the project specifications and construction type
|
||||
* Wood or Metal studs
|
||||
* Wiring Method
|
||||
* NM or MC
|
||||
* Wiring device plates
|
||||
* Decora or Standard
|
||||
* Wiring device specs
|
||||
* are 15A devices allowed?
|
||||
* Equipment (20A Kitchen and bath)
|
||||
|
||||
3. Fill out OneNote
|
||||
|
||||
### 2. Takeoff
|
||||
|
||||
1. Kitchen and Bath
|
||||
2. General assemblies
|
||||
3. Low Voltage
|
||||
4. Lighting Control
|
||||
5. Lighting Fixtures
|
||||
|
||||
Copy paste original takeoff and adjust to changes
|
||||
|
||||
### 3. Extension (Review and Checking)
|
||||
|
||||
1. Scroll through with Area selected and make sure there is takeoff for each unit type
|
||||
Reference in New Issue
Block a user